HomeMy WebLinkAboutpc_03 07 1995LITTLE ROCK PLANNING COMMISSION
REZONING HEARING
MINUTE RECORD
MARCH 7, 1995
12:30 P.M.
I. Roll Call and Finding of a Quorum
A Quorum was present being eight (8) in number.
II. Approval of the Minutes of the Previous Meeting
The minutes of the January 24, 1995 meeting were
approved as mailed.
III. Members Present: Brad Walker
Pam Adcock
Ramsay Ball
Diane Chachere
Doyle Daniel
Suzanne McCarthy
Bill Putnam
Joe Selz
Ron Woods (arrived after the roll call)
Members Absent: Mizan Rahman
Emmett Willis'
City Attorney: Stephen Giles
LITTLE ROCK PLANNING COMMISSION
I. DEFERRED ITEMS
A. Z -5896
B. Z- 4431 -C
C. Z -5929
II. REZONING ITEMS
1. Z- 5698 -A
2. Z -5949
3. Z -5950
REZONING HEARING
AGENDA
MARCH 7, 1995
Black Rd. and Piggee St.
Highway 10 at Taylor Loop
9222 Stagecoach Road
Bowman Rd. and Hermitage Rd.
Sibley Hole Rd. (N. of I -30)
8220 Baseline Road
R -2 to R -5
R -2 to C -3
R -2 to C -4
PCD to C -3
R -2 to C -4
R -2 to I -2
III. OTHER MATTER
4. Chenal Carwash C.U.P. - Administrative Review (Z- 4423 -B)
March 7, 1995
ITEM NO.: A Z -5896
Owner:
Applicant:
Location:
Request:
Purpose:
Size:
Existing Use:
Rose Bickerstaff
M. F. Rolih, Jr. by
Michael T. Gosby
Black Road and Piggee Street
(One Block)
Rezone from R -2 to R -5
Elderly housing
2.0 acres
Vacant
SURROUNDING LAND USE AND ZONING
North
- Vacant,
zoned
R -2
South
- Vacant,
zoned
R -2
East
- Vacant,
zoned
R -2
West
- Vacant,
zoned
R -2
STAFF ANALYSIS,
The property in question is found in the Pankey neighborhood,
and located approximately 3 blocks south of Arkansas State
Highway No. 10. The request is to rezone the site from R -2
to R -5 for elderly housing, a total of 56 units. (R -5 Urban
Residence allows a density of 36 units per acre). The
acreage is situated on the west side of Pankey and bordered
by four platted rights -of -way. The site is made up of twelve
50 foot lots and a 10 foot alley (one complete block). At
this time, there are two structures on the northern most
lots, adjacent to Piggee Street. The balance of the property
is undeveloped and heavily wooded.
The predominant zoning in the immediate area is R -2 and, in
fact, the entire Pankey neighborhood is zoned R -2. To the
northwest, there is some C -3 zoning and a PCD area. The land
use is primarily single family residences, including new
subdivisions to the south and southwest. In the Pankey
neighborhood, the land use is single family, with some minor
nonconforming uses. The uses found on the nonresidential
land are mini - storage units and a small -scale commercial
center. Throughout the area, there are vacant parcels and
lots.
A R -5 rezoning or any multifamily reclassification of this
block in conflict with the adopted plan. The land use
element of the River Mountain District plan identifies the
March 7, 1995
ITEM NO.: A Z -5896 (Cont.)
site for single family use; a majority of the Pankey
neighborhood is shown as single family. The current plan
does recommend a low - density multifamily area north of Pankey
Avenue, between Black Road and Wells Street, and another area
directly north of Highway 10. The plan also shows a small
multifamily area east of Ives Street. This land use concept
has been reinforced by the most recent planning effort for
the neighborhood, the Donaghey /Pankey plan. The Donaghey
Project worked closely with the Pankey community throughout
the planning process and relied on the residents' input for
direction. The plan has been endorsed by the Planning
Commission, but still has not been acted on by the Board of
Directors. In addition to the multifamily areas, the
Donaghey document also includes a conceptual plan for an
elderly housing project on the west side of Black Road. None
of the neighborhood or district -wide plans have ever
identified the Black Road /Piggee Street block for any use
other than single family.
