Loading...
Z-5617-A ApplicationCOLDWELL BANKER COMMERCIAL HATHAWAY GROUP 2100 RIVERDALE RD, SUITE 100 LITTLE ROCK, AR 72202 PO BOX 3730 LITTLE ROCK, AR 72203-3730 BUS. (501) 663-5400 FAX (501) 663-5408 wwH,. hathati,aygroo p.com MEMORANDUM TO: Chauncey Taylor, Chair, Little Rock Planning Commission Jeff Yates, Vice -Chair, Little Rock Planning Commission CC: Mark Stodola, Mayor Bruce Moore, City Manager Michael Keck, Director Tony Bozynski, Planning Director Dana Carney, Zoning and Subdivision Manager Donna James, Subdivision Administrator FROM: Jim Hathaway DATE: October 28, 2009 SUBJECT: Case Numbers Z -4807-F; Z -4807-G; and Z -5617-A Completion of Required Road Improvements—Phase 1 Wellington Hills Road, Champlin Drive, Kirk Road I am writing on behalf of my client, Whisenhunt Investments, Inc. ("Wl"), to provide you with a status report on the completion of the subject road improvements. As you know, on September 3, 2009 the Planning Commission approved an extension of the three subject Planned Developments for 2 years or until June of 2011. A condition of the 2 year extension vs. a 1 year extension was the applicant's completion of the Phase 1 road improvements on or before November 1, 2009 and the completion of the Phase 3 improvements by June of 2010. Exhibit A attached is a drawing of the area in question with the improvements to be built by WI divided into 3 phases. Exhibit A was presented to the Planning Commission at the September 3 meeting. The Phase I improvements are labeled and outlined in blue. In summary, significant progress has been made but all of the Phase 1 improvements will not be completed by November 1 due to the excessive rainfall we have experienced since September 3. There have been 38 work days from September 4 through October 28. The project engineering firm, DCI, has informed me that there has been 22 lost work days due to rain within that 38 day period. There have been another 4 lost work days spent cleaning up the effects of the rain just to get back to the condition when it starting raining. Each Office Is Independently Owned And Operated Case Numbers Z -4807-F; Z -4807-G; and Z -5617-A October 28, 2009 Page 2 of 2 In spite of one of the heaviest rainfall totals ever recorded for Little Rock during September and October, it is expected that a significant portion of the Phase 1 improvements will be completed on or about November 1. The portion of Wellington Hills east of the round -about; the portion of Champlin north of the round -about; and the roundabout itself have been constructed, landscaped, striped, and lighted. There is some striping and, if it stops raining, it may be possible to open this portion of the Phase 1 improvements by the first of next week. Once this has been done, through traffic between Chenal Parkway and Rahling Road will be able to use this new route and will no longer need to drive through the Wellington Hills subdivision. All of this has been communicated to Mr. Lance Hines, the current President of the Wellington Hills P.O.A. who has welcomed this news and who has been understanding of the weather related delays. The remaining portion of the Phase 1 improvements is the completion of Kirk Road south of the round -about to its intersection with Chenal Parkway. The eastern lane has been graded and paved in its entirety and curb and gutter has been installed for about one half of its length. Approximately one half of the western lane has been graded and paved with curb and gutter installed. However, the southern half of the western lane must be graded, paved and curb and gutter installed. It was not possible to do all of this work at the same time because one lane had to be kept open at all times to allow access to several occupied buildings on the west side. We are understandably reluctant to provide a new completion date for the balance of the Phase 1 improvements. Little Rock has now recorded over 20" of surplus rainfall year to date. One could assume that we are due some dry weather but it is raining again as this letter is being written. If we get a decent break in the weather, we should be able to get Kirk Road opened by the end of November thereby completing all of the Phase 1 improvements. If the rain continues, it will take a little longer. Once Phase 1 is completed, we will be asking the Planning Commission for "weather relief" on the November 1 deadline and to re -approve the 2 year extension of the subject Planned Developments. Meantime, an inspection of the area will clearly show that the improvements constructed to date have been well designed and will be a credit to the infrastructure in west Little Rock. Please let me know if you have any questions concerning this project. Attachment: Exhibit A EXHIBIT PA,;se / �OWNsAW 4 OF- oz - 09 Tia recdlAy 1 I i Ne.Yd rti Area , Vicinity Map L U 1111.1 Case: Z -5617-A N Location: South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center. Ward: 5 18 0 100200 400 Feet CT: 42.07 TRS: TIN R14W1 Land Use Case: Z -5617-A N Location: South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center. Ward: 5 0 100200 400 Feet PD: 18 CT: 42.07 Vicinity Map 14 - I I TRS: TIN R14W1 City of Little Rock Department of Planning and Development Planning Zoning and 723 West Markham Street Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 September 8, 2009 Mr. Robert Brown Development Consultants Inc. 2200 North Rodney Parham Road, Suite 220 Little Rock, AR 72212 Re: Shackleford Farms 30.8 Acres Long -form PCD Time Extension (Z- 5617 -A), located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center Dear Sirs: This is to advise you that in connection with your request concerning the above referenced file number the following action was taken by the Planning Commission at its meeting on July 23, 2009: X Approved with conditions. Recommended approval with conditions. Recommended approval as submitted. Denied your request as submitted. Deferred to the Other: Meeting. If you have any questions concerning any other matter please do not hesitate to contact me at 371-6821. Respectfully, Donna James, AICP Subdivision Administrator taCity of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 722D1 - 1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 September 8, 2009 Mr. Lance Hines 409 Wellington Wood Loop Little Rock, AR 72223 Re: Shackleford Farms 30.8 Acres Long -form PCD Time Extension (Z -5617-A), located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center, Shackleford Farms Long -form POD Time Extension (Z- 4807 -F), located North of Wellington Hills Road and West of the Villages of Wellington Subdivision and Shackleford Farms Long -form POD Time Extension (Z -4807-G), located North of Wellington Hills Road and West of the Villages of Wellington Subdivision Dear Citizen: On behalf of the Little Rock Planning Commission, I would like to thank you for your participation in the September 3, 2009 Commission meeting. It is very important to the City staff and the Planning Commission to have citizen input in the planning decision- making process. ` Shackleford Farms 30.8 Acres Long -form PCD Time Extension (Z -5617-A), Shackleford Farms Long -form POD Time Extension (Z -4807-F), and Shackleford Farms Long -form POD Time Extension (Z -4807-G), - was approved with conditions. For additional information, you can contact staff at 371-4790. Staff responsibilities are as follows: Conditional and Tower Use Permits — Dana Carney - Planning Future Land Use Plan Amendments — Walter Malone - Planning Rezoning and Zoning Variance — Monte Moore - Planning Subdivision and Planned Unit Developments — Donna James - Planning Land Alteration Variance Request — Vince Floriani — Public Works Thank you again for your input. Sincerely, Tony Bozynski Secretary to Little Rock Planning Commission City of Little Rock Department of Planning and Development Planning Zoning and 723 West Markham street Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 July 24, 2009 Mr. Robert Brown Development Consultants Inc. 2200 North Rodney Parham Road, Suite 220 Little Rock, AR 72212 Re: Shackleford Farms 30.8 Acres Long -form PCD Time Extension (Z- 5617 -A), located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center Dear Sirs: This is to advise you that in connection with your request concerning the above referenced file number the following action was taken by the Planning Commission at its meeting on July 23, 2009: Approved with conditions. Recommended approval with conditions. Recommended approval as submitted. Denied your request as submitted. X Deferred to the September 3 2009 Meeting. Other: If you have any questions concerning any other matter please do not hesitate to contact me at 371-6821. Respectfully, Donna James, AICP Subdivision Administrator July 14, 2009 Mr. Jim Hathaway Senior Vice President Caldwell Banker Commercial Hathaway Group 2100 Riverdale Rd., Suite 100 Little Rock, AR 72202 Mr. Hathaway; The Following is a synopsis of our current construction projections, inclusive of completed items from to Kirk Road thru the roundabout to Chenal, following our weekly sub -contractors meeting this morning for the Shackleford 150 Project. Cranford mobilized today Tuesday, (146), and wi11 have the North section of Kirk and Wellington Hills complete by the 2&. or 5 days total. (Note: All dates erre based upon a scheduled amount of days ro perform the task. Any weather or outside of paving delays well move schedule to the right by the amount of days affected) Starting on the 2151, Cranford will move to South Kirk and place black base down only on the roundabout area - completing task on the 27". Beginning 28"i, Cranford will complete Arkansas Systems and finish top course on the roundabout area by the rd With the Paving complete from the roundabow north, we will need an additional 5 days for landscaping, striping, and any ancillary items needed, which will open the roundabout for traffic on August I 1 . Cranford will move to the east side of Kirk beginning approximately at Parkway Automotive and begin paving to Chena€ on August 4r". Current projection is lS workings days, which includes attached drives. This will give thein a target date of August 22 for completion of the paving process. With an additional tS days for close out items, this will give an opening date, thru to Chenal, of September 15'", Areas a FF Concern In order for grading to be completed on Kirk Road South, Entergy must have the overhead power lines relocated. Original date of completion From there was to be July 17`". In a conversation with Brad Vance, (Entergy overhead Engineering), he advised me that the date would now be as late as the 24 This will trickle down to all aspects of construction, delaying above targets by the amount of days past the 17'". We are also waiting for final approval from the City's traffic engineering department For signage and striping configurations. Sincerely, 9" Barry A. Bray Bravo Deuce Resources 501-351-2573 COLDWELL BANKER COMMERCIAL HATHAWAY GROUP 2100 RIVERDALE RD, SUITE 100 PO BOX 3730 LITTLE ROCK, AR 72203-3730 BUS. (501) 663-5400 FAX (501) 663-5408 www. ha th awaygi oupxom MEMORANDUM TO: Tony Bozynski CC: Mayor Mark Stodola City Manager Bruce Moore Jeff Yates Dana Carney Donna James Pam Adcock William Changose J.T: Ferstl Troy Laha Jerry Meyer Obray Nunnley William F. Rector, Jr. Billy Rouse Candice Smith Chauncey Nick Taylor FROM: Jim Hathaway DATE: July 15, 2009 SUBJECT: Case Numbers Z -4807-F, Z -4807-G, and Z -5617-A I am writing to you, as per my role as the agent for the applicant for the three subject Cases, to (1) provide your office and the Planning Commissioners with a status report on the construction of the required improvements, and (2) to request a deferral of this matter until the next Planning Commission Meeting. STATUS REPORT. At the last Planning Commission Meeting on June 9, 1 told the Commissioners that the primary reason for the recent delay in the construction of the street improvements north of Chenal had been the problems my client had encountered in the acquisition of the required rights-of-way along the east side of Kirk Road. I am pleased to report that all of the required right-of-way has now been acquired and that all of this documentation has now been turned over to the City and Entergy. Attached is a letter to me dated July 14, 2009 from Mr. Barry Bray of Bravo Duece Resources, the Construction Manager for my client, which provides the latest thinking regarding the timing for the completion of the street and utility improvements to be constructed north of Chenal Parkway (Phase 1). 1N SUMMARY, ALL OF THE RIGHT OF WAY HAS NOW BEEN ACQUIRED; CONSTRUCTION IS ABOUT TO BEGIN; AND BRAY'S SCHEDULE PREDICTS THE COMPLETION OF THESE IMPROVEMENTS BY MID -SEPTEMBER. Phase II of the Each Office Is Independently Owned And Operated. Case Numbers Z -4807-F, Z -4807-G, and Z -5617-A July 15, 2009 Page 2 of 2 improvements will consist of the extension of Kirk Road south of Chenal Parkway, along the western boundary of the new Kroger store. This work is planned at present for completion by November 1. Phase III of the improvements will consist of certain improvements to Chenal Parkway and Kanis Road west of the Kirk Road/Chenal Parkway intersection. The approved plans for Phase Ill were received from Public Works yesterday and are ready to be put out for hid. Construction on Phase III will begin immediately upon completion of construction of Phase II. REQUEST FOR DEFERRAL. As you know, my client filed for a 2 year extension of the three previously approved PCOs. These Cases have been deferred several times for various reasons. The most recent deferral was granted at the June 9 Planning Commission Meeting until the July 23 Planning Commission meeting because only 8 Planning Commissioners were able to vote on this matter at that time. At that time, I failed to remember that I had been scheduled for several months to be out of the state on vacation on July 23. We were also told at that time that there will likely be a similar problem with a quorum for the July 23 meeting. My client is therefore requesting a deferral until the next Planning Commission Meeting on September 3. It is our belief that a deferral until September 3 will in no way cause any difficulty for anyone involved in this matter and we will certainly not hold up the construction process. As per the Status Report above, it is clear that my client has proceeded in good faith to acquire the last pieces of right-of-way and that my client is planning to quickly proceed with the construction of Phase 1. We also believe a deferral is fair in light of the fact that only S members of the Commission were available to vote at the last meeting. Please provide me with the Staff Recommendation concerning this request for a deferral as soon as possible. Attachment: (1) Letter from Mr. Barry Bray taCity of Little Rock Planning Department of Planning and Development Zoning and 723 West Markham Street Subdivision Litve Rock, Arkansas 72261.1334 tr.r:e; (501) 371.4790 Fax: (501) 399-3435 or 371-6863 NOTICE OF PUBLIC HEARING BEFORE THE LITTLE ROCK PLANNING COMMISSION ON A REQUEST FOR A USE CHANGE OR DEVELOPMENT OF LAND DATE: July 28.2009 TO: Coalition of West Little Rack ATTENTION: Mary Domhoffer ADDRESS: 6916 Westrid e Road Roland AR 72135 REQUEST: Shackle£ord Farms 30.8 Acres Long -form PCD Time Extension Z -5617- A a re uest for an extension of time for an a roved Planned Commercial Develo ment to allow two additional ears to the current a roval for submission of the final develo ment Ian. GENERAL LOCATION OR ADDRESS: located South of Kanis Road and Chenal Parkwa andWest of the existin Kraer Sho inCenter OWNED BY/APPLICANT: Wisenhunt's —Robert Brown. DIC A etlt NOTICE IS HEREBY GIVEN THAT an application for a Planned Zanin District of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L.R. Planning Commission in the Little Rock Board of Directors Chambers, second floor, City Hall, 500 West Markham Street, on Se t_ o ember 3,2009 at 4:04 P.M. You were previously notified of this application request. This item was deferred from. the July 23, 2009, public hearing to this new hearing date. This notice is provided in order to assure that neighborhood associations are aware of issues that may affect their neighborhood. Information requests should be directed to the Planning staff at 371-4790. Tony Bozynski Director of Planning and Development City of Little Rock Planning Department of Planning and Development Zoning and 723 West Markham Street Subdivision Little Rock, Arkansas 72201-1334 ta Phone: (501) 371.4790 Fax: (501) 399-3435 or 371-6863 