Z-8632 Staff Analysis4I=1111iā¢101WA :ne m
NAME: Arkansas Urology Clinic Short -form POD
LOCATION: Located on the West side of Centerview Drive just South of Kanis Road
DEVELOPER:
Arkansas Urology
c/o Kincaid Development
2100 Riverdale Road, Suite 100
Little Rock, AR 72202
ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 4.0 acres
CURRENT ZONING
ALLOWED USES:
PROPOSED ZONING:
NUMBER OF LOTS: 2
R-2, Single-family
Single-family residential
WE
FT. NEW STREET: 0 LF
PROPOSED USE: Parking lot to serve an adjacent business
VARIANCESIWAIVERS REQUESTED: A variance from the Subdivision Ordinance to
allow the creation of a lot without public street frontage.
A. PROPOSALIREQUEST/APPLICANT'S STATEMENT:
The applicant is proposing the subdivision of an existing four plus acre parcel into
two lots and the rezoning of one of the lots to POD. The southern lot is proposed
for the rezoning to POD to allow the immediate construction of a parking lot to
serve Arkansas Urology Clinic which is located adjacent to the site. There are no
changes proposed for the remaining area which will remain zoned R-2, Single-
family.
FILE NO.: Z-8632 (Cont.
EXISTING CONDITIONS:
The area proposed for rezoning is wooded with access extending via an access
easement from Kanis Road to the northern portion of this site. There are three
structures located on the overall parcel of property, an office fronting Kanis Road
and two other non-residential buildings accessed via an access easement
extending from Kanis Road. The areas to the east and south are developed with
office uses including Arkansas Urology Clinic, the Federal Bureau of
Investigations and the Arkansas Realtors Association. A property to the west is
zoned POD and is being redeveloped as a daycare center. Also to the west is a
property zoned POD which is developed as an office warehouse containing four
buildings.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from the
area property owners. All property owners located within 200 feet of the site, all
residents, who could be identified, located within 300 feet of the site and the John
Barrow Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other than
residential subdivisions, site grading and drainage plans must be submitted
and approved prior to the start of construction. Is the applicant requesting
advanced grading?
2. Stormwater detention ordinance applies to this property.
3. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
4. Damage to public and private property due to hauling operations or operation
of construction related equipment from a nearby construction site shall be
repaired by the responsible party prior to issuance of a certificate of
occupancy.
5. Provide the proposed access to the proposed building, not possible access
locations.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this project.
2
FILE NO.: Z-8632 (Cont.
Entergy: Easements are required around the sites perimeter. Contact Engergy
for additional information.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: A water main extension will be required to provide
water service to this property. All Central Arkansas Water requirements in effect
at the time of request for water service must be met. Due to the nature of this
facility, installation of an approved reduced pressure zone backflow preventer
assembly (RPS) is required on the domestic water service. This assembly must
be installed prior to the first point of use. Central Arkansas Water (CAW)
requires that upon installation of the PRZ assembly, successful tests of the
assembly must be completed by a Certified Assembly Tester licensed by the
State of Arkansas and approved by CAW. The test results must be sent to
CAW's Cross Connection Section within ten days of installation and annually
thereafter. Contact the Cross Connection Section at 377-1226 if you would like
to discuss backflow prevention requirements for this project. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public
and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are
required, they will be installed at the developer's expense. Please submit plans
for water facilities to Central Arkansas Water for review. Plan revisions may be
required after additional review. Contact Central Arkansas Water regarding
procedures for installation of water facilities. Approval of plans by Central
Arkansas Water, the Department of Health Engineering Division and the Little
Rock Fire Department is required. Contact Central Arkansas Water regarding
the size and location of the water meter. A Capital Investment Change based on
the size of meter connection(s) will apply to this project in addition to normal
charges. This fee will apply to all connections including metered connections off
the private fire system. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection. The facilities on -site will be private.
When meters are planned off private lines, private facilities shall be installed to
Central Arkansas Water's material and construction specifications and
installation will be inspected by an engineer, licensed to practice in the State of
Arkansas. Execution of Customer Owned Line Agreement is required.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department concerning how the southern building will be served by fire
protection.
County Planning: No comment.
CATA: The site is located near CATA Bus Route #3 ā the Baptist Medical Center
Route.
