Loading...
Z-5659 Staff AnalysisT Marbh`9, 1993 ITEM NO.: 7 FILE NO • Z-5659 NAME: Chenal Valley Church - Conditional Use Permit LOCATION: 16025 Taylor Loop Road OR APPLICANT: Chenal Valley Church/Scott Evans, Agent PROPOSAL: The applicant requests a conditional use permit to allow for the phased expansion of an existing church on this R-2 zoned, 5.4 acre site. The proposal includes the phased construction of a new 800 seat sanctuary, education buildings and a multipurpose building. The applicant also requests continued use of the church's classroom space for a day-care center. RDI ARCS DESIGN STANDARDS: 1. Site Location The site is located on the south side of Taylor Loop Road at its intersection with Bella Rosa Drive. 2. Comp tihility with Neighborhood A church has existed at this site for many years. The current owners recently purchased this site and have made an effort to upgrade the property. The surrounding uses are exclusively single family residential. With attention given to buffering/screening the adjacent residential properties to the south and east, this proposed use should be compatible with the surrounding neighborhood. 3. On --Site Drives and Parking A sanctuary with a seating capacity of 800 requires 200 on-site parking spaces. The applicant is proposing a significant parking area with a final number of 282 parking spaces. The parking lot will be built in phases to coincide with the phased development of the project. An initial review of the site plan shows the potential loss of 27 parking spaces once the required buffer/landscaping is installed. Even with this loss of parking spaces, there will be more than adequate parking on the site. March 9, 1993 SUBDIVISION ITEM NO.: 7 Continued FILE NO.: Z-5659 4. Screening and Buffers Compliance with the City's landscape and buffer ordinances is required with attention given to screening the residential properties adjacent to the south and the east. The proposed sanctuary may have a tower or cross approximately 85 feet in height. The required buffers should contain trees which when mature, will grow to a height to soften the effect of this structure. 5. City Engineer Comments Right-of-way dedication and Master Street Plan improvements will be required on Taylor Loop Road and Carter Lane. Construct Taylor Loop improvements with Phase I and construct Carter Lane improvements with the Phase II parking lot development. Stormwater detention and excavation ordinances will apply. 6. Utility Comments Little Rock Waste Water Utility states sewer service is not available without a sewer main extension. 7. Analysis A 4,500 square foot single story church has existed at this location for many years. The structure has been used as a sanctuary, classrooms and a day-care center. A 960 square foot portable classroom structure was placed on the property without prior approval which generated contact from the City's Code Enforcement Office. In an attempt to comply with the Enforcement Office, the church has developed this long range plan and applied for a conditional use permit. Staff feels that with consideration given to screening the adjacent residential properties, this proposal can be supported. 8. Staff Recommendation Staff recommends approval of this application subject to: 1. Compliance with City Engineer and Utility Comments. 2. Compliance with the City's landscape and buffer ordinances with increased plantings in the buffer adjacent to the residential properties to the south and east, including trees which will grow to a height to help screen the proposed "steeple structure". 2 March 9, 1993 SUBDIVISION ITEM NO.: 7 (Continued) FILE NO.: Z-5659 3. Compliance with the phased parking and construction plan to assure adequate on-site parking. 4. All lighting for the parking lot and drives is to be low level, directional lighting, aimed away from the adjacent residential properties. SUBDIVISION COMMITTEE COMMENT: (FEBRUARY 18, 1993) Scott Evans was present representing Chenal Valley Church. Staff presented the item and outlined some concerns with the site plan regarding right-of-way dedication and required buffers/landscaping. Mr. Evans explained to the Committee that he was working with the staff to revise the site plan to comply with those concerns. A discussion then took place regarding the phasing of the right-of-way improvements to Taylor Loop Road and Carter Lane. Jerry Gardner of the City Engineer's Office stated that Taylor Loop Road should be improved as part of Phase I and Carter Lane should be improved when the Phase II parking lot improvements are made. Mr. Evans explained that the day-care center currently in operation at the church has 50 children. When the final project is developed, the day-care center will expand to a maximum of 125 children. After further discussion, the Committee forwarded this item to the full Commission for final resolution. PLANNING COMMISSION ACTION: (MARCH 9, 1993) Scott Evans was present representing Chenal Valley Church. There were no objectors present. Dana Carney, of the Planning staff, presented the item and informed the Commission that the applicant had submitted a revised site plan which addresses all staff concerns. He further stated that the applicant proposes to make the required improvements to Carter Lane at the time of the development of Phase II parking, adjacent to Carter Lane, and that the improvements to Taylor Loop Road will be done at the time of Phase II sanctuary development, which is an expansion in seating from 480 to 744±. The City Engineers' Office has approved this revised phasing plan. As part of the Consent Agenda, this item was approved subject to the conditions as noted in the staff recommendation. The vote was 9 ayes, 0 noes and 2 absent. 3