NOTICE OF PUBLIC HEARING BEFORE THE LITTLE ROCK PLANNING COMMISSION ON A REQUEST FOR A USE CHANGE OR DEVELOPMENT OF LAND DATE: June 16, 2009 TO: Coalition of West Little Rock ATTENTION: Mar Dornhoffer ADDRESS: 6916 Westrid e Road Roland AR 72135 REQUEST: Shackleford Farms 30.8 Acres Lon -farm PCD Time Extension Z -5617- A are uest far an extension of time for an a raved Planned commercial Development to allow two additional ears to the current a roval for submission of the final develo ment lan. GENERAL LOCATION OR ADDRESS: located South of Danis Road and Chenal Parkway and West of the exis!Lqa, Kroger Sho ing Center OWNED BY/APPLICANT: WisenhunLIS —Robert Brown DIC A ent NOTICE IS HEREBY GIVEN THAT an application for a Planned Zonin District of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L.R. Planning Commission at the Robinson Center, located at the corner of West Markham Street and Broadway, on July 23 2009 at 4:00 P.M. You. were previously notified of this application request. This item was deferred from the June 11, 2009, public hearing to this new hearing date. This notice is provided in order to assure that neighborhood associations are aware of issues that may affect their neighborhood. Information requests should be directed to the Planning staff at 371-4790. Tony Bozynski Director of Planning and Development City of Little Rock Department of Planning and Development Planning Zoning and 723 West Markham Street Little Rock, Arkansas 72201-1334 Subdivision IR Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 June 12, 2009 Mr. Robert Brown Development Consultants Inc. 2200 North Rodney Parham Road, Suite 220 Little Rock, AR 72212 Re: Shackleford Farms 30.8 Acres Long -form PCD Time Extension (Z- 5617 -A), located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center Dear Sirs: This is to advise you that in connection with your request concerning the above referenced file number the following action was taken by the Planning Commission at its meeting on June 11, 2009: Approved with conditions. Recommended approval with conditions. Recommended approval as submitted. Denied your request as submitted. X Deferred to the _July 23, 2009 Meeting. Other: If you have any questions concerning any other matter please do not hesitate to contact me at 371-6821. Respectfully, Donna James, AICP Subdivision Administrator Re: Parkway Auto/Mike Davidson James, Donna From: Hood, Mike Sent: Thursday, June 11, 2009 9:59 AM To: James, Donna Subject: FW: Parkway Auto/Mike Davidson From: James Williams[mailto:jwilliams@williamsdean.coml Sent: Wednesday, June 10, 2009 3:27 PM To: Keck, Michael; Hood, Mike Cc: Mike Davidson Subject: Re: Parkway Auto/Mike Davidson Michael- Thanks for your prompt response -as usual you seem to be on top of the issue -James James Williams, AIA President Williams & Dean Associated Architects, Inc. 501.224.1900 phone 501.224.0873 fax On 6/10/09 3:19 PM, "Keck, Michael" <MKeck@stvincenthealth.com> wrote: Page 1 of 2 Thank you for your e-mail. I have had numerous discussions with the city attorney and city manager over the last 24 hours as to how we get the necessary work completed. In fact, as I write this e-mail, Public Works and Planning Staff are meeting to discuss options on enforcing the agreement reached with the Whisenhunts. It appears that the Whisenhunts are going to be in violation the agreement reached with the city a few months ago to complete this road by July ist. I have asked that a schedule be established to do that which is necessary to complete the work as soon as possible and that the agreement be enforced with penalty provisions implemented if they do not meet the July 1 deadline. Michael Keck, FACHE Administrative Director External Relations St. Vincent Health System # 2 St. Vincent Circle Little Rock, AR 72205 501/552-8280 office 501/552-4241 fax From: James Williams rmalito:iwilliams0williamsdean.corn Sent: Wednesday, June 10, 2009 3:18 PM To: Mhood@littlerock.org; Keck, Michael 6/11/2009 j�,,,'O), �) Jr � r— Re: Parkway Auto/Mike Davidson Page 2 of 2 Cc: Mike Davidson Subject: Parkway Auto/Mike Davidson Mr. Hood/Mr. Keck - I have been made aware that Mike Davidson, a business associate of mine, is asking the City of LR to have a developer fulfill an agreement to improve Kirk Road near Mike's business. I understand that Mike has had to deal with this for about two years. I know Mike to be a good corporate and civic minded citizen. I know the lack of prompt response by the developer to fulfill his agreement has caused Mike loss of business, out of pocket expense, and time that he could be spending on more important things. Anything you can do to support his cause would be appreciated and I believe the right thing to do. Thanks for your consideration -James 6/11/2009 Road Construction - Parkway Automotive James, Donna From: Hood, Mike Sent: Thursday, June 11, 2009 9:58 AM To: James, Donna Subject: FW: Road Construction - Parkway Automotive From: Roger G. Best [mailto: Roger@ BizTekCon nection.com] Sent: Wednesday, June 10, 2009 3:44 PM To: Hood, Mike Subject: Road Construction - Parkway Automotive June 10, 2009 Dear Mr. Hood, Page 1 of 1 A business associate of mine has been dealing with the road construction on Kirk Road for almost two years. Delay after delay has occurred due to what appears to be poor planning by the developer. Most businesses can survive a 6 month construction interruption but this project has been in process since October, 2007. It has been necessary for Parkway Automotive to wash customer's cars due