Because of the plan and other factors, staff cannot support
the R -5 request for the block in question. All the planning
studies have recommended other sites for multifamily use and
no justification has been provided to change the direction of
the plan by reclassifying this particular site. Also, the
property is somewhat removed from more desirable multifamily
locations and the necessary infrastructure for such an
intense development is not in place. Rezoning the block to
R -5 would be a significant departure from the adopted plan
and could have a very negative impact on the future of
Pankey.
LAND USE PLAN ELEMENT
The site is in the River Mountain District. The adopted
Land Use Plan recommends Single Family. While the plan does
call for low density multifamily to the north, this request
is too intensive and too far removed from the major roads.
Staff cannot support such an intensive residential use in
this location at this time.
ENGINEERING COMMENTS
If the rights -of -way for the four streets are deficient,
dedication of additional right -of -way will be required. The
Master Street Plan standard is 25 feet from the centerline.
STAFF RECOMMENDATION
Staff recommends denial of the R -5 rezoning.
2
March 7, 1995
ITEM NO.: A Z -5896 Cont.
PLANNING COMMISSION ACTION: (NOVEMBER 1, 1994)
Staff reported that the request needed to be deferred
because of a possible notice problem. The item was added to
the Consent Agenda, and the Commission deferred the issue to
the December 13, 1994 hearing. The vote was 11 ayes, 0 nays
and 0 absent.
PLANNING COMMISSION ACTION: (DECEMBER 13, 1994)
Staff informed the Planning Commission that the item needed
to be deferred again because all the required property
owners had not been notified. As part of the Consent
Agenda, the R -5 request was deferred to the January 24, 1995
meeting. The vote was 9 ayes, 0 nays and 2 absent.
PLANNING COMMISSION ACTION: (JANUARY 24, 1995)
Staff reported that the item needed to be deferred because
all the necessary notice information had not been submitted.
As part of the Consent Agenda, the rezoning request was
deferred to the March 7, 1995 hearing. The vote was 9 ayes,
0 nays and 2 absent. (Staff told the Commission that this
would be the last deferral.)
PLANNING COMMISSION ACTION: (MARCH 7, 1995)
Staff reported that a written request to withdraw the
rezoning had been submitted by the agent for the applicants.
As part of the Consent Agenda, the Planning Commission voted
to withdraw the R -5 rezoning. The vote of 9 ayes, 0 nays
and 2 absent.
Q
March 7, 1995
ITEM NO.: B Z- 4431 -C
Owner:
Applicant:
Location:
Request:
Purpose:
Size:
Existing Use:
Cantrell Loop Partnership III
Tom Cole
Hwy. 10 at Taylor Loop
Rezone from R -2 to C -3
Commercial
3.8 acres
Single - Family
SURROUNDING LAND USE AND ZONING
North - Vacant, zoned R -2
South - Commercial, zoned PCD and C -3
East - Single - Family, zoned C -3
West - Single - Family, zoned R -2
STAFF ANALYSIS,
The request before the Planning Commission is to rezone 3.8
acres on Highway 10 from R -2 to C -3. The site is situated
on the north side of the highway, across from the Harvest
Foods PCD, and west of where the east end of Taylor Loop
intersects Highway 10. There are several structures on the
front half of the site and back portion is undeveloped.
The acreage has 272 feet of frontage on Highway 10 and an
average depth of 619 feet. No specific plans have been
submitted for the site.
Zoning is R -2, C -3 and PCD, with R -2 being the predominate
classification found in the immediate vicinity. The
existing PCDs are a Harvest Food Store and two branch banks.
Other land use found in the area includes single family,
commercial and a church. The C -3 to the east is a small
commercial center and there are also some single family
residences along the west side of the C -3 tract.
