8806.M
592
RESOLUTION NO. 8.806
1
2 A RESOLUTION AUTHORIZING THE CITY MANAGER
3 TO ALLOCATE $30,800 of 1988 CAPITAL
4 DEPROVII4ENT BOND FUNDS TO THE HINSON ROAD
5 IMPROVEMENTS PROJECTS: AND AUTHORIZING
6 THE CITY MANAGER TO EXTEND THE CURRENT
7 CONTRACT WITH JOYNER, FORD, AND BURKE
8 CONSTRUCTION COMPANY TO CONSTRUCT A
9 CONCRETE RETAINING WALL.
10
11 WHEREAS, Little Rock, Ark., Ordinance Numbers 15,473 and
12 15,499 appropriated $19,675,000 for street and drainage
13 improvements; and
14 WHEREAS, Little Rock, Ark., Resolution Number 8,647
15 (February 4, 1992) approved a contract with Joyner, Ford, and
16 Burke Construction Company for the widening and reconstruction of
17 Hinson Road, Martha to Rodney Parham; and
18 WHEREAS, several yards are being flooded on the north side
19 of Hinson Road between Napa Valley and Greenbriar due to water
20 flowing north down Napa Valley and across Hinson; and
21 WHEREAS, the volume and velocity of this flow causes it to
22 exceed the curb height and flood the yards; and
23 WHEREAS, the proposed retaining wall will prevent the
24 flooding by directing the overflow into the existing storm sewer
25 system; and
26 NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF
27 THE CITY OF LITTLE ROCK, ARKANSAS:
28 SECTION 1. The City Manager is hereby authorized to
29 allocate $30,800 from the 1988 Capital Improvement Bond Fund to
30 the Hinson Road improvement project, Account No. 301 - 220 -0057.
31 SECTION 2. The City Manager is authorized to extend the
32 current contract with Joyner, Ford, and Burke Construction company
33 in an amount not to exceed $30,800 to construct a concrete
34 retaining wall on Hinson Road between Napa Valley and Greenbriar.
35
36
k'-s8
C -11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
0
ADOPTED: October 20, 1992
ATTEST:
APPROVED:
�� �! A,.
i• \• • } •i
MAYOR
593
CITY OF LITTLE ROCK
PUBLIC WORKS ENGINEERING
CHANGE ORDER
PROJECT: Hinson Road Improvements
DESCRIPTION OF CHANGE:
Reinforce Concrete Retaining Wall
Sta. 21+70 to Sta. 26 +00
REASON FOR CHANGE:
Drainage improvements
CHANGE ORDER NO. 3
594
ITEM
NO.
ITEM
UNIT
UNIT
PRICE
PRESENT
REVISED
CITY.
AMT.
CITY.
AMT.
I
Site Preparation
L.S.
$74,000.00
1.0
$74,000.00
1
$80,800.00
39
.
18" Pi a
L.F.
$20.00
1200.0
$24,000.00
>. 1400
$28,000.00
49
Concrete Retaining Wall
C.Y.
$250.00
192.5
$48,125.00
272.5
$68,125.00
$0.00
"'.:
$0.00
$0.00
? „s
$0.00
$0.00':
$0.00
$0.00
':'
$0.00
$0.00
$0.00
$0.00
.s.':
$0.00
$0.00
TOTALS:
146 125.00
ss 176 925.00
RECOMMEND
CITY ENGINEER
RECOMMENDED
PUBLIC WORKS DIRECTOR
AUTHORIZ % .19
X
C MANAGER
OVERRUN
REVISED CONTRACT
AMOUNT
$30,800.00
$725,022.21
ACCEPTED ,19
CONTRACTOR
BY
RECOMMENDED (P-20P 19 le-
PROJECT M N ER