90801 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 • RESOLUTION NO. 9,080 0 A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT BIDS AND AWARD A CONTRACT TO CONSTRUCT A NEW BOX CULVERT ON VICTORY STREET BETWEEN THIRD AND FOURTH STREETS. 34 WHEREAS, the existing rubble masonry box culvert under the east curb lane in the 300 block of Victory Street collapsed on August 27, 1993, rendering a safety hazard; and WHEREAS, the City has submitted competitive bids to provide a contract to repair this drainage structure; and WHEREAS, the low bidder in this competitive bidding process has been recommended to receive this award. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS: SECTION 1. The City Manager is authorized to enter into a contract with Harold Davis Construction Co., of Little Rock, Arkansas, for $122,000 ($106,116 bid amount plus 15% contingency) to construct a new box culvert on Victory Street between Third and Fourth Streets. SECTION 2. Funds are available in Special Project Account #210- 220 -0141. ADOPTED: January 18, 1994 • DID • • /. 1 R -(o7 15- Dec -93 o E!'d�Ii�EE{t 91 ! CITY OF LITTLE ROCK DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION s No.7�38 +a! �_21i3�Q3 �i� BID TABULATION OF: BidM93334 JOB: Victory Street Storm Drainage 45 Days to Complete Project: $500 Penalty Bradshaw - Clark Corp. NAMES O F VENDORS» ENGINEER'S ESTIMATE Harold Davie Const. Co. Gene Summers Const. Joynet Ford Burke Lambert Const. Co. Township Builders, Inc. C onst. Contractors P.O. Box 1207 10780 Bainbridge P.O. Box 475 P.O. Box 46391 P.O. Box 7252 (4520 W. 30th) Q Little Rock, Ark. 72203 Little Rock, Ark. 72212 Alexander, Ark. 72002 Little Rock, Ark. 72214 Little Rock, Ark. 72217 P.O. Box 4531 • U Little Rock. Ark. 72214 A UNIT UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM N OF PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE No. T MEA DESCRIPTION 14 _ 49.0 L.F. 24 ", RCP CI.III 42.00 2.058.00: 40.47 1,983.03, : 34.00 1.666.00: 37.52 1.838.48 ; 43.00 2,107.00 36.00 1.764.00 62.00 3.038.00 15 _ t00N, L. S. Connect to Exist.24 "Clay Pipe: 750.00 750.00: 532.50 532.50 : 470.00 470.00: 600.00 600.00: 1000.00 1.000.00 750.00 750.00 : 500.00 500.00 16 3.0 Ea. Curb Inlet (See Detail;% 2000.00 6.000.00 ; 1704.00 5.112.00 : 1100.00 3.300.00: 1450.00 4.350.00 : 2400.00 7,200.00 1500.00 4,500.00 : 1500.00 4.500.00 �. 17 _ 3.0 Ea. Junction Box (See Derail) 3500.00 10.500.00 1704.00 5,112.00 2970.00 8,910.00: 4600.00 13.800.00 2200.00 6,600.00 1400.00 4,200.00 4300.00 12,900.00 18 100 %L. S. Trench(Excava. Salety System: 6000.00 6,D00.00 1065.00 1.065.00 2500.00 2.500.00: 10000.00 10,000.00 4000.00 4,000.00 4000.00 4,000.00 10000.00 10.000.00 19 > 10004 L. S. Traffic Maintenance 5000.00 5,000.00 2662.50 2.662.50 3400.00 3,400.00: 5500.00 5.500.00 4500.00 4.500.00: 2000.00 2,000.00 5000.00 5,000.00 20 1.0 Ea. ValvelMtr. Box Adj. to Grade : 125.00 : 125.00: 319.50 319.50 70.00 70.00: 100.00 100.00: 100.00 100.00: 200.00 200.00 100.00 100.00 21 - 100 %L.S. Rem.