In 1985 a C -3 request was filed for the east half of the
property (2 acres). The C -3 was denied by the Planning
Commission and their action was not appealed to the Board of
Directors. Another rezoning proposal, R -2 to 0-2, was also
filed in 1985. Again, the request was denied by the
Planning Commission and no appeal was made to the Board of
Directors. At that time, the adopted plan did not identify
the site for any nonresidential use. Staff recommended
denial of the C -3 and the 0-2.
March 7, 1995
ITEM NO.: B Z- 4431 -C Cont.
This current C -3 application is an attempt to add commercial
acreage at the Taylor Loop intersection with Highway 10 and
expand the established node. The adopted plan, River
Mountain, does not recommend any commercial expansion on the
north side of Highway 10 and shows the site to be within a
"transition zone," office or multifamily uses. Therefore,
the proposed C -3 reclassification is in conflict with the
plan and staff does not support the request. The previous
plans for the area have been followed and no strong
justification has been offered to alter the current plan by
rezoning the 4 acres. If the plan is not maintained, staff
is concerned that it will be difficult to deny future
commercial requests in the area and this could create the
possibility of a linear /strip commercial pattern along
Highway 10, something the city has tried to avoid at all
cost. For the most part, the plans for the Highway 10
corridor have been adhered to and there is no compelling
reason to reverse this trend by endorsing the proposed C -3
reclassification.
LAND USE PLAN ELEMENT
The site is in the River Mountain District. The adopted
land use plan recommends Transition Zone. The request is in
conflict with the plan. The staff does not believe it is
justifiable to amend the Plan from Transition Zone to
Commercial at this time.
ENGINEERING COMMENTS,
The right -of -way requirement
55 feet from the centerline.
right -of -way will be required
is deficient.
STAFF RECOMMENDATION
for Highway 10 /Cantrell Road is
Dedication of additional
if the existing right -of -way
Staff recommends denial of the C -3 rezoning request.
PLANNING COMMISSION ACTION:
(DECEMBER 13, 1994)
Staff reported that the item needed to be deferred because
of a possible notice. As part of the Consent Agenda, the
C -3 request was deferred to January 24, 1995. The vote was
9 ayes, 0 nays and 2 absent.
E
March 7, 1995
ITEM NO.: B Z- 4431 -C Cont.
PLANNING COMMISSION ACTION: (JANUARY 24, 1995)
Staff reported that the applicant had requested another
deferral. As part of the Consent Agenda, the item was
deferred to the March 7, 1995 meeting. The vote was 9 ayes,
0 nays and 2 absent.
PLANNING COMMISSION ACTION: (MARCH 7, 1995)
Staff informed the Planning Commission that the item needed
to be deferred because proper notice had not been given to
the required property owners. As part of the Consent
Agenda, the Commission voted to defer the issue to the April
18, 1995 meeting. The vote was 9 ayes, 0 nays and 2 absent.
V
March 7, 1995
ITEM NO.: C Z -5929
Owner:
Applicant:
Location:
Request:
Purpose:
Size:
Existing Use:
Gerald Staley
Gerald Staley
9222 Stagecoach Road
Rezone from R -2 to C -4
Retail and storage complex
19.2 acres
Vacant
SURROUNDING LAND USE AND ZONING
North - Vacant and Single - Family, zoned R -2
South - Vacant, zoned R -2
East - Single - Family, zoned R -2
West - Vacant, zoned MF -6
STAFF ANALYSIS,
The property in question, approximately 20 acres, is located
on the west side of Stagecoach Road (Hwy. No. 5) between
West Baseline Road and the entrance to Otter Creek. The
acreage is zoned R -2 and the request is to reclassify the
entire 20 acres to C -4. At this time, the proposal is to
develop the site for retail, office warehouse and mini -
storage units - a "retail and storage complex." The
tentative plans call for the commercial uses to be located
adjacent to Stagecoach, then an office warehouse area and
the mini - storage units towards the back of the property. No
specific plans have been submitted and the only issue before
the Commission is the request for a C -4 rezoning. The site
has 950 feet of frontage along Stagecoach Road and an
average depth of 1,100 feet.