Parks and Recreation: No comment.
3
FILE NO.: Z-8632 (Cont.
F
ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the 1-430 Planning District. The
Land Use Plan shows Office for this property. Office use requires developments
with an office use and character. The applicant has applied for a Planned Office
District, to allow for a new parking lot and an office/warehouse structure.
Master Street Plan: The applications does not have frontage on a public street or
private street.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
2. The landscape ordinance requires a minimum of eight percent (8%) of the
paved areas be landscaped with interior islands of at least 7 1/2 feet in width
and 150 square feet in area. The interior islands must be evenly distributed
throughout the site.
3. The zoning buffer ordinance requires the placement of a minimum land use
buffer along the northern perimeter of the site of nine feet (9').
4. The Landscape Ordinance requires the placement of a nine (9) foot
landscape strip around the site's entirety.
5. The property to the north is zoned residential; therefore, a six (6) foot high
opaque screen, either a wooden fence with its face side directed outward, a
wall, or dense evergreen plantings, is required along this perimeter.
6. Building landscaping will be required with the proposed development.
G. SUBDIVISION COMMITTEE COMMENT: (February 17, 2011)
Mr. Joe White and Mr. John Kincade were present representing the request.
Staff presented an overview of the development stating there were a number of
technical issues in need of addressing prior to the Commission acting on the
request. Staff stated the area of the entire existing parcel would be reviewed as
a subdivision.
The site plan as proposed included an office warehouse building on Tract B with
potential access from an adjacent property and through the parking lot proposed
to serve Arkansas Urology. There was a general discussion concerning the
building proposed for Tract B. Staff stated the primary concern was related to
access. Staff stated the site plan could not indicate possible access but should
include the access to serve the lot. Mr. White stated they would remove the
4
FILE NO.: Z-8632 (Cont.
building from the site plan and resubmit if and when a development opportunity
occurred. He stated at that time the access issues would be resolved.
Public Works comments were addressed. Staff stated a grading permit would be
required prior to development. Staff also stated the stormwater detention
ordinance would apply to the development of the lots.
Landscaping comments were addressed. Staff stated screening would be
required along the northern perimeter. Staff also stated the parking lot would
require landscaping to comply with the City's Landscape ordinance.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing the issues raised
at the February 17, 2011, Subdivision Committee meeting. The revised plan
includes two (2) lots. The office/warehouse building has been removed. The
northern lot, Lot 1, has frontage on Kanis Road. Lot 2 is proposed for rezoning to
POD. This lot is being created as a lot without public street frontage. There are
no redevelopment plans for Lot 1. Lot 2 will be developed with a 132 space
parking lot to serve an adjacent office use, Arkansas Urology Clinic.
The approval will require a variance from the City's Subdivision Ordinance to
allow the creation of Lot 2 as a lot without public street frontage. The lot will be
served via an access easement extending from Kanis Road to the northern
boundary of this property and a driveway connection from the proposed parking
lot to the existing Arkansas Urology Clinic parking lot will be provided.
The site plan indicates the new parking area will be landscaped per the City's
Landscape Ordinance requirements. In addition a screening fence will be
located along the northern perimeter to screen the use from the adjacent
residentially zoned property.
Staff is supportive of the request. To staff's knowledge there are no remaining
outstanding technical issues associated with the request. Staff does not feel the
rezoning of this parcel to POD to allow the construction of the new parking area
or the subdivision of this existing parcel into two (2) lots and allowing the creation
of one of the lots as a lot without public street frontage will significantly impact the
area.
:7
FILE NO.: Z-8632 (Cont)
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION: (MARCH 10, 2011)
Mr. Joe White of White Daters and Associates was present representing the request.
There were no registered objectors present. Staff presented the item with a
recommendation of approval of the request subject to compliance with the comments
and conditions as outlined in paragraphs D, E and F of the agenda staff report.
There was no further discussion of the item. The chair entertained a motion for
approval of the item as presented by staff. The motion carried by a vote of 11 ayes,
0 noes and 0 absent.
