Loading...
Z-5659-A Map 217 LANDSCAPE 20'2 \` 5'a 2a / FUTURE PARKING 'g PHASE N \ �a � �� NEW LOCATION OF MODULAR BUILDING TO BE RELOCATED DURING PfiASE III. TO BE USED { S STORAGE D. BU PHASE O R COMPLETED. BUILDING TO BE REMOVED DURING PHASE VI. IDSA PAPE i \ 10 m LAN�DSIXGIPE s 0 FUTURE PARKINGPHASE A \\ FUTURE PARKING LANAR�EA�E PHASE N \ \ 0*LAN\ _ AR�FA� \ \ 20 / 20 O 21 ANIONW4 LANDSCAPE 1 EXIST. HC SPACE ' T ADD 1 ADD. HC SPACE 6 EXISP II NEW CONCRETE DUMPRIVA W/ PHASE III CONSTR. I TiPARK I PFENCE/SCREEN PRIVACY I��"ddd I II _I 26 THESE 7 EXISTING SPACES TO BE g8 RELOCATED TO REAR OF FAMILY UFE f Yi LEGAL DESCRIPTION Part of the SW 1/4 NE 1/4 of Section 24, Township 2 North, Range 14 West of the 5th Principal Meridian in Pulaski County, Arkansas, more particularly described as follows: beginning at the Southeast corner of said SW 1/4 NE 1/4 ; thence North along the East line of said. SW 1/4 NE '/4 on a bearing of North 1 deg. 03 min. East a distance of 432.2 feet to the South side of Taylor Loop Road; thence along the South side of Taylor Loop Road North 56 deg. 13 min. West a distance of 101.5 feet; thence North 60 deg. 47 min. West a distance of 208.5 feet; thence North 67 deg. 37 min. West a distance of 139.5 feet; thence North 72 deg, 05 min. West a distance of 178.5 feet to the intersection of the East side of Carter Road with the South side of Taylor Loop Road; thence South 1 deg. 07 min. West a distance of 375 feet; thence South 89 deg. 49 min. East a distance of 301 feet; thence South 1 deg. 11 min. West a distance of 320 feet; thence South 89 deg. 28 min. East a distance of 270.2 feet to the Point of beginning, and containing 5.4 acres, more or less. THE PURPOSE FOR THIS REVISION TO THIS C.U.P. IS TO UPDATE THE PHASING PLAN TO REFLECT THE BUILDINGS ALREADY CONSTRUCTED AND TO BETTER REPRESENT THE SEQUENCE IN WHICH THE SITE IS ANTICIPATED TO BE DEVELOPED. AS A PART OF THIS REVISION, A DEFERRAL IS SOUGHT OF THE HALF—STREET IMPROVEMENT REQUIREMENT ALONG TAYLOR LOOP ROAD FOR A PERIOD OF 5 YEARS. THE RIGHT—OF—WAY FOR THESE IMPROVEMENTS WAS DEDICATED DURING A PREVIOUS PHASE OF THE PROJECT. THE STREET IMPROVEMENTS ALONG CARTER LANE WERE CONSTRUCTED DURING A PREVIOUS PHASE. �CY1pSNUHK 3O� �' / • *ODD8g• Ag, i / Ci EXIST. 6' OPAQUE PRIVACY FENCE IX. 30' PP W/ - � 2 SHIELDED11GHTS / / NEW SIDEWALK AND RAMPING TO BE CONSTRUCTED 1 EXIST. HC SPACE. DURING PHASE III TO PROVIDE HANDICAP ACCESS _ ADD 1 ADD. SPACE E/30' PPW/ FRON PARKING, FAMILY LIFE CENTER. AND-D&SMOOL/ W/ PHASE III CONSIR., , , �2 SH6:LDED LIGHTS OFFlCES TO THE SANCTUARY. RAMPING WILL BE REMOVED DURING PHASE N CONSTRUCTION W/ ACCESS DIRECTLY TO BUILDING. % IN NEW 5' SIDEWALK W/ HANDICAP RAMP LANDSCAPE PHASE I EXISTING SANCTUARY AND EDUCATION BUILDING 2 EXIST. HC SPADE. rvry rm ra.