Zoning in the general vicinity is R -2, MF -6, MF -12, MF -18,
0-2, C -2, C -3, I -2 and OS. The existing commercial zoning
is found at the Stagecoach /Baseline intersection and the I -2
is north of Baseline. There is also some C -1 and C -2 zoning
at Stagecoach and Otter Creek development. The Otter Creek
commercial zoning was accomplished through a master plan for
the development and has always been viewed as the community
shopping center for the area. The commercial zoning at
Stagecoach and Baseline has occurred because of being the
intersection of two arterials. Land use is primarily single
family. Other uses include a church, commercial and
industrial. There are several nonconforming uses and a high
percentage of the area is undeveloped, especially the
March 7, 1995
ITEM NO.: C Z -5929 Cont.
existing multifamily tracts. To the east of Stagecoach
Road, there is a substantial floodway which prohibits any
development.
The adopted Otter Creek District Plan shows the site as part
of a large multifamily area and does not recognize any of
the 20 acres for commercial use. The commercial areas
identified on the plan are adequate to serve the area for
the foreseeable future and there is no justification to
increase the commercial inventory by supporting the
requested C -4 reclassification. Allowing this rezoning
could encourage other commercial requests and which could
lead to an undesirable strip development pattern along
Stagecoach Road. Rezoning a 20 acres site to C -4 at this
location could create immediate problems for the surrounding
uses and could affect future development in the area. This
location has never been identified for any use other than
residential.
LAND USE PLAN ELEMENT
The site is in the Otter Creek District. The Plan
recommends Multifamily use. There has not been a change in
condition to justify a change in the land use plan to this
degree. Beside the land use conflict, there are concerns
the zoning could lead to strip development along Stagecoach
Road and the undesirability of C -4 Open Display zoning next
to Low Density Residential use areas.
ENGINEERING COMMENTS,
1. Stagecoach Road requires a 45 foot right -of -way from
the centerline. Dedication of additional right -of -way
if the existing right -of -way is deficient.
2. If a building permit is requested, the following will
be required:
• A sketch grading and drainage plan meeting the
requirements of Section 29 -186 is required. A
Development Permit will be required before any work
is started.
• Sidewalks will be required.
• Street plans, stormwater detention, and stormwater
drainage will be required. Full 1/2 of 60 foot
minor arterial street improvements. 100 percent of
upgrade of culvert crossing Stagecoach.
• Driveways will require approval of Traffic
Engineering.
2
March 7, 1995
ITEM NO.: C Z -5929 Cont.
• AHTD will need to approve proposal.
STAFF RECOMMENDATION
Staff recommends denial of the C -4 rezoning request.
PLANNING COMMISSION ACTION: (JANUARY 24, 1995)
The applicant, Gerald Staley, was present. There were
several other interested persons in attendance. Mr. Staley
spoke and requested a deferral to the March 7, 1995 meeting.
Nobody objected to deferring the rezoning request.
The item was added to the Consent Agenda and deferred to the
March 7, 1995 hearing. The vote was 9 ayes, 0 nays and
2 absent.
PLANNING COMMISSION ACTION: (MARCH 7, 1995)
Staff reported that a withdrawal request had been submitted.
There were two interested persons in attendance and neither
objected to withdrawing the rezoning. As part of the
Consent Agenda, the item was withdrawn by the Planning
Commission. The vote was 9 ayes, 0 nays and 2 absent.
Q
March 7, 1995
ITEM NO.: 1 Z- 5698 -A
Owner:
Applicant:
Location:
Request:
Purpose:
Size:
Existing Use:
George Haville, Bob Boyd,
Odelle Morris and Houston Nutt
C. J. Cropper
Bowman Road and Hermitage Road
Rezone from PCD to C -3
Commercial
6.01 acres
Single Family and Vacant
SURROUNDING LAND USE AND ZONING
North - Commercial, zoned PCD
South - Vacant, zoned R -2
East - Office and Mini - Warehouse Units, zoned POD
West - Vacant and Commercial, zoned R -2 and C -3
STAFF ANALYSIS,
In 1993, a PCD was approved for the southeast corner of
Bowman and Hermitage. (The site was reclassified from R -2
to PCD.) The current request before the Planning Commission
is to rezone the 6 acres to C -3. The PCD was for a "retail
business center" and the approved site plan proposed one
building for the property. The site is four platted lots,
two are undeveloped and two have single family residences.