9
March 10, 2011
ITEM NO.: 12
FILE NO.: Z-8632
NAME: Arkansas Urology Clinic Short -form POD
LOCATION: Located on the West side of Centerview Drive just South of Kanis Road
DEVELOPER:
Arkansas Urology
c/o Kincaid Development
2100 Riverdale Road, Suite 100
Little Rock, AR 72202
ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 4.0 acres
CURRENT ZONING
ALLOWED USES
PROPOSED ZONING:
NUMBER OF LOTS: 2
R-2, Single-family
Single-family residential
FT. NEW STREET: 0 LF
PROPOSED USE: Parking lot to serve an adjacent business
VARIANCES/WAIVERS REQUESTED: A variance from the Subdivision Ordinance to
allow the creation of a lot without public street frontage.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT.
The applicant is proposing the subdivision of an existing four plus acre parcel into
two lots and the rezoning of one of the lots to POD. The southern lot is proposed
for the rezoning to POD to allow the immediate construction of a parking lot to
serve Arkansas Urology Clinic which is located adjacent to the site. There are no
changes proposed for the remaining area which will remain zoned R-2, Single-
family.
March 10, 2011
SUBDIVISION
NO.: 12 (Cont.
B. EXISTING CONDITIONS:
FILE NO.: Z-8632
The area proposed for rezoning is wooded with access extending via an access
easement from Kanis Road to the northern portion of this site. There are three
structures located on the overall parcel of property, an office fronting Kanis Road
and two other non-residential buildings accessed via an access easement
extending from Kanis Road. The areas to the east and south are developed with
office uses including Arkansas Urology Clinic, the Federal Bureau of
Investigations and the Arkansas Realtors Association. A property to the west is
zoned POD and is being redeveloped as a daycare center. Also to the west is a
property zoned POD which is developed as an office warehouse containing four
buildings.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from the
area property owners. All property owners located within 200 feet of the site, all
residents, who could be identified, located within 300 feet of the site and the John
Barrow Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other than
residential subdivisions, site grading and drainage plans must be submitted
and approved prior to the start of construction. Is the applicant requesting
advanced grading?
2. Stormwater detention ordinance applies to this property.
3. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
4. Damage to public and private property due to hauling operations or operation
of construction related equipment from a nearby construction site shall be
repaired by the responsible party prior to issuance of a certificate of
occupancy.
5. Provide the proposed access to the proposed building, not possible access
locations.
2
March 10, 2011
SUBDIVISION
M NO.: 12 (Cont.) FILE NO.: Z-8632
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this project.
Entergy: Easements are required around the sites perimeter. Contact Engergy
for additional information.
Center -Point Enerav: No comment received.
AT & T: No comment received.
Central Arkansas Water: A water main extension will be required to provide
water service to this property. All Central Arkansas Water requirements in effect
at the time of request for water service must be met. Due to the nature of this
facility, installation of an approved reduced pressure zone backflow preventer
assembly (RPS) is required on the domestic water service. This assembly must
be installed prior to the first point of use. Central Arkansas Water (CAW)
requires that upon installation of the PRZ assembly, successful tests of the
assembly must be completed by a Certified Assembly Tester licensed by the
State of Arkansas and approved by CAW. The test results must be sent to
CAW's Cross Connection Section within ten days of installation and annually
thereafter. Contact the Cross Connection Section at 377-1226 if you would like
to discuss backflow prevention requirements for this project. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public
and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are
required, they will be installed at the developer's expense. Please submit plans
for water facilities to Central Arkansas Water for review. Plan revisions may be
required after additional review. Contact Central Arkansas Water regarding
procedures for installation of water facilities. Approval of plans by Central
Arkansas Water, the Department of Health Engineering Division and the Little
Rock Fire Department is required. Contact Central Arkansas Water regarding
the size and location of the water meter. A Capital Investment Change based on
the size of meter connection(s) will apply to this project in addition to normal
charges. This fee will apply to all connections including metered connections off
the private fire system. This development will have minor impact on the existing
water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection. The facilities on -site will be private.
When meters are planned off private lines, private facilities shall be installed to
Central Arkansas Water's material and construction specifications and
installation will be inspected by an engineer, licensed to practice in the State of
Arkansas. Execution of Customer Owned Line Agreement is required.
3
March 10, 2011
SUBDIVISION
ITEM NO.: 12 Cont. FILE NO.: Z-8632
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department concerning how the southern building will be served by fire
protection.
County Planning: No comment.
