Loading...
92151 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 0 0 RESOLUTION No. 9,215 380 A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT BIDS AND AWARD A CONTRACT FOR INSTALLATION OF TRAFFIC SIGNALS AT THE INTERSECTION OF NAPA VALLEY AND ST. CHARLES AND THE INTERSECTION OF WEST 36TH STREET AND BOYLE PARR ROAD. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS: SECTION 1. The City Manager is authorized to accept bids and award a contract to L.E.G. Enterprise, of Cabot Arkansas, the low bidder meeting specifications, in an amount not to exceed $83,606.25 for the installation of traffic signals at the intersection of Napa Valley and St. Charles and the intersection of West 36th Street and Boyle Park Road. SECTION 2. Funds are available for this purpose in account number 210 -220- 0143 -7050. SECTION 3. This resolution shall be in full force and effect from and after its adoption. ADOPTED: August 16, 1994 : • - _I S _! 1 • : �i�` • 51' � //i .gam' V ATTORNEY THOMAS M. CA"ENTMq CITY k? 1 13 BID TABULATION • TRAFFIC SIGNAL INSTALLATION Boyle Perk Road and 36th Street CMM CMM LEG L G CITY PRICE TOTAL PRICE TOTAL ITEMDESCRIPTION UNIT EST BID BID BID BID Pole Fourndstion T S -3 oa. 1 $760.50 $760.50 $800.00 $800.00 Pole Foundation T D -4 ea. 1 $625.50 $825.50 $800.00 $800.00 Con Vol Founoation Base Mount �. 1 $448.50 $448.50 $475.00 $475.00 Install Trafr Su rt E (25'), GAL ask. 1 $494.00 $494.00 $65000 $650.00 Install Tre0 Su port B (25'&251, GA ea. 1 $624.00 $624.00 $650.00 $650.00 Install E ui Base Mt 6a. 1 $169.00 $169.00 $75.00 $75.00 Control fCabi Cabinet Wiring W. 1 $364.00 $364,00 $150.00 $150.00 Install Si nal Hd 5- Com lele ea. 1 $158.00 $&50.00 $156.00 $125.00 $125.00 Install Sl nel Hd 3- Complete �. B $117,00 ea. $702.00 $125.00 750.00 Install St U ht 25050, HPS Cobre ee. 2 $91.00 $182.00 $75.00 $150.00 Service Wire #12 -2C Lf. 410 $0.85 $348.50 $1.00 $410.00 Service Wlre #8 -2C I.f. 100 $7.05 $105.00 $1.00 $100.00 SI oal Cable $700.00 UG 50 I.f. 380 $1.00 $380.00 $1.00 $380.00 SI nal Cable I.i. Up C Lf. 65 $1.G5 $68.25 $1.25 $81.25 Si nel Cable UG 12C 1.f. 385 $1,70 $6.54.50 $1.50 $577.50 -1 Cable UG 20C Lt. 200 $2.35 $470.00 $2.00 $400.00 Conduct, As halt T PVC LL 395 $T8.25 $7,208.75 $21.00 $8,295.00 Conduit, Earth 3" PVC I.f. 520 $13.25 $6,890.00 $12.00 $6,240.00 Conduit, Earth 2" PVC) I.f. 110 $9.75 $1,072.50 $10.00 $1,100.00 Conduct, rth 1" PVC I.f. 45 $7.80 $351.00 $8.50 .50 unction Box, 1 ea. 11 $325.00 $3.573.00 $225.00 $2.475.00 Install DetAm w /HQrness 4C,Local ea. 1 $65.00 $65.00 $150.00 $150.00 Loo Wlre I.f. 450 $3.70 $1665.00 $3.75 $1667.50 Feeder Wire . I.f. 1085 $1,00 $11085.00 $0.95 $1030.75 Furn &Install 18 "Street Name Sin W. 3 $715.00 $2,145.00 $525.00 $1,575.00 Furn & Install Mast Mounted Si RIO -12 ea. 1 $143.00 $143.00 $110.00 $110.00 Service Riaer �. / $162.50 $162.50 $225.00 $225.00 Conduct 2" GAL ea. 21 $72.50 $250.00 $7.50 $150.00 Concrete Island Pavin 4" Thickness s.f. 414 TS.50 $2,277.00 $6.00 $2 484.00 533,641.50 $32,388.50 TRAFFIC SIGNAL INSTALLATION Royce Park Road and 36th Street CMM CMM LEG LEG OTY PRICE TOTAL PRICE TOTAL ITEM DESCRIPTION UNIT EST BID BID BID BID Pole FoundationT S -2 ee. 2 $811.00 $1,222.00 $750.00 $1500.00 Pole undationT KPO S -3 as. 1 $760.50 $760.50 $800.00 $800.00 Pole Foundation IYDe D -4 as. 1 $62&.