The property has approximately 600 feet of frontage on
Bowman and 440 feet along Hermitage.
The zoning pattern includes R -2, 0-3, C -3, PCD and POD. The
existing C -3 areas are found along Chenal Parkway, Kanis and
Bowman, with a significant C -3 involvement at the Chenal
Parkway /Bowman intersection. The property in question is
surrounded by residential and nonresidential zoning. Land
use in the general vicinity is single family, office,
commercial, mini - warehouse units and a hospital facility.
There are several major commercial user in the immediate
neighborhood and they are Wal -Mart, Home Quarters and Best
Buy. Some of the other commercial uses are a garden center
and a beverage shop. Throughout the area, there are still
some undeveloped parcels.
The adopted I -430 District plan recommends commercial for
this site and the area to the east. Therefore, a C -3
reclassification conforms to the plan and is appropriate for
the property. The previous rezonings have established the
March 7, 1995
ITEM NO.: 1 Z- 5698 -A (Cont.)
pattern for the area and the proposed C -3 rezoning will not
introduce a new land use element into the neighborhood.
(Because of the PCD classification, the Planning Commission
will need to pass a resolution recommending revocation of
the PCD in addition to acting on the rezoning.)
LAND USE PLAN ELEMENT
The site is in the I -430 Planning District. The City's
adopted Land Use Plan recommends commercial use for the
area. However, since this site is in an area where most
sites have had additional requirements placed them, a site
plan review or further requirements might be considered.
ENGINEERING COMMENTS
1. Dedication of additional right -of -way for a turn lane
on Bowman and for Hermitage. The right -of -way standard
for Hermitage is 30 feet from the centerline.
2. Construct half of a five lane minor arterial and a
right turn on Bowman at Hermitage, with a 150 foot
storage lane and 125 foot taper.
3. Sidewalks on both streets, stormwater detention and a
grading permit are all required.
STAFF RECOMMENDATION
Staff recommends approval of the C -3 rezoning.
PLANNING COMMISSION ACTION: (MARCH 7, 1995)
The applicant, C. J. Cropper, was present. There was one
interested person in attendance. Mr. Cropper made a brief
statement and was prepared to answer any questions.
Ruth Bell, League of Women voters, addressed the Commission.
Ms. Bell mentioned the just completed traffic study for the
Chenal Parkway and that it recommended less intense zoning
along the corridor. Ms. Bell went on to discuss the traffic
problems and other concerns. Ms. Bell said that the city
was rushing into something with the proposed C -3 rezoning
and offered some additional comments.
C. J. Cropper spoke and said that the PCD was approved for
all C -3 uses and some auto related uses. Mr. Cropper said
the C -3 would lessen the intensity and not make it more
intense. He indicated that the PCD developer had lost the
0a
March 7, 1995
ITEM NO.: 1 Z- 5698 -A (Cont.
option on one of the parcels. Mr. Cropper went on to
describe the ownership and said the lots ranged in size from
48,000 square feet to 88,000 square feet. Mr. Cropper
concluded by saying there was still a possibility of
combining the parcels.
Comments were then offered by several individuals, including
Commissioners Adcock and Daniel.
Stephen Giles, Deputy City Attorney, discussed the traffic
concerns and adding conditions to the rezoning.
Ruth Bell spoke again and asked the Commission to deny the
C -3 or add a condition requiring site plan review.
A motion was then made to recommend approval of the C -3
rezoning request. The motion passed by a vote of 8 ayes,
1 nay and 2 absent. The Planning Commission also adopted a
resolution recommending revocation of the PCD. The vote was
9 ayes, 0 nays and 2 absent.