�c�se,.c rn. �rm.c rv'N REGULAR SPACE TO BRING TOTAL TO 10.--__-_ , PHA N EXISTING - APPROVED EXISTING EDUCATION SPACE 6,600 S.F. IX. 30' PP W/ /2 SHIELDED LIGHTS EXIST. PARKING (7 SPACES) ' PHASE II EXISTING NEW SIDEWALK W/ UNOPY TO BE CMM%IRUCIED MAXIMUM IX. FlREHYDRANT "NDSCAPE /650 S.F ADDITION (PH. III) '.. EXISTING a +,IEA ,..OFFICES i l /,///✓// Lo MAXIMUM HEIGHT = 22'-4" REMOVED TURING PHASE Y CONSTRUCTION W/ PROPOSED EDUCATION SPACE 3,460 S.F. REQUEST DEFERRAL OF STREET IMPROVEMENTS MAXIMUM ACCESS DIRECTLY TO BUILDING, L_ r PHASE II EXIST, 14 HEIGHT = 27'-4"' PHASE VI EXISTING FAMILY LIFE CENTER PHASE III (INTERIOR - J EXISTING DAYSCHOOL REMODEL A ADD OFFICES Z MAXIMUM /_, O % IN NEW 5' SIDEWALK W/ HANDICAP RAMP LANDSCAPE PHASE I EXISTING SANCTUARY AND EDUCATION BUILDING 2 EXIST. HC SPADE. PROJECT PHASING PHASE I EXISTING SANCTUARY 7,000 S.F. APPROVED EXISTING EDUCATION SPACE 6,600 S.F. IX. 30' PP W/ /2 SHIELDED LIGHTS EXIST. PARKING (7 SPACES) ' PHASE II EXISTING NEW SIDEWALK W/ UNOPY TO BE CMM%IRUCIED MAXIMUM IX. FlREHYDRANT "NDSCAPE DURING PHASE IX TO PROVIDE ALL-WEATHER ACCESS FROM FAMILY LIFE (ENTER, AND OAYSCHOOL/ EXISTING DAYSCHOOL - 4,550 S.F. +,IEA ,..OFFICES TO THE SANCTUARY. SIDEWALK TO BE-- Lo MAXIMUM HEIGHT = 22'-4" REMOVED TURING PHASE Y CONSTRUCTION W/ PROPOSED EDUCATION SPACE 3,460 S.F. REQUEST DEFERRAL OF STREET IMPROVEMENTS MAXIMUM ACCESS DIRECTLY TO BUILDING, L_ PROPOSED EDUCATION SPACE 3,900 S.F. =O UO EXIST, 14 HEIGHT = 27'-4"' PHASE VI PROPOSED SANCTUARY EXPANSION 3,000 S.F. ,M12 LAMENT LANDSC.APF i.� ISARU, (INTERIOR - J PROPOSED EDUCATION SPACE 10,500 S.F. Z MAXIMUM /_, O IX. FIRE HYDRAtT- >Q 0 � QLr) 5 Q 0 WO T U c0 LLJ J SIX. SEWER O 1= F H LLJ % IN NEW 5' SIDEWALK W/ HANDICAP RAMP LANDSCAPE PHASE I EXISTING SANCTUARY AND EDUCATION BUILDING 2 EXIST. HC SPADE. ':"k,"11 EXISTING PARKING = 143 SPACES EXISTING HC PARKING = 4 SPACES SANCTUARY CAPACITY = 380 PEOPLE SEATS PER PARKING SPACE = 2.7 HC PARKING ADDED IN PHASE III = 2 SPACES TOTAL PARKING AFTER PHASE III = 142 SPACES SEATS PER PARKING SPACE AFTER PHASE III = 2.7 PARKING TO BE ADDED ® PH. VI = 121 SPACES TOTAL PARKING SPACES AFTER PH. A = 263 SPACES TOTAL SANCTURAY CAPACITY AFTER PH. VI = 705 SEATS PER PARKING SPACE AFTER PH. VI = 2.7 PROJECT PHASING PHASE I EXISTING SANCTUARY 7,000 S.F. APPROVED EXISTING EDUCATION SPACE 6,600 S.F. NUMBER OF MAXIMUM HEIGHT = 42' PHASE II EXISTING FAMILY LIFE CENTER - 10,500 S.F. MAXIMUM HEIGHT = 28' PHASE III EXISTING DAYSCHOOL - 4,550 S.F. PROPOSED OFFICE ADDITION - 650 S.F. Lo MAXIMUM HEIGHT = 22'-4" PHASE IV PROPOSED EDUCATION SPACE 3,460 S.F. REQUEST