88501 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 RESOLUTION NO. 8,850 M w w M w A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT BIDS AND AWARD A CONTRACT TO HEAVRIN CONSTRUCTION COMPANY FOR CONSTRUCTION OF DRAINAGE IMPROVEMENTS. 19. WHEREAS, several homes along Jackson Street north of Cantrell Road have been flooded several times each year for many years, due to an inadequate storm sewer system; and WHEREAS, the proposed construction will reduce the potential of flooding to the homes on Jackson, reduce flooding at Beechwood and Club Road, and improve the drainage system along Club Road. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS: SECTION 1: The City Manager is authorized to accept bids and award a contract to Heavrin Construction Company in an amount not to exceed $273,552 for construction of drainage improvements in the vicinity of Jackson Street and Club Road. SECTION 2: Funds for this project are available in Account No. 210 - 220 -0196. ADOPTED: January 5, 1993 W-4 Milt APPROVED TO ,•.i ATTORNEY CITY APPROVED: JIMLbAILEY MAYOR • r 20 BID ITEM CURB INLET CITY. UNIT 3 EA JUNCTION BOXES 13 EA ICON. CURB & GUTTER 200 LF 42" DIA RCP 521 LF 48" DIA RCP 1632 LF REMOVE AND REPLACE ASPHALT 2" ACHM 1850 S.Y. AGGREGATE CLASS VII 3300 TONS REMOVE & REPLACE CON. PAVING 6 INC. 960 S.Y. CON. RETAINING WALL 15 C.Y. CON. HEADWALL 7 C.Y. PLUG EXIST 15" PIPE 1 EA TIE IN EXIST PIPE 6 EA TRAFFIC MAINT. 100% L.S. FINAL CLEANUP 100%I L.S. Certified Correct Doug Ford E. JACK K LANGSTON EXC. JOYNER FORD & BURKE NIT PRICE TOTAL UNIT PRICE TOTAL $1,760.00 $5,250.00 $1,700.00 $5,100.00 $1,600.00 $20,800.00 $1,700.00 $22,100.00 $9.00 $1,800.00 $10.00 $21000.00 $78.00 $40,638.00 $78.75 $41,028.75 $88.00 $143,616.00 $78.81 $128,617.92 $5.00 $9,250.00 $10.25 $18,962.50 $10.25 $33,825.00 $8.75 $28,875.001 $ 30.00 $28,500.00 $35.00 $33,260.00 $300.00 $4,500.00 $276.00 $4,126.00 $600.00 $3,600.00 $275.00 $1,925.00 $300.00 $300.00 $100.00 $100.00 $500.00 $3,000.00 $150.00 $900.00 $3,000.00 $3,000.00 $4,600.00 $4,600.00 $2,000.00 $2,000.00 $3,000.00 $3,000.00 TOTAL $299,979.00 ITOTAL $294,484.17 .. —A. '. r " i dt LILI- � -�' -''•li j, s i dt i BID ITEM QTY. i UNIT I L.R. MOURNING 1 (GENE SUMMERS UNIT PRICE TOTAL UNIT PRICE TOTAL CURB INLET 3 EA $1.613.18 1 $4.839.54 . $1,420.00 $4,260.00 JUNCTION BOXES 13 EA 1,580.61 j $20,547.93 1 I $1,340.00 $17,420.00 1 ICON. CURB & GUTTER 1 200 , LF $9.14 $1- 828 I $9.00 $1,800.00 42" DIA RCP 521 LF $109.25 $56,919.25 $133.70 $69,657.70 