Loading...
151111 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 • • ORDINANCE NO. 15,111 AN ORDINANCE AUTHORIZING THE CITY MANAGER TO ACCEPT BIDS AND AWARD A CONTRACT FOR THE REMODELING OF FIRE STATION NO. 3; AND APPROPRIATING FUNDS. 205 NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS: Section 1. The City Manager is hereby authorized to accept bids and award a contract for the remodeling of Fire Station No. 3, for a total price not to exceed the budget and payable for the funds specified in the fact sheets. Section 2. There is hereby appropriated the sum of $60,000.00 from Revenue Sharing Funds for the remodeling of Fire Station No. 3. PASSED: June 3, 1986 ATTEST: CIT CLERK J CZECH APPROVED AS TO FORM: MARK STODOLA, CITY ATTORNEY APPROVED:. 'N� W MAYOR THOMAS A. 6-�? 5-S VM OF DIRECTORS COMMUNICA,60N M E M O R A N D U M May 21, 1986 TO: Mayor and Board of Directors ,,11 FROM: Charles Nickerson, Acting City Manager N SUBJECT: Appropriation of Funds to Remodel Fire Station No. 3 BOARD ACTION RECOMMENDED: Appropriation of $60,000 to renovate Fire Station No. 3 at 22nd and Peyton Streets. BACKGROUND INFORMATION: Fire Station No. 3 was built in 1941 and is badly in need of repairs, especially to the plumbing and electrical systems (see attachment). A total of $300,000 was originally appropriated by the Board of Directors for the renovation of Fire Station Nos. 3 and 7. Due to the scope of work required, the bid for No. 7 came in at $282,000, leaving a balance of $18,000 for Station No. 3. In addition, $23,853 has been transferred from another Fire Department account, bringing the total available money for Fire Station No. 3 to $41,853. The attached sheet shows the construction bid for this project at $101,100. It is requested that the Board appropriate the necessary funds ($60,000) to finance this project. BD /CN:vw2 CITY OF LITTLE ROCK, ARKANSAS Wi City of Little Rock U(' Department of Hman & General Services MEMORANDUM April 4, 1986 TO: Nathaniel W. Hill, Director FROM: Wendell Jones, Building Maintenance Coordinator • Administration SUBJECT: Renovation & Remodeling of Fire Station #7 & #3 At Fire Station #7 we are doing the following: 1. Relocate dormitory from upstairs to downstairs with complete new restroom, shower, lockers, both men and women, approximately 2750 sq. ft. of new space. 2. New parking lot and landscaping. 3. New dining room approximately 350 sq. ft. 4. Remodeling existing kitchen, Captain's office and renovate exterior with new storm windows, re —roof building, sandblast, and paint approximately 3500 sq. ft. of existing remodeling. 5. New mechanical system, plumbing and electrical services. At Fire Station #3 we propose to do the following: 1. Relocate kitchen and add dining area, approximately 150 additional sq. ft. 2. Remodeling existing restroom, add new locker area and shower. 3. Add three (3) new bunk beds in dormitory. 4. Add new office area, approximately 100 sq. ft. 5. New mechanical system, plumbing and electrical services. 6. Repaint exterior wood trim, add storm windows. 7. New study area and provide area for washer and dryer. Room 101 City Hall o Markham at Broadway o Little Rock, Arkansas 72201 a 371 -4785 207 CITY OF LITTLE ROCK MEMORANDUM r / • TO: FROM: DATE: SUBJECT Nathaniel Hill, Human & General Services, Director Wendell Jones, Building Maintenance Coordinator May 20, 1986 Fire Station #3 Delecte or change items to bring costs within budget. ISO, 1. Landscaping 2. Plaque 4. Windows -omit Muntins 6. Electrical 7. Tree 9. Omit storm door 11. Shower doors 13. Omit one door control panel 14. Light fixtures 15. Contingency Fund 16. Job sign 17. Sani Can 18. Overhead Door 19. Kitchens Cabinets (Birch, 20. General Contractor,labor Built -in- place) Total amount to be deducted Add Contingenc Total Deduction AMOUNT $ 500.00 600.00 948,00 500.00 350.00 100.00 200.00 550.00 500.00 1000.00 250.00 250.00 980.00 1400.00 1000.00 ' , ------ - 1,000.00 8,128.00 Contract amount 105.713.00 Deduction 8 12288000 Contract after deduction 97:585' Amount in budget - 41 853853.010 Amount needed for project 55, /3Z.UU Additional amount for Architect fee— 3,600.00 Total amount requested $ 59,332.00 • CITY OF LITTLE ROCK • PURCHASING 209 AWARD OF BIDS OR SERVICES FACT SHEET DESCRIPTION: Remodeling Fire Station #3 DISCUSSION: It is recommended that the low bid submitted by Carl Harris Const. be accepted. Their bid has been negotiated down to $97,585.00. An appropriation of $59,332.00. will be required to cover the bid price and the architect's fee. DATE May 22, 1986 RECOMMENDATION: X ACCEPT WAIVE COMPETITIVE BIDDING VENDOR: Carl Harris Construction Roland, AR BID PROCESS:. X LOW BID OTHER THAN LOW BID PROFESSIONAL SERVICES: LOW BID NEGOTIATED OTHER (EXPLAIN) FUNDING: FUND: Revenue Sharing OPERATING Q SPECIAL PROJECT AMOUNT BUDGETED: $41,853.00 Balance APPROP. OR TRANS. REQUIRED: $S9,332.00 ACCOUNT NUMBER: 499 -8415 -3.01 AMOUNT OF PURCHASE: $ Not to exceed budget BID NO: 6186 DATED: May 13, 1986 Certified By: Jerry Paul , CPPO Purchasing Agent BID NUMBER: L Rf OPENING DATE: May 13, 1986 CITY OF LITTLE ROCK ABSTRACT OF BIDS OPENED BY: Jerry Paul TABULATED BY: Paula Sparr Remodeling of • -71Arco Const. Co. L Y• Ast, Car] Harris Const. Com—koss Builders • Wwj � � 1 TOTAL - -�--