DEFERRAL OF STREET IMPROVEMENTS MAXIMUM HEIGHT = 27'-4" PHASE V PROPOSED EDUCATION SPACE 3,900 S.F. =O UO MAXIMUM HEIGHT = 27'-4"' PHASE VI PROPOSED SANCTUARY EXPANSION 3,000 S.F. LLI (INTERIOR EXPANSION) J PROPOSED EDUCATION SPACE 10,500 S.F. Z MAXIMUM HEIGHT = 27'-4"' ':"k,"11 EXISTING PARKING = 143 SPACES EXISTING HC PARKING = 4 SPACES SANCTUARY CAPACITY = 380 PEOPLE SEATS PER PARKING SPACE = 2.7 HC PARKING ADDED IN PHASE III = 2 SPACES TOTAL PARKING AFTER PHASE III = 142 SPACES SEATS PER PARKING SPACE AFTER PHASE III = 2.7 PARKING TO BE ADDED ® PH. VI = 121 SPACES TOTAL PARKING SPACES AFTER PH. A = 263 SPACES TOTAL SANCTURAY CAPACITY AFTER PH. VI = 705 SEATS PER PARKING SPACE AFTER PH. VI = 2.7 j n IARDSCAPE �' V � LANDSCAPE AREA AREA 16 EXISTING STORMWATER DETENTION 1 AREA TO BE RE -WORKED AS PART OF PHASE III SO WEST HALF OF EXIST. PARKING (37 SPACES) SITE GETS TO POND, \ I \ /IX. ' W r 2 SHIE30LDEDPP GHTS 139 5 - - N72.05'W 178.5'- -- ; 30 15 C;FIV? MAY BY:__ 2 3 2007 LITTLE norK PLAv+a Na APPRi; TLD, SIpJEGT TO THF AS N07ED iN iidF FLPP 1 MINUTEECO D� J �` 7 6Y: m� SCALE TAYLOR LOOP ROAD g (60' R/W) 1r T1 ,1 INFORMATION HOURS OF OPERATION: CHURCH: ALL DAY SUN., WED. 'TIL 10PM H K FAMILY LIFE CENTER: SUN—SAT 7AM-12AM APPROVED DAY SCHOOL: M—F 7AM — 6PM MAXIMUM DAYSCHOOL ENROLLMENT: 50 CHILDREN NUMBER OF DAYSCHOOL EMPLOYEES: 11 OWNER: CHENAL VALLEY CHURCH OF CHRIST V 16025 TAYLOR LOOP ROAD LITTLE ROCK, AR 72223 Z 501-868-9808 ENGINEER: RICHBURG SERVICE GROUP, PLLC 2024 ARKANSAS VALLEY DR., SUITE 201 Lo LITTLE ROCK, AR 72212 w 501-227-4299 REQUESTS: REQUEST DEFERRAL OF STREET IMPROVEMENTS LO ALONG TAYLOR LOOP ROAD FOR A PERIOD OF JQ 5 YEARS. to t� W D j n IARDSCAPE �' V � LANDSCAPE AREA AREA 16 EXISTING STORMWATER DETENTION 1 AREA TO BE RE -WORKED AS PART OF PHASE III SO WEST HALF OF EXIST. PARKING (37 SPACES) SITE GETS TO POND, \ I \ /IX. ' W r 2 SHIE30LDEDPP GHTS 139 5 - - N72.05'W 178.5'- -- ; 30 15 C;FIV? MAY BY:__ 2 3 2007 LITTLE norK PLAv+a Na APPRi; TLD, SIpJEGT TO THF AS N07ED iN iidF FLPP 1 MINUTEECO D� J �` 7 6Y: m� SCALE TAYLOR LOOP ROAD g (60' R/W) 1r T1 ,1 1 ,f = 30' N N r-+ [� p BY : BSR H K Y: APPROVED BY: DAT : 4-27-07 a_ U V bA Z On LLJ Lo w LO LL� JQ N w =O UO O_ z >_ � LLI Wi2f p J J0 Z LI_ Q O 0 SCALE 1 ,f = 30' DRAWN BY : BSR H K Y: APPROVED BY: DAT : 4-27-07 PROJECT N0, 2007-002 z V Q a_ U W � Z On LLJ Lo w LO LL� JQ N =O UO O_ z >_ � LLI Wi2f p J J0 Z LI_ Q O >Q 0 � QLr) 5 Q 0 WO > 5 U c0 LLJ J O 1= F H LLJ H Ld K LLI N F DO DO 0 V) W O 0 a C Z O W U') PROJECT N0, 2007-002 z V Q a_ U W � On LLJ Lo LO LL� JQ N =O UO O_ z >_ � LLI Wi2f p J J0 Z LI_ Q O >Q U � QLr) 5 Q WO > 5 U c0 LLJ Fx O 1= F F LLJ H Ld K LLI N PROJECT N0, 2007-002