48" DIA RCP 1632 LF $119.69 $195,334.08 $124.00 $202,368.00 REMOVE AND REPLACE ASPHALT 2" ACHM 1850 S.Y. $21.54 $39,849.00 $5.60 $10,360.00 AGGREGATE CLASS VII 3300 TONS $8.11 $26,763.00 $8.90 $29,370.00 REMOVE & REPLACE CON. PAVING 61NC. 950 S.Y. $30.75 $29,212.50 $17.87 -- $16,976.60 CON. RETAINING WALL I 15 C.Y. $315.37 $4,730.55 $340.00 $5,100.00 CON. HEADWALL 7 C.Y. $806.15 $6,643.061 $770.00 $5,390.00 PLUG EXIST 15" PIPE 1 EA $1,125.75 $1,125.75 $100.00 $100.00 TIE IN EXIST PIPE 6 EA $533.25 $3,199.50 $90.00 $540.00 TRAFFIC MAINT. 100% L.S. 1 $1,500.00 $1,500.00 $12,138.00 $12,138.00 FINAL CLEANUP 100% L.S. $1,884.85 $1,884.85 $2,500.00 $2,500.00 TOTAL $393,377.00 TOTAL $377,980.20 Certified Correct — Doug For .E. 21 _ 22. BID ITEM QTY. UNIT JAMES A. ROGERS BB & B CONST. - - -� UNIT PRICE TOTAL UNIT PRICE TOTAL CURB INLET 3 EA $11366.00 $4,098.00 $1,800.00 $5,400.00 JUNCTION BOXES 13 EA $1,161.00 $15,093.00 $1,500.00 $19,500.00 CON. CURB & GUTTER 200 LF $8.50 $1,700.00 $15.00 $2,550.00 42" DIA RCP 621 LF $97.00 $50,637.00 $166.00 $86,486.00 48" DIA RCP 1632 LF $127.00 $207,264.00 $166.00 $270.912.00 REMOVE AND REPLACE ASPHALT 2" ACHM 1850 S.Y. $9.00 $16,650.00 $15.00 $27,750.00 AGGREGATE CLASS VII 3300 TONS $12.00 $39,600.00 $12.00 $39,600.00 REMOVE & REPLACE CON. PAVING 6 INC. 960 S.Y. $30.00 $28,600.00 $80.00 $76.000.00 CON. RETAINING WALL 15 C.Y. $347.00 $5,205.00 $300.00 $4,500.00 CON. HEADWALL 7 C.Y. $440.00 $3,080.00 $375.00 $2,625.00 PLUG EXIST 15" PIPE 1 EA $100.00 $100.00 $200.00 $200.00 TIE IN EXIST PIPE 6 EA $200.00 $1,200.00 $750.00 $4,500.00 TRAFFIC MAINT. 100% L.S. $20,000.00 $20,000.00 $18,200.00 $18,200.00 FINAL CLEANUP 100% L.S. $3,000.00 $3,000.00 $14,350.00 $14,350.00 TOTAL $396,027.00 TOTAL $572,573.00 Certified Correct Doug For . LOT! 517 TO& to �1 -Is loin A 3.11 :r,.{ F.` "ir:; ,r .�c�it •_'1 >w., c ?C'0; -_ :V'/ 1L' :�- Vol l 23 BID ITEM QTY. UNIT TOWNSHIP BUILDERS TANKERSLEY CONST. UNIT PRICE TOTAL UNIT PRICE TOTAL CURB INLET 3 EA 1 $2,700.00 $8,100.00 $1,550.00 $4,650.00 JUNCTION BOXES 13 EA $2,900.00 $37,700.00 $1,450.00 $18,850.00 CON. CURB & GUTTER 200 LF $10,00 $2,000.00 $8.50 $1,700.00 42" DIA RCP 521 LF $95,00 $49,495.00 $104.99 $54,699.79 48" DIA RCP 1632 LF $105,00 $171,360.00 $111.49 $181,951.68 REMOVE AND REPLACE ASPHALT 2" ACHM 1850 S.Y. $12,00 $22,200.00 $12.95 $23,957.50 AGGREGATE CLASS VII 3300 TONS $13.00 $42,900.00 $7.41 $24,453.00 REMOVE & REPLACE CON. PAVING 61NC. 950 S.Y. $32.00 $30,400.00 $28.25 $26,837.50 CON. RETAINING WALL 15 C.Y. $400.00 $6,000.00 $225.00 $3,376.00 CON. HEADWALL 7 C.Y. $400.00 $2,800.00 $250.00 $1,750.00 PLUG EXIST 15" PIPE 1 EA $500.00 $500.00 $70.00 $70.00 TIE IN EXIST PIPE 6 EA $400.00 $2,400.00 $250.00 $1,500.00 TRAFFIC MAINT. 