to the dust, clean mud off customer's cars due to mud left on the road, directional sign expense, customers having to take detours, partial road closures, confusing parking arrangements, etc. Kirk Road has deteriorated and now is the worst road in West Little Rock with multiple cuts across it, steel plates in various locations, and the inability for two vehicles to safely pass. On behalf of my business associate, please act quickly and decisively in seeing that this road is completed in a timely manner. Sincerely, Roger G. Best, President BizTek Connection, Inc. 4700 West Commercial Drive Suite B4 North Little Rock, AR 72116 6/11/2009 Page 1 of 2 James, Donna From: Hood, Mike Sent: Thursday, June 11, 2009 9:57 AM To: James, Donna Subject: FW: Parkway Automotive From: Keck, Michael [mailto:MKeck@stvincenthealth.com] Sent: Wednesday, June 10, 2009 4:54 PM To: Rick DeWese; Hood, Mike Subject: RE: Parkway Automotive Thank you for your e-mail. I have had numerous discussions with the city attorney and city manager over the last 24 hours as to how we get the necessary work completed. In fact, as I write this e-mail, Public Works and Planning Staff are wrapping up a meeting to discuss options on enforcing the agreement reached with the Whisenhunts. It appears that the Whisenhunts are going to be in violation the agreement reached with the city a few months ago to complete this road by July 1St. I have asked that a schedule be established to do that which is necessary to complete the work as soon as possible and that the agreement be enforced with penalty provisions implemented if they do not meet the July 1 deadline. Michael Keck, FACHE Administrative Director External Relations St. Vincent Health System # 2 St. Vincent Circle Little Rock, AR 72205 501/552-8280 office 501/552-4241 fax From: Rick DeWese [mailto:rick.dewese@businessworld-usa.com] Sent: Wednesday, June 10, 2009 4:47 PM To: Mhood@littlerock.org; Keck, Michael Subject: Parkway Automotive Mr. Hood & Mr. Keck, I am writing on behalf of Mike Davidson. I have been a customer at Parkway for many years and a personal friend of Mike's as well. Mike is an excellent businessman and has built an excellent automobile service center on Kirk Rd. The road conditions on Kirk Rd are to the point of unbearable. It is understandable that Kirk Rd could be "under construction" during the period in which to build the church, but this Road has been down far too long. It is difficult enough in these economic times to run a business and survive, but the conditions under which Mike is forced to run his business is beyond 6/11/2009 -,(—(Vvvv, 1, 1v�,� Page 2 of 2 comprehensible. Mike has offered all kinds of incentives and spent a lot of money directing people to his business. His business relies heavily on return customers and it is very difficult for him to "make a lasting impression" based on the conditions he has been forced into. If you visit his service center you will see what a fine establishment he has maintained throughout this period of Kirk Rd being demolished. It would be a shame to see one our great small business owners and community leaders lose his business to conditions that are out of his control. Please take a moment to consider this matter and act decisively to see that this road be restored to a commutable Little Rock standard city street. Thank you in advance for your consideration. Business World Oocurnent Solutions Now Mas New rerhnnl-�,iy 920 S. Spring St Little Rock, AR 72201 501-399-3318 6/11/2009 Page 1 of 1 James, Donna From: Hood, Mike Sent: Thursday, June 11, 2009 9:56 AM To: James, Donna Subject: FW: Kirk Road From: Judy McDowall[mailto:jmcdow@biotechnicalservices.com] Sent: Wednesday, June 10, 2009 5:26 PM To: Hood, Mike Subject: Kirk Road Dear Mr. Hood, A business associate of mine, Mike Davidson of Parkway Automotive Services, has been dealing with the road construction on Kirk Road since October, 2007. This is altogether an unreasonable period of time that has and continues to have detrimental effects on his business. It has been necessary for Parkway Automotive to wash customer's cars due to the dust and clean mud off customer's cars due to mud left on the road. In addition they have had experienced directional sign expense, customers having to take detours, partial road closures, confusing parking arrangements, and more. Kirk Road has deteriorated and now has multiple cuts across it and steel plates in various locations. Two vehicles are unable to pass safely. Please take action to see that construction on Kirk Road is completed soon. Sincerely, Judith C. McDowall Judith C. McDowall, MS, RQAP-GLP, RAC Biotechnical Services, Inc. 4610 West Commercial Drive North Little Rock, AR 72116 (501) 758-6290 X103 voice (501) 753-5963 fax jmcdow9biotechnical5ervices. com Visit our website: ZV71 ).biotechnicalsercrice5.corn 9 6/11/2009 RICHARD C. DOWNING, P.A. A Professional Corporation ATTORNEY AT LAW 1701 CENTERVIEW DRIVE SUITE 102 OF COUNSEL: JAMES &HOUSE, P.A. LITTLE ROCK, ARKANSAS 72211 TELEPHONE: 501/687-9411 FAX: 501/687-9401 E-MAIL: re ownin downin-law.com May 19, 2009 Mr. Tom Carpenter City Attorney's Office 500 West Markham Street Suite 310 Little Rock, AR 72201 Re: Kirk Road/Whisenhunt Development Dear Tom: Please allow this letter to serve as an update regarding the matters set out in my March 10, 2009 letter to you.' I understand you were not present at a recent meeting Mr: Jim Hathaway, the Whisenhunt representative, had with the Mayor and the City Manager. At that meeting, Mr. Hathaway informed all