Loading...
Z-8751 Map 14l\ PST PSpN 'a \ 6 �o bi 11 Nil r1 i �I ri ,?e3 APPROX. OUTLINE OF AREA ` DISTURBED DURING CONSTRUCTION ' �2 `-= EXISTING DRAINAGE PATTERN NO GRADING ` HERE (TYP) _260 I��. /r I 0 LF- J% ; -259_-- - REMOVE EXISTING ASPHALT IN I �� 25B THIS AREA AND REGRADE SILT FENCE ---- DROP INLET PARKING LOT --TO ELEVATIONS '----- - SHOWN - ---- - -- SILT FENCE DROP INLET w SILT FENCE I - I .ter � YR zi- -- ► ♦ _ ,�'� CT o P 29 n 12 N h 4. 2;e J Zg1 789 2 C / L.F. . P C.F 3 260 _ DROP INLET SILT FENCE V\ 9 / - - RCF - 8 RCP - - -- I GEOTEXTILE FABRIC (TYPE 4) IN ACCORDANCE WITH SECTION 625 (AHTD SPECS) 6' MAX. +_-I_- T GROUN% COMPACTED EARTH BACKFILL 0II1I■WD11090 2" X 4" NOMINAL 2" X 4" NOMINAL WOOD POST WOOD FRAME 3' MAX. SPACING \ / EMBED 12" MIN. SECTION C - C DROP INLET SILT FENCE GEOTEXTILE FABRIC APPROX. 8" BURIED IN TRENCH GEOTEXTILE FABRIC (TYF TRENCH APPROX. 4" DEEP X 4" WIDE FILL TRENCH TO ANCHOR BOTTOM OF CLOTH. COMPACT THROUGHLY. 2" X 4" NOMINAL WOOD FRAME GEOTEXTILE FABRIC r -,nil SEQUENCE OF CONSTRUCTION 1. SAW CUT EXISTING ASPHALT IN AREAS OF NEW CONSTRUCTION & NEW PARKING LOT ISLANDS. BEGIN BUILDING RENOVATION. 2. INSTALL STORM DRAIN LINES AND OTHER UTILITY LINES. BACK FILL LINES WITH CLASS 7 GRAVEL IN PAVED AREAS. INSTALL DROP INLET SILT FENCES. 3. BEGIN GRADING OPERATION. INSTALL CURB AND GUTTER. 4. MAINTAIN ANY DIVERSIONS TO ROUTE ALL WATER TO DROP INLET LOCATIONS. 5. COMPLETE BUILDING RENOVATION. 6. FINE GRADE ENTIRE SITE, AND COMPLETE PAVING OPERATIONS. 7. INSTALL SOD, VEGETATION, AND PROCEED WITH FINAL SITE STABILIZATION. WATER ALL GRASSED AREAS. 8. INSPECT AND RESOD ALL DISTURBED AREAS AS NECESSARY. UPON FINAL SITE STABILIZATION, CLEAN SILT FROM BEHIND ALL SEDIMENT FENCES AND DITCH CHECKS, AND REMOVE ALL TEMPORARY EROSION CONTROL DEVICES. EROSION CONTROL NOTES: 1. SEDIMENT CONTROL MEASURES MUST BE INSPECTED AND MAINTAINED REGULARLY IN ORDER TO INSURE THAT THE INTENDED PURPOSES ARE ACCOMPLISHED. 2. ALL DISTURBED AREAS NOT INTENDED FOR PAVING SHALL BE SODDED OR SEEDED AS PER LANDSCAPE PLAN. 3. STABILIZATION REQUIREMENTS: (NOT NECESSARILY VEGETATION) ALL PERIMETER CONTROLS ARE TO BE STABILIZED WITHIN 7 DAYS OF INSTALLATION. ALL OTHER DISTURBED AREAS ARE TO BE STABILIZED WITHIN 14 DAYS. 4. TEMPORARY SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED UNTIL ALL CONTRIBUTING AREAS ARE GRADED AND STABILIZED. 