AN ORDINANCE APPROPRIATING FUNDS AND
AUTHORIZING THE CITY MANAGER TO
EXTEND AN ENGINEERING SERVICES
CONTRACT WITH CIVIL DESIGN, INC. FOR
STREET AND DRAINAGE IMPROVEMENTS ON
EVERGREEN DRIVE - PHASE II - A CAPITAL
IMPROVEMENT BOND PROJECT.
133
WHEREAS, this project was selected by citizens as a 1988 Capital Improvement Bond
Project,
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF DIRECTORS OF THE
CITY OF LITTLE ROCK, ARKANSAS:
SECTION 1. The City Manager is authorized to transfer and appropriate the sum of $28,490
for interest monies on 1995 Capital Improvement Bond and extend an engineering services contract
with Civil Design, Inc. in an amount not to exceed $28,490 ($25,900 + 10% contingency) for
construction of street and drainage improvements on Evergreen Drive - Phase II.
SECTION 2. This ordinance shall be in full force and effect from and after its adoption.
PASSED: April 7, 1998
ATTEST:
ROBBIE HANCOCK
CITY CLERK
APPROVED AS TO FORM:
p�Lcpv, .no in . C.a��
THOMAS M. CARPE ER
CITY ATTORNEY
APPROVED:
2 - 9aLktl
JIM D EY
MAYO
® • i
134
%I
CIVIL DESIGN o
T ED
INCORPORATED
15104 CANTRELL ROAD
March 6, 1998
LITTLE ROCK, ARKANSAS
72212
Mr. Dave Scherer, P.E.
Department of Public Works
701 West Markham Street
Little Rock, Arkansas 72201
Re: Evergreen Phase II
Design Revisions, Design Additions & Bidding
Dear Dave:
Submitted herewith for your consideration is our cost proposal for the above referenced project.
Project Engineer, 96 Hours @ $75,00/Hour
$ 7,200.00
Engineer Tech I, 120 Hours @ $45.00/Hour
5,400.00
Engineer Tech 11, 80 Hours @ $40.00/Hour
3,200 00
CAD Tech, 96 Hours @ $35.00/Hour
3,360.00
Stenographer,8 Hours @ $30.00/Hour
240.00
Sub -Total
$19,400.00
Phase I Hourly Extra Work
6,500.00
Total Fee Proposal
$25,900.00
Respectfully submitted,
CIIVIIL DESIGN, INC.
William L. Dean, P.E.
Project Engineer
WLD /snh
1 ❑ ENGINEERING & SURVEYING SERVICES — 501/868 -7717 o FAX (501) 868 -5099