Loading...
HomeMy WebLinkAboutdraft corrected BOD Comm AluChem Ann-zoneOFFICE OF THE CITY MANAGER LITTLE ROCK, ARKANSAS BOARD OF DIRECTORS COMMUNICATION SEPTEMBER 3, 2019 AGENDA Subject Action Required Approved By Annexation 335 — AluChem Annexation & Ordinance Z -9432 AluChem PID Resolution Approval Submitted By: Information Report Planning and Development Bruce Moore SYNOPSIS The annexation of some 18 acres plus or minus west of Arch Street Pike, near Dixon Road (105 00 Arch Street Pike) to the City of Little Rock and Zone to PID, Planned Industrial Development. The site of AluChem industrial plant, recognizing the existing uses and allowing for an expansion with I -3, Heavy Industrial Uses permitted. FISCAL IMPACT None RECOMMENDATION Staff recommends approval. By a vote of 8 for, 0 against, 2 absent, and 1 open position the Planning Commission recommend the annexation and Planned Industrial Development zoning at their August 1, 2019 hearing. BACKGROUND This site is a developed industrial plant. Several buildings make up the plant `campus'. The site is not on a street, but has access through the industrial property to its east to Arch Street Pike. The cluster of small buildings is located west and behind the Porocel plant on Arch Street Pike at the Dixon Road intersection. One office building with a second small office, five warehouse buildings and a processing plant make up the campus. There are both paved and gravel roads within the plant campus, as well as both pathed and gravel parking areas. BACKGROUND The company processes inert, non - hazardous aluminum oxide powder. Raw materials are delivered via closed rail popper cars. Approximately eighty -five percent of the finished product is shipped out in closed popper cars and 15 percent by truck. The company plans an expansion with this annexation and the receipt of sewer, police and fire services. The expansion will excess the company's internal ability to process the waste water produced and therefore there is a need to connect to the City waste water system. The applicant has filed the Planned Industrial District as the initial zoning of their property. In addition to recognizing the existing use and buildings on the site, this is to allow for an expansion of a second production line, new washing building and expansion of a storage building. The type and nature of the business does not result in many visits to the site and access to the site is controlled via a gate. This use is a 24/7 365 day a year use. No other changes are proposed at this time to the existing facilities. The Planned Industrial District zoning will allow all I -3, Heavy Industrial Uses. 2