& Rol. Landscaping; 750.00 750.00 319.50 319.50 340.00 340.00: 150.00 150.00 3000.00 3.000.00 500.00 500.00 200.00 200.00 ' 401 Victory 22 1.0 L.S. Final Cleanup 5000.00 5.000.00 1065.00 1.065.00 700.00 700.00 2000.00 2.000.00 1013.11 1,013.11 600.00 600.00 500.00 500.00 > : 0.00: 0.00 0.00 0.00 ; 0.00 0.00 0.00 _ _____ ___ __________________ ______ __ __________ _______ ---------- -------- ---------- -------- ---------- ______ __________ -------- __________ ________ __________ TOTAL BASE BID $115,975.50: $106,116.83 $119.770.90 $141.084.74 5144,592.31 $144,740.00 5155,475.00 ---- - - - - -- LOW BID ENGINEER'S EST. Cz CTi r a�i 15- Dec -93 CITY OF LITTLE ROCK DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION BID TABULATION OF: Bid# 93334 JOB: Victory Street S'orm Drainage 45 Days to Cam late Pro'ect' $500 Penalty 444/0' A It hANSA S AF�I// RI:6fSTifftI CNEE .7038 1� : 4 > 650.0 C.Y. P 1 5 230.0 C.Y. Borrow 6 315.0 - �A' y���/8fadshaw - Clark Corp. Rpl. Concrete Curb 6 Gutter 7 NAMES Of V E N D O R S>> ENGINEER'S ESTIMATE Harold Davis Const, Co. Gene Summers Comet. Joyner Ford Burke Lambert Comet. Co. Township Builders, Inc. Conet.Contractors S. F. Concrete. Sidewalk. 4" 10 60.0 Ton HMAC Surface Course Type 3: P.O. Box 1207 10780 Bainbridge P.O. Box 475 P.O. Box 46391 P.O. Box 7252 14520 W. 30th1 Ton O 2,300.00 Including Prime Coat Little Rock, Ark. 72203 Little Rock, Ark. 72212 Alexander, Ark. 72002 Little Rock, Ark. 72214 Little Rock. Ark. 72217 P.O. Box 4531 S.V. U 4.140.00 8.00 2.520.00: 9.59 3,020,85 Little Rock, Ark. 72214 7.28 A UNIT 14.00 UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM N OF 10.00 PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE No. T MEA DESCRIPTION --------- ___ ______ _________ ______ _ __ _________ ------ -_ --------- --- ----- --------- _________ __------ --------- --- ----- --------- --------- I > 1004b L. S. Site Preparation :5,000.00 5.000.00 :4,313.25 4,313,25: 14,879.00 14,879.00: 8.500.00 8,500.00 :7,500.00 7.500.00 : 16.401.00 16.401.00 : 6.200.00 6.200.00 2 0 360.0 L.F. 5'x 5' Reinforced Precast Box: 140.00 50,400.00 169.57 61,045.20: 155.72 56,059.20: 171.93 61,894.80 163.00 58.680.00 207.00 74,520.00 170.00 61.200.00 400.00 1,600.00 Culvert 600.00 2,400.00 400.00 1.600.00 3 > 18.0 L.F. 5'x 4' Reinforced Precast Box 125.00 2.250.00 163.95 2,951,10 177.00 3,186.00 165.97 2.987.46 170.00 3.060.00 200.00 3,600.00 240.00 4,320.00 400.00 2.40 Culvert 480.00 4.00 800.00 2.00 4 > 650.0 C.Y. Unclassified Excavation 5 230.0 C.Y. Borrow 6 315.0 L.F. Rpl. Concrete Curb 6 Gutter 7 210.0 S. F. 4" Conc. Private D/W B 4.0 Ea. Handicapped Access Ramps 9 ; 200.0 S. F. Concrete. Sidewalk. 4" 10 60.0 Ton HMAC Surface Course Type 3: 7.46 1,715.80 Including Tack Coat 11 > 30.0 Ton HMAC Base Course Type 2: 2,300.00 Including Prime Coat 12 > 200.0 Ton Crushed Stone Base, CI.7 13 10.0 S.V. Solid Sodding 4.140.00 15.00 9.750.00. 7.46 4,849.00 18.67 12,135.50: 20.00 13,000.00 47.03 30.569.50 : 20.00 13,000.00 46.00 29,900.00 9.50 2.185.00 7.46 1,715.80 6.90 2.047.00 10.00 2,300.00 12.01 2.762.30 13.00 2,990.00 18.00 4.140.00 8.00 2.520.00: 9.59 3,020,85 7.28 2,293.20: 14.00 4,410.00 9.16 2,885.40 11.00 3.465.00: 10.00 3.150.00 3.25 682.50 : 2.66 558,60 2.70 567.00 2.40 504.00 3.50 735.00 5.00 1.050.00 2.50 525.00 400.00 1.600.00: 479.25 1,917,00 217.00 868.00: 225.00 900.00 400.00 1,600.00 600.00 2,400.00 400.00 1.600.00 2.50 500.00 : 2.66 532.00 2.40 480.00: 2.00 400.00 2.40 480.00 4.00 800.00 2.00 400.00 30.00 1.800.00 4473 2,683.80 43.00 2,580.00: 40.00 2,400.00 45.00 2,700.00 50.00 3,000.00 46.00 2.760.00 29.50 885.00 : 44.73 1.341,90 43.00 1,290.00: 40.00 1.200.00 50.00 1.500.00: 50.00 1,500.00 46.00 1,380.00 10.75 2.150.00 : 14.82 2.964.00 9.80 1,960.00: 20.00 4,000.00 12.00 2.400.00 17.00 3,400.00 : 15.31 3,062.00 7.00 70.00 5.33 53,30 7.00 70.00 25.00 250.00 20.00 200.00 10.00 100.00 10.00 100.00