Loading...
Z-5675-A Staff AnalysisFebruary 8, 2001 ITEM NO.: 6 FILE NO.: Z -5675-A Nom: Philander Smith College - Conditional Use Permit LOCATION: 712 West 13th Street, bounded by Daisy Bates Avenue on the south, 11th Street on the north, Gaines Street on the east and Chester Street on the west. OWNER/APPLICANT: Philander Smith College / Fred Perkins, Architect PROPOSAL: To obtain a conditional use permit to expand the facilities, buildings and parking, at Philander Smith College through a phased master plan on the existing campus which is zoned primarily R-4, Two Family Residential, some C-3 General Commercial zoning, and Capital Zoning for the southeast corner. ORDINANCE DESIGN STANDARDS: 1. SITE LOCATION: The existing 26.8 acre campus is located on the north side of Daisy Bates Avenue (previously 14th Street), and bounded by 11th Street on the north, Gaines Street on the east and Chester Street on the west. 2. COMPATIBILITY WITH NEIGHBORHOOD: The school has existed at this site since the early 1880's, and though it has expanded since then, as far as Staff is aware, it has been compatible with the neighborhood. The surrounding zoning is a mixture of residential, office, commercial, industrial, and Capitol zoning scattered all around the perimeter of this site. The majority of the abutting zoning is commercial and office except for 2/3=d of the east side which is bounded by the Mount Holly Cemetery in R-2 zoning. February 8, 2001 ITEM NO.: 6 (Cont.) FILE NO.: Z -5675-A Based on the surrounding zoning and past history of the school at this location, Staff believes this slow expansion would present little adverse impact on the surrounding neighborhood. The main streets of Chester and Daisy Bates are 4 -lane and should be able to handle the traffic. The existing Chester Street/I-630 interchange next door makes the site readily accessible without having to use much of Chester or Daisy Bates. The Downtown and East of Broadway Neighborhood Associations, all property owners within 200 feet, and all residents within 300 feet that could be identified, were notified of the public hearing. 3. ON SITE DRIVES AND PARKING: The school uses primarily what previously were public City streets as their on -campus drives. There are several existing access points into the campus, but only the one from Daisy Bates at Izard is open all the time and manned with a security guard. The other gates are opened as needed. The plan includes adding one more access "day" gate at Daisy Bates and State Street for only out -going traffic. The ordinance standard for parking on college campuses requires one parking space for each 300 square feet of gross floor area or one space for every four students, whichever is greater. The proposed enrollment change would be an increase,of 450 students, which would equate to 112 parking spaces. The proposed square footage would increase the total building square footage by 191,300 square feet, which would equate to 637 new parking spaces. The larger of the two figures would be from the square footage figure and so the ordinance required increase would be 637 spaces. That would bring the parking total ordinance requirement to 1027 parking spaces. The proposal is for 804 total spaces including the parking deck, and 75 of those spaces would be off site across Chester Street at the southwest corner of the campus. A variance would be required for reduced parking. 2 February 8, 2001 ITEM NO.: 6 (Cont.) FILE NO.: Z -5675-A 4. SCREENING AND BUFFERS: Areas set aside for buffers and landscaping meet with ordinance requirements. Newly landscaped areas will be required to be irrigated. Prior to a building permit being issued, it will be necessary to submit an approved landscape plan stamped with the seal of a Registered Landscape Architect. 5. PUBLIC WORKS COMMENTS: a. Property frontage needs to have the sidewalks and ramps brought up to the current ADA standards. b. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. c. Plans of all work in right-of-way shall be submitted for approval prior to start of work. d. Stormwater detention ordinance applies to this property. e. Improve alley and pave to 18 feet wide along new parking area. f. Driveways shall conform to Sec. 31-210 or Ordinance 18,031. 6. UTILITY, FIRE DEPT. AND CATA COMMENTS: Water: No objection. Contact the Water Works regarding the size and location of the water meter. Contact Carroll Keatts, Water Works Cross Connection Program Administrator at 371-1241 to discuss backflow prevention requirements for this project. Relocation of any public water mains will be at the developer's expense. Existing public water mains may be required to become private facilities. Existing public fire hydrants may be required to become private hydrants. The Little Rock Fire Department needs to evaluate this site to determine fire protection requirements. 3 February 8, 2001 ITEM NO.: 6 (Cont. Wastewater: Sewer lines should be on site. Contact details. FILE NO.: Z -5675-A available, capacity of existing checked prior to proposed expansion Little Rock Wastewater Utility for Southwestern Bell: No comments received. ARKLA: Easements required. Reliant Energy Arkla has a main located on south side of 12' Street between Gaines and State. West of State this main is located on north side 12th Street. Entergy: Approved as submitted. Fire Department: Approved as submitted. However, contact Dennis Free, 371-3752, at the fire department concerning fire hydrant placement. CATA: Site is not on a dedicated"bus route and has no effect on bus radius, turnout and route. 7. STAFF ANALYSIS: The applicant has requested a conditional use permit to approve a phased Master Plan for future improvements on the existing school campus including expanding the facilities, buildings and parking. Philander Smith College has existed at this site since the early 1880's, and though it has expanded since then, as far as Staff is aware, it has been compatible with the neighborhood. The site is zoned primarily R- 4, Two Family Residential, with the northeast and southwest corners zoned C-3, General Commercial. The surrounding zoning is a mixture of residential, office, commercial, industrial, and Capitol Zoning District scattered all around the perimeter of this site. The majority of the abutting zoning is commercial and office except for 2/3rd of the east side which is bounded by the Mount Holly Cemetery in R-2 zoning. 