present of the problems my client has encountered regarding obtaining the necessary right-of-way for completion of the Kirk Road improvements. As a result of the meeting, with the City's cooperation, the neighboring property owners have now either donated the right-of-way or informally consented to the sale of the right- of-way without the purchase of their remaining real property. Though my client believes the purchase price of the right-of-way is unreasonable, my client has acknowledged its obligations to the City. We anticipate the purchase to occur within the next couple of weeks. However, although my client had contractors prepared to complete the paving and street improvements, as a result of this latest delay and due to the weather conditions of the past month, my client may not be able to complete work by the anticipated July I" target date. We have requested a rain day schedule from DCI, but wanted to keep you advised of our progress regarding this project now, rather than wait until July IS`. Mr. Tom Carpenter May 19, 2009 Page 2 I note the City has never acknowledged my March 10, 2009 letter. However, my client wants to keep you informed of its continuing conunitment to completion of the Kirk Road improvements. Thanks for your attention. Very truly yours,,- Richard ours,:Richard C. Downing RCD/ts cc: Doug Robertson Jim Hathaway City of Little Rock Planning Department of Planning and Development Zoning and 723 West Markham Street Subdivision Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 NOTICE OF PUBLIC HEARING �� �QUERST FD LAfIUTSE CHANGE PLANNING COMMISSION OR DEVELOPMENT OF LAND DATE: May lel, 2099 TO: Caaiition of West Little Rock ATTENTION: Mar Domhoffer ADDRESS: 69Id Westrid e Road Roland AR 72135 REQUEST: Shackleford Farms 30.8 Acres Lan -form PCD Time Extension ercial a 561 - A are uest far an extension of time for an a roved Planned Comm +I. ^%i nt nnnrnval for submission of the final Pi develo meat lan. GENERAL LOCATION OR ADDRESS: iacated South of Kanis Road and Chenal Parkwa and West of the existin Kroizer Shopping Center OWNED BY/APPLICANT: Wisenhunt's —Robert Brown DIC Aiozent NOTICE IS HEREBY GIVEN THAT an application for a Planned Zonin District of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L.R. Planning Commission at the Robinson Center, located at the corner of West Markham Street and Broadway, on June 11, 2009 at 4:00 P.M. You were previously notified of this application request. This item was froyn the April 30, 2009, public hearing to this new hearing date. This notice is deferred are aware provided in order to assure that neighnorh sshould be directed to hesPlann ng staff affect their neighborhood. Informatiarequests at 371-4790. Tony Bozynski Director of Planning and Development taCity of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 May 1, 2009 Mr. Robert Brown Development Consultants Inc. 2200 North Rodney Parham Road, Suite 220 Little Rock, AR 72212 Re: Shackleford Farms 30.8 Acres Long -form PCD Time Extension (Z- 5617 -A), located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center Dear Sirs: This is to advise you that in connection with your request concerning the above referenced file number the following action was taken by the Planning Commission at its meeting on April 30, 2009: Approved with conditions. Recommended approval with conditions. Recommended approval as submitted. Denied your request as submitted. X Deferred to the June 11, 2009 Meeting. Other - If you have any questions concerning any other matter please do not hesitate to contact me at 371-6821. Respectfully, Donna James, AICP Subdivision Administrator DEVELOPMENT CONSULTANTS INCORPORATED April 24, 2009 Ms. Donna James City of Little Rock Planning and Development Division 723 West Markham Street Little Rock, Arkansas 72201 IRE: Shackleford Farms PZD Ordinance Extensions DCI Project #06-115 Dear Donna: Please accept this letter as our written notice to request a second deferral of the applications for time extensions for the following PZD ordinances: 1. Ordinance No. 19, 558 titled Shackeford Farms 30.8 Acres Long -Form PCD (Z- 5617 -A). 2. Ordinance No.19, 560 titled Shackleford Farms Long -Form POD (Z -4804-F). 3. Ordinance No. 19, 561 titled Shackleford Farms Long —Form PCD (Z -4807-G). We are requesting this deferral due to on-going negotiations to acquire necessary right- of-way on Kirk Road. This issue directly affects the developer's ability to update the work schedule at this time. Please place these items on the agenda for the June 11, 2009 meeting of the Planning Commission. Please contact my office if you have any questions or require additional information. Sincerely, u rlopment Consultants, Inc. Robe Brown Vice -President Cc: Doug Robertson Kemp Whisenhunt Jim Hathaway G:2006\06-115\Planning\Documents\06-115w.doc Engineering 9 Planning Land Surveying G Landscape Architecture 2200 North Rodney Parham Road, Suite 220 • Little Rock, Arkansas 72212 • Telephone 501.221-7880 • Fax 501-221-7882 509 West Spring Street, Suite 135 • Fayetteville, Arkansas 72701 • Telephone 479.444-7880 • Fax 479-251-8210 Pagel of 3 Bozynski, Tony From: Moore, Bruce Sent: Tuesday, April 14, 2009 8:15 AM To: Jim Hathaway; Stodola, Mark; Carpenter, Tom; Keck, Michael Cc: Coop, Griffin; Beck, Steve; Floriani, Vince; Bozynski, Tony; Carney, Dana; James, Donna; markw@dci-Ir.com; Baehr, Laurie Subject: RE: Applications for Extension of Shackleford Farms Planned Developments Jim, I had an initial briefing with staff yesterday before I read this email. I