CATA: The site is located near CATA Bus Route #3 ā the Baptist Medical Center
Route.
Parks and Recreation: No comment.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: This request is located in the 1-430 Planning District. The
Land Use Plan shows Office for this property. Office use requires developments
with an office use and character. The applicant has applied for a Planned Office
District, to allow for a new parking lot and an office/warehouse structure.
Master Street Plan: The applications does not have frontage on a public street or
private street.
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
2. The landscape ordinance requires a minimum of eight percent (8%) of the
paved areas be landscaped with interior islands of at least 7 '/2 feet in width
and 150 square feet in area. The interior islands must be evenly distributed
throughout the site.
3. The zoning buffer ordinance requires the placement of a minimum land use
buffer along the northern perimeter of the site of nine feet (9').
4. The Landscape Ordinance requires the placement of a nine (9) foot
landscape strip around the site's entirety.
5. The property to the north is zoned residential; therefore, a six (6) foot high
opaque screen, either a wooden fence with its face side directed outward, a
wall, or dense evergreen plantings, is required along this perimeter.
6. Building landscaping will be required with the proposed development.
12
March 10, 2011
SUBDIVISION
ITEM NO.: 12(Cont.)FILE NO.: 2-8632
G. SUBDIVISION COMMITTEE COMMENT: (February 17, 2011)
Mr. Joe White and Mr. John Kincade were present representing the request.
Staff presented an overview of the development stating there were a number of
technical issues in need of addressing prior to the Commission acting on the
request. Staff stated the area of the entire existing parcel would be reviewed as
a subdivision.
The site plan as proposed included an office warehouse building on Tract B with
potential access from an adjacent property and through the parking lot proposed
to serve Arkansas Urology. There was a general discussion concerning the
building proposed for Tract B. Staff stated the primary concern was related to
access. Staff stated the site plan could not indicate possible access but should
include the access to serve the lot. Mr. White stated they would remove the
building from the site plan and resubmit if and when a development opportunity
occurred. He stated at that time the access issues would be resolved.
Public Works comments were addressed. Staff stated a grading permit would be
required prior to development. Staff also stated the stormwater detention
ordinance would apply to the development of the lots.
Landscaping comments were addressed. Staff stated screening would be
required along the northern perimeter. Staff also stated the parking lot would
require landscaping to comply with the City's Landscape ordinance.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing the issues raised
at the February 17, 2011, Subdivision Committee meeting. The revised plan
includes two (2) lots. The office/warehouse building has been removed. The
northern lot, Lot 1, has frontage on Kanis Road. Lot 2 is proposed for rezoning to
POD. This lot is being created as a lot without public street frontage. There are
no redevelopment plans for Lot 1. Lot 2 will be developed with a 132 space
parking lot to serve an adjacent office use, Arkansas Urology Clinic.
The approval will require a variance from the City's Subdivision Ordinance to
allow the creation of Lot 2 as a lot without public street frontage. The lot will be
served via an access easement extending from Kanis Road to the northern
5
March 10, 2011
SUBDIVISION
ITEM NO.: 12 (Cont.) FILE NO.: Z-8632
boundary of this property and a driveway connection from the proposed parking
lot to the existing Arkansas Urology Clinic parking lot will be provided.
The site plan indicates the new parking area will be landscaped per the City's
Landscape Ordinance requirements. In addition a screening fence will be
located along the northern perimeter to screen the use from the adjacent
residentially zoned property.
Staff is supportive of the request. To staff's knowledge there are no remaining
outstanding technical issues associated with the request. Staff does not feel the
rezoning of this parcel to POD to allow the construction of the new parking area
or the subdivision of this existing parcel into two (2) lots and allowing the creation
of one of the lots as a lot without public street frontage will significantly impact the
area.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
PLANNING COMMISSION ACTION: (MARCH 10, 2011)
Mr. Joe White of White Daters and Associates was present representing the request.
There were no registered objectors present. Staff presented the item with a
recommendation of approval of the request subject to compliance with the comments
and conditions as outlined in paragraphs D, E and F of the agenda staff report.
There was no further discussion of the item. The chair entertained a motion for
approval of the item as presented by staff. The motion carried by a vote of 11 ayes,
0 noes and 0 absent.