3
March 7, 1995
ITEM NO.: 2 Z -5949
Owner:
Applicant:
Location:
Request:
Purpose:
Size:
Existing Use:
Otter Creek Development Company
Pat McGetrick
Sibley Hole Road (north of I -30)
Rezone from R -2 to C -4
Commercial amusement - outside
6.0 acres
Vacant
SURROUNDING LAND USE AND ZONING
North - Vacant, zoned R -2
South - Cemetery, zoned R -2
East - Industrial, zoned I -2
West - Vacant, zoned R -2
STAFF ANALYSIS
The property in question is located on the west side of
Sibley Hole, between I -30 and Baseline Road, and the request
is to rezone the 6 -acres from R -2 to C -4. At this time, the
proposed use is outside commercial amusement. To the
southeast of the property is an outside amusement facility,
Gator Golf, and it is the staff's understanding that the
proposed rezoning is to accommodate some type expansion of
Gator Golf. The property is vacant and has 350 feet of
frontage on Sibley Hole Road.
Zoning in the immediate vicinity is R -2, 0-3, C -4 and I -2.
South of the I -30, the zoning is R -2 and I -2. The property
abuts R -2 and C -4 zoning; across Sibley Hole Road, the
zoning is 0-3 and I -2. At this time, the zoning pattern
along Sibley Hole Road is mixed and it appears that the
trend is towards an area of nonresidential uses. (Because
of a recent reclassification proposal, a PD -I in Sibley Hole
Road, staff has submitted a plan amendment to the Board of
Directors which recommends a combination of office,
commercial and some light industrial uses.) Land use is
similar to the existing zoning and includes, single family,
office, funeral home, outside amusement, industrial and a
cemetery. There are only 3 occupied single family
residences on Sibley Hole Road.
The adopted plan, Otter Creek, recommends mixed office and
commercial for this part of Sibley Hole Road. Because of
the existing zoning, which includes 0-3 and C -4 staff feels
March 7, 1995
ITEM NO.: 2 Z -5949 Cont.
that the proposed C -4 is in- keeping with the direction of
the plan and supports the reclassification. With I -2 across
Sibley Hole Road and the existing uses, a C -4 rezoning
should not have an adverse impact of the nearby properties.
MOC does recommend that the PUD process be utilized with
certain development proposals, but staff does not think a
PCD is needed with this request because of the location and
the mixed zoning.
LAND USE PLAN ELEMENT
The site is in the Otter Creek District. The City's adopted
Land Use Plan recommends Mixed Office Commercial use. In
keeping with the spirit of the plan any commercial use should
be mixed and preferably include office use. Therefore,
Planning Staff would recommend a PCD.
ENGINEERING COMMENTS
1. Sibley Hole Road is classified as a "commercial"
street, and the required right -of -way is 60 feet.
Dedication of additional right -of -way will be required
because the existing right -of -way is deficient.
2. Street improvements sidewalks and a grading permit will
be required at the time of development.
STAFF RECOMMENDATION
Staff recommends approval of the C -4 rezoning request.
PLANNING COMMISSION ACTION:
(MARCH 7, 1995)
The applicant, Pat McGetrick, was present. There were two
objectors in attendance. Mr. McGetrick made some brief
statements and said C -4 was needed because the proposed use
was an expansion of Gator Golf, an outside commercial
amusement use.
Carman Breeding, a resident on Sibley Hole Road, said he was
opposed to the C -4 rezoning. Mr. Breeding then read a
statement from his wife, which outlined her opposition to
the requested rezoning. Mr. Breeding said the other
residents on Sibley Hole Road were also against the rezoning
and said it would impact the existing residences. Mr.
Breeding then discussed the area and asked the Commission to
deny the rezoning.
Sherrian Barnhill, another resident on Sibley Hole Road,
described the area and said she was against the C -4
2
March 7, 1995
ITEM NO.: 2---Z-5949 Cont.
rezoning. Ms. Barnhill said the rezoning would generate
more traffic, people and litter. Ms. Barnhill concluded by
saying the rezoning and use would have an impact the
residential properties.
Pat McGetrick reviewed the land use and the existing zoning
which includes C -4 and I -2. Mr. McGetrick also discussed
the area.