will be out of town Wednesday through Friday but I am willing to set up a meeting for the first of next week. Please call Laurie in my office to coordinate. Bruce From: Jim Hathaway[mailto:jimhathaway@hathawaygroup.com] Sent: Monday, April 13, 2009 12:03 PM To: Stodola, Mark; Moore, Bruce; Carpenter, Tom; Keck, Michael Cc: Coop, Griffin; Beck, Steve; Floriani, Vince; Bozynski, Tony; Carney, Dana; James, Donna; markw@dci-Ir.com Subject: FW: Applications for Extension of Shackleford Farms Planned Developments Importance: High On April 2, 1 requested a meeting to discuss a resolution of the natter involving the completion of the Dirk Road Construction project and the application for the extension of the Shackleford Farms Planned Developments. Since April 2. I have followed twice with Mayor Stodola's office in an effort to determine if and when such a meeting could be held. I have spoken with Griffin Coop both times but, while he has been most courteous, I have not yet had any response on my original request. in the meantime, my client has continued to pursue the dedication of the required right of way from 4 contiguous owners on the west side of Kirk Road. This is the ROW which must be obtained in order to construct the improvements in accordance with the previously approved design. One of the 4 owners (the owner with the sma.l lest amount of frontage) has agreed verbally to dedicate the required ROW. However, the other 3 have not as yet agreed to do so. The circumstances vary for each of these 3 owners but it is clear that at least 2 of these owners have not been cooperative to date and show no signs of willingness to dedicate the required ROW in the future even though my client has offered to build the required improvements oil their side of the road at no cost to them. In short, every story has more than one side and I have been asking for a meeting to discuss the facts as we understand them as well as the alternative solutions. Since the clock is running, a member of Whisenhunt Investments, its engineer, and I met with Vince Floriani of Public Works this morning to discuss an alternative design should it become impossible to acquire the ROW which is needed in order to implement the approved design. We believe this alternative design represents a workable solution to the present impasse regarding the required ROW dedication. Based upon this meeting, itis our understanding that Vince plans to bring this idea to the attention of Steve Beck and then to Bruce Moore and Tom Carpenter within the next few days. I would like very much to be in attendance when this matter is discussed with Bruce and Tom and I am writing to request this. I would like to underscore the intent of my client to complete the entire Kirk Road improvements as per the original design as soon as possible. However, they cannot do this if the required ROW cannot be obtained. Three of the owners on the west side of Kirk Road who will benefit significantly from the construction of these improvements have, to date, not agreed to dedicate the required ROW. Unless they change their minds, it may be necessary to alter the design. This is a complicated matter involving a very large amount of money that deserves a full discussion with all of you. 4/14/2009 Page 2 of 3 Thank you in advance for your cooperation in allowing me to meet with you. Please let me know when this can be done. James E. Hathaway, Jr., CRE Coldwell Banker Commercial Hathway Group 2100 Riverdale, Suite 100 Little Rock, AR 72202 (501) 978.4968 office (501) 680.2288 cell Connecting People and Properties for 42 years. From: Jim Hathaway Sent: Tuesday, April 07, 2009 3:23 PM To: gcoop@littlerock.org Subject: FW: Applications for Extension of Shackleford Farms Planned Developments Please let me know what is possible at your earliest convenience. James E. Hathaway, Jr., CRE Coldwell Banker Commercial Hathway Group 2100 Riverdale, Suite 100 Little Rock, AR 72202 (501) 978.4968 office (501) 680.2288 cell Connecting People and Properties for 42 years. From: Jim Hathaway Sent: Thursday, April 02, 2009 9:04 AM To: mstodola@littlerock.org; bmoore@littlerock.org Cc: tcarpenter@littlerock.org; mkeck@littlerock.org Subject: Applications for Extension of Shackleford Farms Planned Developments Importance: High I have been retained by Whisenhunt Investments to represent it in regard to its recent applications to obtain a 2 year extension for 3 Planned Developments in the general vicinity of Chenal Parkway and Kirk Road. The 3 Planning Department File numbers are Z -4807-F, Z -4807-G, and Z -5617-A. This matter was recently deferred to the forthcoming Planning Commission meeting on April 30. I have been briefed by my client regarding the original submissions in 2006 and the events that have transpired to date including the City Attorney's demand letter for the completion of the infrastructure improvements dated March 10 and Dick Downing's letter of response dated March 11. 