100% L.S. $8,642.00 $8,642.00 $1,100.00 $1,100.00 FINAL CLEANUP 100% L.S. $10,000.00 $10,000000 $1,000.00 $1,000.00 TOTAL $394,497.00 TOTAL $345,894.47 Certified Correct Doug Ford, E. BID ITEM QTY. 1 I UNIT (WEAVER- BAILEY UNIT PRICE TOTAL ENGINEERS ESTIMATE - UNIT PRICE TOTAL CURB INLET 3 EA $1,500.00 $4.500.00 $1,800.00 $2,400.00 JUNCTION BOXES 13 EA $1,250.00 $16,250,00 $1,200.00 $15,600.00 CON. CURB & GUTTER 200 LF $12.00 $2,400,00 $10.00 $2,000.00 42" DIA RCP 521 LF $107.00 $55,747.00 $75.00 $39,075.00 48" DIA RCP 1632 LF $117.00 $190,944.00 $80.00 $130,560.00 REMOVE AND REPLACE ASPHALT 2" ACHM 1850 S.Y. $35.00 $64,750.00 $5.50 $10,175.00 AGGREGATE CLASS VII 3300 TONSI $10.00 $33,000.00 $10.00 $33,000.00 REMOVE & REPLACE CON. PAVING 6 INC. 950 S.Y. $30.00 $28,500.00 $27.00 $25,650.00 CON. RETAINING WALL 15 C.Y. $350.00 $5,250,00 $425.00 $6,375.00 CON. HEADWALL 7 C.Y. $400.00 $2,800.00 $425.00 $2,975.00 PLUG EXIST 15" PIPE 1 EA $300.00 $300.00 $300.00 $300.00 TIE IN EXIST PIPE 6 EA $700.00 $4,200.00 $500.00 $3,000.00 TRAFFIC MAINT. 100% L.S. $30,000.00 $30,000,00 $5,000.00 $5,000.00 FINAL CLEANUP 100% L.S. 1 $10,000.00 $10,000.00 $6,500.00 $6,500.00 Certified Correct TOTAL $448,641,00 Doug Ford, Pt $282,610.00 BID ITEM CURB INLET I QTY. UNIT 3 EA JUNCTION BOXES 13 EA CON. CURB & GUTTER 200 LF 42" DIA RCP 521 LF 48" DIA RCP 1632 LF REMOVE AND REPLACE ASPHALT 2" ACHM 1850 S.Y. AGGREGATE CLASS VII 3300 TONS REMOVE & REPLACE CON. PAVING 6 INC, 950 S.Y. CON. RETAINING WALL 15 C.Y. CON. HEADWALL 7 C.Y. PLUG EXIST 15" PIPE 1 EA TIE IN EXIST PIPE 6 EA TRAFFIC MAINT. 100% L.S. FINAL CLEANUP 100%j L.S. Certified Correct Doug Ford, P.E. LAMBERT CONST. HEAVRIN CONST. UNIT PRICE TOTAL UNIT PRICE TOTAL $1,500.00 $4,500.00 $2,100.00 $6,300.00 $1,700.00 $22,100.00 $1,800.00 $23,400.00 $10.00 $1,700.00 $10.00 $2;000.00 $71.00 $36,991.00 $69.00 $35,949.00 $82.00 $135,300.00 $79.00 $128.928.00 $8.50 $15,725.00 $5.00 $9,250.00 $8.00 $46,800.00 $10.00 $33,000.00 $35.00 $33,250.00 $20.00 I $19,000.00 $210.00 $3,160.00 $225.00 $3,375.00 $350.00 $2,450.00 $300.00 $2,100.00 $150.00 $150.00 $260.00 $250.00 $425.00 $2,550.00 $500.00 I $3,000.00 $13,000.00 $13,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 TOTAL $319,660.00 ITOTAL $273,552.00 25