4 February 8, 2001 ITEM NO.: 6 (Cont.) FILE NO.: Z -5675-A The Phased Master Plan includes the following additions: Phase 1: Library with parking, southwest corner of existing campus. Phase 2: Science and Health Mission Center, midway along Chester, west side of campus, started within a year. Phase 3: Convert old gym in the center of the current campus into a student recreational facility, date unknown. Phase 4: Construct Elijah Pitts Memorial Plaza, midway along the south side of the campus, along Daisy Bates Avenue, date unknown. Phase 5 and beyond: Convert existing library into a fine arts facility, convert old science building into academic facilities and offices, construct additional student housing, new president's home and academic buildings as shown on the site plan. These changes would occur in 2003 and beyond. Most setbacks are met or exceeded except for the parking structure on the northeast corner. Part of the zoning there is C-3 which requires setbacks from all streets to be 25 feet, and the interior setback to be 15 feet. The proposal shows only a 15 foot setback from Gaines Street and 12 foot setback from the interior property line which separates the school from the Wesley Chapel United Methodist Church property. Those reduced setbacks would require a variance, but Staff would be comfortable with both reduced setbacks. The use across the street is the cemetery, and Gaines Street in this area serves as access to the frontage road along I-630. The interior setback exists because the Wesley Chapel United Methodist Church has maintained its property inside the school property. The church building is located on the opposite side of this abutting church property, and actually the church uses the existing parking lot for their parking area. They would continue to use this area when it is expanded into a 3 -level parking garage. Therefore, the slightly reduced setback, 12 versus 15 feet, should not have any adverse impact. 5 February 8, 2001 ITEM NO.: 6 (Cont.) FILE NO.: Z -5675-A The proposed building heights are another issue that will require variances. The proposed new buildings vary between 2 and 4 stories, between 40 and about 58 feet tall, so the applicant is asking for a height variance to allow a 60 foot height. The ordinance allows 35 feet in R-4 zoning. The proposed structures will blend with existing architecture which includes high sloped roofs. The high roofs add to the overall height. There are existing buildings on campus with similar heights. Staff does not see an adverse impact given the surrounding zoning and existing structures. The last area requiring discussion is parking. The parking requirement for a college is one space for each 300 square feet of gross floor area or one space for every four students, whichever is greater. As discussed earlier in section 3, the larger figure would be from the square footage figure and so the required increase would be 637 spaces. That would bring the parking total requirement to 1027 parking spaces. The proposal is for 804 total spaces -including the parking deck, and 75 of those spaces would be off site across the street at the southwest corner of the campus. A variance would be required for reducing the parking by 223 spaces. The proposed ground level parking would provide a ratio of 1 space for 2.33 student/staff/faculty. Adding the parking deck will reduce that ratio to one space for every 1.62 student/staff/faculty. The ordinance standard is based on a 1 for 1 ratio for students or on square footage, whichever is larger. However, Staff believes the proposed parking would be adequate for the use, and therefore, the variance would be reasonable. Overall Staff believes this proposed master plan provides for reasonable growth on the existing campus and should not cause much of an adverse impact on the surrounding area. The phased approach will spread out the changes and impact, if any, over several years. 11 February 8, 2001 ITEM NO.: 6 (Cont.) FILE NO.: Z -5675-A 8. STAFF RECOMMENDATION: Staff recommends approval of the conditional use permit subject to compliance with the following conditions: a. Comply with the City's Landscape and Buffer Ordinances. b. Comply with Public Works Comments. c. Comply with Fire Department Comment. d. All exterior lighting must be low intensity and directed downward and inward to the property and not towards any residential zoned area. e. Obtain approval from Capitol Zoning for the proposed expansion in the area lying within their zoning district. Staff also recommends approval of the variances for _,•. reduced setbacks to the east and west for the -parking deck on the southwest corner of Gaines and Ilth Street; increased height up to 60 feet for the new buildings; and reduced parking to 804 spaces when all the proposed additional parking is completed. SUBDIVISION COMMITTEE COMMENTS: (JANUARY 18, 2001) Fred Perkins, project architect, was present representing the application. Staff gave a brief description of the proposal and briefly reviewed the comments provided to the applicant. Mr. Perkins asked if the repair and upgrades noted in Public Works' comments could be done along with the new construction in each phase. Mr. Borkowski of Public Works said they could. Public Works also reiterated the need to improve the alley as the access to the parking lot on the southwest corner of Chester and Daisy Bates. Mr. Perkins agreed. The parking situation and requested variances were also briefly discussed. The Committee and Staff were comfortable with the requested variances. There being no further issues, the Committee accepted the proposal and forwarded the item to the full Commission for final action. 7 February 8, 2001 ITEM NO.: 6 (Cont. PLANNING COMMISSION ACTION: FILE NO.: Z -5675-A (FEBRUARY 8, 2001) Fred Perkins, project architect, was present representing the application. There were no registered objectors present. Staff presented the item with a recommendation for approval subject to compliance with the conditions listed under "Staff Recommendation," paragraph 8 above. The item was placed on the Consent Agenda and approved as submitted to include staff comments and recommendations, and variances for reduced setbacks to the east and west for the parking deck on the southwest corner of Gaines and 11th Street; increased height up to 60 feet for the new buildings; and reduced parking to 804 spaces when all the proposed additional parking is completed. The vote was 9 ayes, 0 nays and 2 absent. 8