5. EXCAVATED EARTH SHALL BE PILED ON THE HIGH SIDE OF EXCAVATIONS. 6. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. 7. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND -DISTURBING ACTIVITIES. 8. APPLY WATER TO AREAS OF EXPOSED SOIL ON THE SITE AS NEEDED TO CONTROL DUST AND AIRBORNE POLLUTANTS. TOTAL SOIL DISTURBANCE ACREAGE= 2.4 AC.t TOTAL PROJECT ACREAGE= 9.6 AC.f LEGEND -�� SHOWS SILT FENCE �56.6 \ z�z3 - SHOWS DROP INLET SILT FENCE _ - III���ppp rn 257.0 m - , Q / 257 \ i / T N � N � .:.� / MATCH EXISTING � .c PARK NG LOT GRADE vvwvv a . SHOWS AREA FOR TEMPORARY STORAGE 27.91 = -,95 - - 26i7 _ ` WITH ELEVATION OF \\\ vv� vv \ \ 257.77 \ ������ OF EXCESS EXCAVATED MATERIAL / CURB GUTTER00 V Z �58.19 258 36 2 CONSTRUCT DROP INLET CONSTRUCT DROP _E \ \ \ II000 'N T E•I° '•. \STA. 10+41 CONSTRUCT DROP INLET STA 7+90 STA 7+36 _ \ �111 ARKAN AS REMOVE EXIS71NO GRATE STA 9+14 RIM 257.00 RIM 257.00 - `y \ \ �� v� V CONSTRUCT DROP INLET RIM 257.00 INVERT IN 253.40 INVERT IN 253.19 z: �I •� LICENS,,.ED ` RETAIN EXISTING PIPE V>=S- INVERT IN 254.0 INVERT OUT 253.30 INVERT OUT 252.19 \ t'•P 7 TOP 256.9 ; RL - __ - INVERT OUT �i��-1�1 �� 0 OQ ` CONSTRUCT GRATE INLET i G PROFESSIONAL �g ENGINEER F L 254.25 -i E C = -- / i • r t P - RETAIN EXISTING =-- - STA 3+54 _ ' - \ PFF S v �•• \ TOP 257.0 rn, \ , RIM 255.35 - - i j /� T _: o�NNo. 4685l P 11�1 \ ` INVERT IN 251.32 FL 255.48 i W 1 I r Q3 INVERT OUT 251.22 DE R. ;011 y MOSAIC CHURCH FFE m 2W.46 CONSTRUCT DROP INLET 0 BACKFILL ALL STORM DRAINAGE \ �� ,oOFIIAU��'•. STA 5+47 208 ` �a�! AND UTILITY TRENCHES WITH V \ A .•'.�lG I,S,'•. RIM 257.3 GRAVEL (CLASS 7) IN PAVED \ \ \ \\\ UP 09 INVERT IN 251.81 AREAS. \ \ • ;►? s, INVERT OUT 251.71 _ \ \ \ = LL E �NQ D \ _ f DROP INLET - \ \ \ -i. SILT FENCE _ o \ \ 1k 1 257.60 �� }� .kmmw 354 L.F. �2r� �� .� ,�i 1�4�q,,-,�.Y�_,�y�`� •� / Ts 36"RCP ••,��4.'48EN�"`;•�`•,•• MATCH / PARKIN,_ -_E l' WITH El= CURB G_---�7.09: I Ikid- \-- CONCRETE WASHOUT AREA �i I ao o zo - y� 112 yao.C9 : \ EXISTING DRAINAGE ��� xl I", �� ATTACHMENT A - PATTERN NO GRADING - - - \ � \ GRAPHIC SCALE ( IN FEET ) 1 inch = 40 ft. IL -- HERE (IP) i -------- EROSION CONTROL PLAN THOMAS MOSAIC CHURCH ENGINEERING S. UNIVERSITY AVE. COMPANY LITTLE Rock, AR. �v // - - APPROVED DRAWN BY DATE SHEET N0. _ - - - - 3810 LOOKOUT ROAD, N. LITTLE ROCK, AR. 72116 JAN. 14, 2014 C5 4 TEL: 501-753-4463 FAX: 501-753-6814 SCALE 1" = 40'