Loading...
8707m W m m m lob RESOLUTION NO. $'707 A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT BIDS AND AWARD A CONTRACT TO CONSTRUCT A TRAFFIC SIGNAL AT THE INTERSECTION OF NAPA VALLEY ROAD AND HINSON ROAD. ,.308` NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS: SECTION 1: The City Manager is hereby authorized to accept bids and award.a contract to Township Builders, Inc. in an amount not to exceed $38,477.00 to construct a traffic signal at the intersection of Napa Valley Road and Hinson Road. SECTION 2: Funding for this project is available in Account Number 210 - 220 -0143. ADOPTED: May 19, 1992 ATTEST: 1 1 ! Wn ! 7 4 CLERK APPROVED AS TO FORM: MA J /ir� 1R EN _ Nil CITY ATTORNEY \• RO1 a• MAYOR 1-'64 F-- 13 mm m BID TABULATION NAPA VALLEY AND HINSON ROAD CM & M, INC. ITEM DESCRIPTION UNIT AUANTITY UNIT COST TOTAL m m 309 LEG, INC. TOWNSHIP BUILDER'S INC. UNIT COST TOTAL UNIT COST TOTAL 1 POLE FOUNDATION TYPE S-i EA. 1 $380.00 4360.00 $550.00 $550.00 $500.00 $500.00 2 POLE FOUNDATION TYPE S-2 EA. 1 $420.00 $420.00 $600.00 $600.00 $500,00 1500.00 3 POLE FOUNDATION TYPE S -3 EA, 2 $515.00 $1,030.00 $650.00 $1,300.00 $600.00 $1,200,00 4 F/I TRAFFIC SUPPORT (0 -A, GALV.) EA. 1 $884.00 $984,00 $650.00 $650,00 $800.00 $800.00 5 F/I TRAFFIC SUPPORT (4 -C, GALV.) EA. 1 $2,080.00 $2,080.00 $2,000.00 $2,000,00 $1,800.00 $1,800.00 6 F/1 TRAFFIC SUPPORT (3 -C, GALV.) EA. 1 $2,177.00 $2,177.00 $2,100.00 $2,100.00 $2,000.00 $2,000.00 7 F/I TRAFFIC SUPPORT (5 -C, GALV.) EA, 1 $3.321.00 $3,321.00 $2,800.00 $2,800.00 $2,200.00 $2,200,00 8 CONTROLLER FOUNDATION (BASE MOUNT) EA. 1 $231.00 $231.00 $350.00 $350.00 $300.00 $300.00 9 CONTROL CABINET WIRING EA. 1 $468.00 $468.00 $375.00 $375.00 $200.00 $200,00 10 SIGNAL HEAD (5- SECT.)COMP /BACKPLATE EA. 1 $620.00 $620.00 $575.00 $575.00 $900.00 $300,00 11 SIGNAL HEAD (3- SECT,)COMP /BACKPLATE EA. 6 $425.00 $2,550.00 $435.00 $2,610.00 $400.00 $2,400.00 12 SIGNAL HERD (PED.) COMPLETE EA. 6 $300.00 $1,800.00 $310.00 $1,860.00 $300.00 $1,800.00 13 F/I PEDESTRIAN PUSH BUTTONS EA. 6 $100.00 $600.00 $75.00 $450,00 $50.00 $300.00 14 F/1 STREETLIGHT (25OW, HPS, COBRA) EA. 2 $300.00 $600, QO $350.00 $700.00 $400.00 $800.00 i5 STREETLIGHT FEEDER (#12 -2C) L.F. 408 $1.00 $408.00 $0.80 $326.40 $1.00 $408.00 16 SERVICE WIRE (q8 -2C) L.F. 135 $1.00 $135.00 $1.25 $168.75 $2.00 $270.00 17 SIGNAL CABLE (5C) L.F. 230 $1.00 $230.00 $1.00 $230.00 $1.00 $230.00 18 SIGNAL CABLE (7C) L.F, 63 $1.25 $78.75 $1.25 $78.75 $1.00 $63.00 19 SIGNAL CABLE (20C) L.F. 316 $2.50 $790.00 $2.25 $711.00 $2.00 $632,00 20 CONDUIT - CONCRETE (3' PVC) L.F. 75 $14.50 $1,087.50 $18.00 $1,350.00 $25.00 $1,875.00 21 CONDUIT - ASPHALT (3' PVC) L.F. 316 $18,50 $5,846.00 $18.00 $5,688.00 $20.00 $6,320.00 22 CONDUIT - EARTH (3' PVC) L.F. 788 $9.00 $7,092.00 $10.50 $8,274.00 $5.50 $4,334.00 23 JUNCTION BOX, E2 EA. 13 $125.00 $1,625.00 $175.00 $2,275.00 $200.00 $2,600.00 24 SERVICE RISER (2') EA. 1 $100.00 $100.00 $175.00 $175.00 $285.00 $285.00 25 CONDUIT (2' GALV.) L.F. 20 $6.00 $120.00 $5.00 $100.00 $5.00 $100.00 26 INST. DET. AMP /HARNESS (4C, LOCAL) EA. 1 $200.00 $200.00 $475.00 $475.00 $200.00 $200.00 27 INST. DET. AMP /HARNESS (1C, LOCAL) EA, 1 $140.00 $140.00 $175.00 $175.00 $200.00 $200,00 2B LOOP SAW CUT- ASPHALT L.F. 650 $3.25 $2,112.50 $3.00 $1,950.00 $6.00 $3,900.00 29 LOOP LEAD -1N UNDERGROUND L.F. 1200 $1.00 $1,200.00 $0.95 51,140.00 $0.40 $480.00 30 F/I 18' SNS EA. 3 $450.00 $1,350.00 $450.00 $1,350.00 $220.00 $660.00 31 F/I RIO -12 SIGNS EA. 1 $110.00 $110.00 $150.00 $150,00 $220.00 $220.00 3, 785.75 $41,536.90 $30,477.00 �' s{I E -lq