L
ITEM NO.: 12. Z-8632
NAME: Arkansas Urology Clinic Short -form POD
LOCATION: located on the West side of Centerview Drive just South of Kanis Road
Planning Staff Comments:
1. Provide notification of property owners located within 200-feet of the site, complete
with the certified abstract list, notice form with affidavit executed and proof of
mailing. The notice must be mailed no later than February 23, 2011. The Office of
Planning and Development must receive the proof of notice no later than March 4,
2011.
2. Provide the proposed uses for the building indicated on Tract B.
3. Staff has concerns with access for providing services to the proposed building
located on Tract B. Fire/Emergency Vehicles must weave through the parking lot to
access the building.
4. Provide on the site plan the area in which these two lots are being created from.
The subdivision ordinance requires if the parent parcel or any resulting parcels are
less than five acres then the entire area is to be review through the subdivision
process.
5. Provide details of any proposed signage including building signage for the parking
area and the proposed building.
6. The site plan does not indicate a dumpster for the proposed building. Provide the
location on the proposed site plan.
Variance/Waivers: A variance from the Subdivision Ordinance to allow the creation of
two lots without public street frontage.
Public Works Conditions:
1. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved prior
to the start of construction. Is the applicant requesting advanced grading?
2. Stormwater detention ordinance applies to this property.
3. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from
the Arkansas Department of Environmental Quality prior to the start of construction.
4. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by
the responsible party prior to issuance of a certificate of occupancy.
5. Provide the proposed access to the proposed building, not possible access
locations.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to this project.
Item # 12.
Entergy: Approved as submitted.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: A water main extension will be required to provide water
service to this property. All Central Arkansas Water requirements in effect at the time of
request for water service must be met. Due to the nature of this facility, installation of
an approved reduced pressure zone backflow preventer assembly (RPS) is required on
the domestic water service. This assembly must be installed prior to the first point of
use. Central Arkansas Water (CAW) requires that upon installation of the PRZ
assembly, successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by CAW. The test results must
be sent to CAW's Cross Connection Section within ten days of installation and annually
thereafter. Contact the Cross Connection Section at 377-1226 if you would like to
discuss backflow prevention requirements for this project. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public and/or
private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will
be installed at the developer's expense. Please submit plans for water facilities to
Central Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation of water
facilities. Approval of plans by Central Arkansas Water, the Department of Health
Engineering Division and the Little Rock Fire Department is required. Contact Central
Arkansas Water regarding the size and location of the water meter. A Capital
Investment Change based on the size of meter connection(s) will apply to this project in
addition to normal charges. This fee will apply to all connections including metered
connections off the private fire system. This development will have minor impact on the
existing water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection. The facilities on -site will be private. When
meters are planned off private lines, private facilities shall be installed to Central
Arkansas Water's material and construction specifications and installation will be
inspected by an engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line Agreement is required.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department concerning how the southern building will be served by fire protection.
County Planning: No comment.
CATA: The site is located near CATA Bus Route #3 ā the Baptist Medical Center
Route.
Parks and Recreation: No comment.
Planning Division: This request is located in the 1-430 Planning District. The Land Use
Plan shows Office for this property. Office use requires developments with an office use
Item # 12.
and character. The applicant has applied for a Planned Office District, to allow for a
new parking lot and an office/warehouse structure.
Master Street Plan
private street.
The applications does not have frontage on a public street or
Bicycle Plan: There are no bike routes shown in the immediate vicinity.
Landscape:
1. The site plan must comply with the City's landscape and buffer ordinance
requirements.
2. The landscape ordinance requires a minimum of eight percent (8%) of the paved
areas be landscaped with interior islands of at least 7'/z feet in width and 150 square
feet in area. The interior islands must be evenly distributed throughout the site.
3. The zoning buffer ordinance requires the placement of a minimum land use buffer
along the northern perimeter of the site of nine feet (9').
4. The Landscape Ordinance requires the placement of a nine (9) foot landscape strip
around the site's entirety.
5. The property to the north is zoned residential; therefore, a six (6) foot high opaque
screen, either a wooden fence with its face side directed outward, a wall, or dense
evergreen plantings, is required along this perimeter.
6. Building landscaping will be required with the proposed development.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, February 23, 2011.
Item # 12.