Tommy Crouch, owner of Gator Golf, said the proposed use for
the 6 acres would be a "family entertainment center" and
have a go -cart track and a game room. Mr. Crouch said that
the tentative plans call for a building and parking area to
be adjacent to Sibley Hole Road. Mr. Crouch said that there
would be some noise and the lighting would be directed
inward. Mr. Crouch also said that the track would be at
least 150 feet to 200 feet from the street.
Pat McGetrick spoke and made some comments on C -3 vs. PD -C.
Tommy Crouch responded to some questions and said the
proposed uses would extend the season 1 or 2 months.
Carman Breeding spoke again and said there were existing
problems in the area and there was inadequate police
protection.
There was a long discussion about various issues.
Pat McGetrick made some additional comments and requested a
C -4 rezoning with site plan review. (Mr. McGetrick asked
that the site plan review be placed on the April 4, 1995
agenda.)
A motion was made to recommend approval of the C -4 rezoning
with the condition that the site plan be approved by the
Planning Commission. The motion passed by a vote of 6 ayes,
3 nays and 2 absent.
3
March 7, 1995
Owner:
Applicant:
Location:
Request:
Purpose:
Size:
Existing Use:
Sam Strauss, Jr., Agent
San Strauss, Jr.
8220 Baseline Road
Rezone from R -2 to I -2
Industrial
1.03 acres
Industrial (nonconforming)
SURROUNDING LAND USE AND ZONING
North - Vacant, zoned I -2
South - Mixed, zoned R -2
East - Commercial and Warehousing, zoned I -2
West - Single Family and Church, zoned R -2
STAFF ANALYSIS,
8220 Baseline Road is zoned R -2, with a nonconforming
industrial use, and the request is to reclassify the
property to I -2. The lot is part of the Triangle Properties
Industrial District, and has always been occupied by
nonresidential uses. Currently, there is a 18,000 square
foot building on the site and a majority of it is paved.
The property has 164 feet of street frontage and a depth of
approximately 275 feet.
Zoning in the general vicinity is R -2, R -5, 0-1, C -1, C -3,
I -2 and PID. The property in question abuts R -2 and I -2;
across Baseline, the zoning is R -2. At this time, the
existing I -2 areas are found north of Baseline and a
majority of the residential zoning is on the south side of
Baseline. There are still some pockets of R -2 zoning
between Baseline and the I -30 frontage road, the Triangle
Properties Industrial District. Land use is single family,
multifamily, office, commercial, industrial and a mobile
home park. Some of the tracts north of Baseline are
undeveloped and there are a number of nonconforming uses in
the area. The established single family neighborhoods are
situated south of Baseline Road. The use pattern north of
Baseline Road is mixed and includes some residential,
commercial and industrial.
An I -2 reclassification is compatible with the area and will
not affect any of the nearby properties. The rezoning, if
granted, will recognize the established use of the property.
March 7, 1995
ITEM NO.: 3 Z -5950 (Cont.)
The proposed industrial rezoning conforms to the adopted
plan and there are no outstanding issues.
LAND USE PLAN ELEMENT
The site is in the Geyer Springs West District. The City's
adopted Land Use Plan recommends industrial. There is no
land use issue.
ENGINEERING COMMENTS,
Baseline Road is classified as a principal arterial and the
existing right -of -way is deficient. The right -of -way
standard for Baseline is 45 feet from the centerline; the
survey reflects 40 feet from the centerline.
STAFF RECOMMENDATION
Staff recommends approval of the I -2 rezoning request.
PLANNING COMMISSION ACTION: (MARCH 7, 1995)
The applicant was present. There were no objectors, and the
item was placed on the Consent Agenda. As part of the
Consent Agenda, the Planning Commission voted to recommend
approval of the I -2 rezoning. The vote was 9 ayes, 0 nays
and 2 absent.
Ofl
March 7, 1995
ITEM NO.: 4 FILE NO.: Z- 4423 -B
Name: Chenal Car Wash - Conditional
Use Permit, Administrative
Review
Location: 620 South Bowman Road
Owner /Applicant: Lee Stephens and Barksdale McKay
REQUEST:
On November 29, 1994, the Planning Commission approved a
conditional use permit allowing for the construction of a
facility containing a complete car wash and detail service
along with gas pumps and a Quick Lube (oil changing) service
on this C -3 zoned, .99 acre site.
