93681
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
C�
J
RESOLUTION NO. 9.368
•
A RESOLUTION AUTHORIZING THE CITY
NANAGER TO ENTER INTO AN ENGINEERING
SERVICES CONTRACT WITH SUMNERLIN
ASSOCIATES, INC., FOR THE
PRELIMINARY DESIGN OF FOURCHE DAIS
PIKE FROM RICHLAND TO PLANTATION.
2U2
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF
THE CITY OF LITTLE ROCK, ARKANSAS:
SECTION 1. The City Manager is authorized to accept bids
and enter into an engineering services contract with Summerlin
Associates, Inc., of Little Rock, Arkansas, the most qualified
bidder meeting specifications, in an amount not to exceed
$47,512 ($43,192.50 contract fee plus lot contingency) for the
preliminary design of Fourche Dam Pike from Richland to
Plantation.
SECTION 2. Funds are available for this purpose in account
number 301 - 220 -0061.
SECTION 3. This resolution shall be in full force and
effect from and after its adoption.
ADOPTED: April 18, 1995
y it • Z4 L4
r