-50 $825.50 $800.00 $800.00 Control Foundation fuse Mount W. 1 $448.50 $448.50 $475.00 $475.00 InstellTmtf Su rt E 20' GA sa. 1 $450.00 $450.00 $650.00 $850.00 installTmB SUPPort aPe E 25' GAL se. 1 $450.00 $450.00 $050.00 $850.00 Install TreB SURpOn QyI32 E 35 GAL W. 1 $450.00 $450.00 $650.00 $850.00 Install Tia SU rt E 45 L 81 . 1 $450.00 $450.00 $&50.00 $050.00 Install ControlE ui BeseM saw 1 $169.00 $169.00 $75.00 $75.00 Control Cabina[6Yd ea. 1 $364.00 $384.00 $150.00 $150.00 Install SI nal Hd 3 -Sect Complete ea. 8 $117.00 $936.00 $125.00 $1,000.00 Install St anal Hd a Com late M. 8 $60.00 $480.00 $125.00 $1000.00 Install St U ht 25O W, HPS, COBRA se. 41 $91.00 $364.00 $75.00 $700.00 Service Wire #12 -2C Lf. 335 $0.85 $284,75 $1.00 $335.00 Service Wire #8 -2C I.i. 135 $1.05 $141.75 $1.00 $135.00 SI nal Cable UG 5C I.f. 655 $1.00 $655.00 $1.25 $818.75 SI ICabie UG 12C I.f. 295 $1.70 $501.50 $1.50 $442.50 SI ml Cable UG 20C Lf. 630 $2.35 $1,480.50 $2.00 $1 0.00 Conduct, As V 3" PVC I.f. 820 $18.25 $11,315.00 $21.00 $13,020.00 onduit, Earth T PVC I.f. 645 $13.25 $8,546.25 $12.00 $7,740.00 Conduct, rth 2' PVC I.f. 235 $9.75 $2,291.25 $10.00 $2350.00 Conduit, Earth 0" PVC) I.f. 150 $7.80 $1,170.00 $6.50 $975.00 JuncOOn Box. E7 ea. 15 $325.00 $4,875.00 $225.00 $3,375.00 InSmII Det Am w /Hamel* 4C, Local M. 3 $65.00 $195.00 $150.00 $450.00 Loop Wire Lt. 1056 $3.70 $3,907.20 $3.75 $3,960.00 Feeder Wire I.f. 1770 $1.00 $1,770.00 $0.95 $1681.50 Fum & Install 18" Street Name Si ea. 4 $715.00 $2,860.00 $525.00 $210000 Service Riser tz 1 1 $188.00 $188.00 $225.00 $225.00 Conduit 2' GAL ea. 20 $12.50 $250.00 $7.50 $150.00 Insta0 Flanduisp Access W. 10 $800.00 $8000.00 &350.00 $3500.00 ' r §55,800.70 §51217.75 GRANDTOTAL 89 . 0 606.25 CERTIFIED CORRECT: Grego . SI ons • PURCHASING FACT SHEET 382 BID NO: 94317 DATE ADVERTISED: 7/12 & 7/19/94 DATE OPENED: 8/3/94 BID LIST: 78382 NUMBER SOLICITED: 15 DEPARTMENT: Public Works - Traffic DESCRIPTION: Traffic Signal Installation (Boyle Park & Napa Valley) FUNDING: Project ACCOUNT NUMBER: 210- 220 - 0143 -7050 APPROPRIATION OR TRANSFER REQUIRED: None ACCOUNT AVAILABILITY: $120,000 AMOUNT OF PURCHASE: $83,606.25 SUGGESTED AWARDEE: L.E.G. Enterprise Cabot, AR RECOMMENDATION AND DISCUSSION: It is recommnded that this contract be awarded to the low bidder, L.E.G. Enterprises. BID #: 94317 • DEPARTMENT: Public Works - Traffic 383 DESCRIPTION: Traffic Signal Installation (Boyle Park & Napa Valley) TABULATION L.E.G. Enterprises ($83,606.25) Avrard C M & M 89,442.20