The applicant is now ready to obtain a building permit and
has submitted a revised site plan for the project. Section
36 -108 of the Little Rock Code gives the Planning Staff
authorization to approve some changes to an approved site
plan.
After reviewing the revised site plan submitted by the
applicant, staff felt that the changes were substantial
enough to preclude staff's approving the revision.
The issue before the Planning Commission therefore is
whether or not the revised site plan is so substantially
varied from the approved site plan as to require that the
item be submitted as a new application.
PLANNING COMMISSION ACTION:
(MARCH 7, 1995)
The applicant, Barksdale McKay, was present. Staff
presented the item and gave a brief outline of the project
and the reason that it was before the Commission.
Barksdale McKay addressed the Commission. He stated that
the previously approved plan was not workable. Mr. McKay
pointed out several problems with the prior plan including a
lack of stacking space which could force vehicles out onto
the Wal -Mart parking lot. Mr. McKay then presented a
revised plan which he stated improved traffic flow on the
site and provided more stacking space. He highlighted the
proposed treatment of the Bowman Road frontage and discussed
the landscaping and screening proposed in the revised plan.
Commissioner Chachere asked Mr. McKay to point out the area
on the site where vehicles are to be vacuumed. Mr. McKay
March 7, 1995
ITEM NO.: 4 Cont. FILE NO.: Z- 4423 -B
described that area and the proposed screening associated
with it.
In response to a question from the Commission, Mr. McKay
stated that the proposed building would be one story in
height.
A brief discussion then followed concerning the treatment of
the site's Bowman Road frontage.
Chairman Walker asked what signage was proposed for the
site. Mr. McKay responded that there were limitations on
the size of the ground- mounted sign and that any wall
signage would comply with City Code.
Commissioner McCarthy stated she was concerned about the
impact of traffic from this site on the Wal -Mart parking
lot. Mr. McKay responded that the revised site plan had
less exits and more stacking space which should lessen any
traffic impact on the Wal -Mart site. He also stated that
Wal -Mart had approved the revised site plan.
Bill Henry, City Traffic Engineer, stated that the revised
site plan was better than the previously approved plan.
Dana Carney, of the Planning Staff, explained the
landscaping and signage conditions which were placed on the
site by Ordinance No. 16,235 which rezoned this property to
C -3.
A motion was made to approve the revised site plan,
determining that the revision was within the intent of the
previous approval and thus not requiring a new application.
The vote was 8 ayes, 0 noes, 2 absent and 1 abstaining
(Ball).
K,
0
cc
O
0
W
m
W
F-
O
Z
O
cn
Cn
O
V
0
z
Z
Z
J
CL
N
I
V
W
H
D
a_
a>
c
0
c
a�
P.
Ca
m
S
E--
Z
W
CO
m
Q
W
¢
z
r
V
w
Q
O
-
`
v
41,
CC<
wrr_C1
m,¢
LU Mi
W
1E
m
Z
Q
C)
CE�_
C)
r=
W
LLI
J
W
z
z
N
CO
--
[z¢
U
z
N
m
0¢C
J
i-
0
�
-jU¢
z
0
L
!�z
0
0¢
J
m
Z
0
J
z
0
o
W
Ocr
'mow
J
(1)
0
¢
m
J
a_
a>
c
0
c
a�
P.
Ca
m
S
E--
Z
W
CO
m
Q
W
¢
z
r
V
w
Q
F-
w
Z
Z[rU(nQ�wOZOUY
uj
Z
W
J¢
z N
0
LLT
W
JUZzUF
w
z
ZD
C/)
_
N
m
�
>-
0
0¢
J_
Cn
—�_Nt
n
o
J
0
3:
w
cn
Cn
-�
a_
a>
c
0
c
a�
P.
Ca
m
S
E--
Z
W
CO
m
Q
W
¢
z
r
V
w
Q
March 7, 1995
There being no further business before the Commission, the meeting was
adjourned at 2:20 p.m.
Date Kz
creta Chair7a"n
C'Z