17703= = M e = = = = M M M 0 ORDINANCE 1W. 17,703 AN ORDINANCE APPROPRIATING FUNDS AND AUTHORIZING THE CITY MANAGER TO EXTEND AN ENGINEERING SERVICES CONTRACT WITH CIVIL DESIGN, INC. FOR STREET AND DRAINAGE IMPROVEMENTS ON EVERGREEN DRIVE - PHASE II - A CAPITAL IMPROVEMENT BOND PROJECT. 133 WHEREAS, this project was selected by citizens as a 1988 Capital Improvement Bond Project, NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS: SECTION 1. The City Manager is authorized to transfer and appropriate the sum of $28,490 for interest monies on 1995 Capital Improvement Bond and extend an engineering services contract with Civil Design, Inc. in an amount not to exceed $28,490 ($25,900 + 10% contingency) for construction of street and drainage improvements on Evergreen Drive - Phase II. SECTION 2. This ordinance shall be in full force and effect from and after its adoption. PASSED: April 7, 1998 ATTEST: ROBBIE HANCOCK CITY CLERK APPROVED AS TO FORM: p�Lcpv, .no in . C.a�� THOMAS M. CARPE ER CITY ATTORNEY APPROVED: 2 - 9aLktl JIM D EY MAYO ® • i 134 %I CIVIL DESIGN o T ED INCORPORATED 15104 CANTRELL ROAD March 6, 1998 LITTLE ROCK, ARKANSAS 72212 Mr. Dave Scherer, P.E. Department of Public Works 701 West Markham Street Little Rock, Arkansas 72201 Re: Evergreen Phase II Design Revisions, Design Additions & Bidding Dear Dave: Submitted herewith for your consideration is our cost proposal for the above referenced project. Project Engineer, 96 Hours @ $75,00/Hour $ 7,200.00 Engineer Tech I, 120 Hours @ $45.00/Hour 5,400.00 Engineer Tech 11, 80 Hours @ $40.00/Hour 3,200 00 CAD Tech, 96 Hours @ $35.00/Hour 3,360.00 Stenographer,8 Hours @ $30.00/Hour 240.00 Sub -Total $19,400.00 Phase I Hourly Extra Work 6,500.00 Total Fee Proposal $25,900.00 Respectfully submitted, CIIVIIL DESIGN, INC. William L. Dean, P.E. Project Engineer WLD /snh 1 ❑ ENGINEERING & SURVEYING SERVICES — 501/868 -7717 o FAX (501) 868 -5099