1 have also reviewed the complete files in the Planning Department. I am writing to request a meeting with the two of you as soon as possible for the purpose of working out a constructive solution to this matter. I believe it would be most helpful if Tom Carpenter and Director Michael Keck could also attend and I have copied them on this memo. If you desire other staff members to attend that will also be fine. With the exception of the 8:00 to 8:30 time slot on Monday and the 8:00 to 10:30 time slot on Tuesday, I can meet any time next week—the sooner the better. I will be prepared to offer a brief summary of where I understand we are and to ask what my client needs to do in order to restore the best possible relationship with the 4/14/2009 Page 3 of 3 City. I will hold my calendar open pending a response from your office. Thank you in advance for your cooperation and please let me know as soon as possible when we can meet. 4/14/2009 taCity of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 NOTICE OF PUBLIC HEARING BEFORE THE LITTLE ROCK PLANNING COMMISSION ON A REQUEST FOR A USE CHANGE OR DEVELOPMENT OF LAND DATE: March 24 2009 TO: Coalition of West Little Rock ATTENTION: Mary Dornhoffer ADDRESS: 6916 Westrid e Road Roland AR 72135 REQUEST: Shackleford Farms 30.8 Acres Long -form PCD Time Extension (Z-5617- A), a request for an extension of time for an a raved Planned Commercial Develo meet to allow two additional years to the current a royal for submission of the final development plan. GENERAL LOCATION OR ADDRESS: located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center OWNED BY/APPLICANT:_ Wisenhunt's —Robert Brown DICAgent NOTICE IS HEREBY GIVEN THAT an application for a Planned Zo iing District of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L.R. Planning Commission at the Robinson Center, located at the corner of West Markham Street and Broadway, Room 103, on April 30. 2009 at 4:00 P.M. You were previously notified of this application request. Thisitem was deferred from the March 19, 2009, public hearing to this new hearing date. This notice is provided in order to assure that neighborhood associations are aware of issues that may affect their neighborhood. Information requests should be directed to the Planning staff at 371-4790. Tony Bozynski Director of Planning and Development City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 March 20, 2009 Mr. Robert Brown Development Consultants Inc. 2200 North Rodney Parham Road, Suite 220 Little Rock, AR 72212 Re: Shackleford Farms 30.8 Acres Long -form PCD Time Extension (Z- 5617 -A), located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center Dear Sirs: This is to advise you that in connection with your request concerning the above referenced file number the following action was taken by the Planning Commission at its meeting on March 19, 2009: Approved with conditions. Recommended approval with conditions. Recommended approval as submitted. Denied your request as submitted. X Deferred to the Aril 30 2009 Meeting. Other: If you have any questions concerning any other matter please do not hesitate to contact me at 371-6821. Respectfully, Donna James, AICP Subdivision Administrator RICHARD C. DOWNING, P.A. A Professional Corporation ATTO12nY AT LAW 80:1 W. Third Street P.O. $o� 3585 LITTLE ROCK, ARKANSAS 72203 TSI JEPHONE: 501/372-2066 FAX: 5013764420 E-MAIL: rcdownina@dlDwning-lavv.com March 10, 2009 Mr. Tom Carpenter City Attorney 310 City Hall 500 West Markham Little Rock, AR 72201 OF COUNSEL: JAMES & HOUSE, P.A. VIA MAIL AND E-MAIL Re:' Joe and'Margaret-Whisenhunt/Kirk:Road = .. . ++ii.?h.•:� •; 1... r� r. l.-. C. -• -•Jf •� _ .,`,- Dear �. 1 ' - :}•i c+,>; :.` '_s.: fI''>> '111. t: c "a Please allow this letter to reference your,•March 6;.2009 letter and_ - our, meeting -of MV rch - 10, 2009. in your letter, - you ekpressed the- City -of- Little. Rock's. concern.- regarding the construction of the improvements to•Kirk Road. in particular-, whether or not.my,clients, Jae and Margaret Whisenhunt, have performed per 'the requirements -of LRCS 19,558, 19560 and 19,561. You also reference a rune 6, 2006 letter from Mr. Doug Robertson who is my clients' authorized representative. 'Sohn, as you know, my clients believe they'have acted at -all. timep in•acc4dance with the above referenced` ordinances. For a variety of reasons, most .of whrcl you; the staff and my clients' representatives have previously articulated, the improvements have not been completed as soon as was originally anticipated. My clients are willing to state, without any admission they have not complied with the above referenced ordinances, the public improvements to Kiri •Road north of • Chenal Parkwaiy will be completed no latex than -July 1, 2009•. For purposes ¢f -this letter,, -completion shall ,ean the date the. City of Little Rack Public Work states, to my clients,-.thp_: pnpro vements have been. substantially completed. This statement shall be -made in writing to my clients try tYie City •cif Lief le'Rock Public Works. If such substantial completion has not occurred by July 1, 2009; then Joe and Marga--r_et _ Whisenhunt shall be liable, to the City of Little Rock, for the agreed upon liquidated damage sum of. $100.04 per day, -after July 1,•2009 --or -such date subsequently agreed by the City of Little Rock, until the -date of -substantial completion shall occur. Mr. Tom Carpenter March 10, 2009 Page 2 It is further noted that the date of July 1, 2009 is a'datew and agreed to by my clients. My clients note that they are riot ible for "acts of including inclement weather conditions, nor actions of others suc and Margaret Whisenhunt co o complMROR applicable utility companies. Joe g 2009. However, should the "acts of God" or the actions pu tc Whisenhunt's performance, the Whisenhunts will immediate he matter delaying their performance and request an extension of the July 1, 2009 date. Suc m any, shall be at the sole discretion of the City of Little Rock; however, such extension shall not ,?�e,k11p�' :siIP ld. Please note my clients ate very proud to be a part of making these public improvements to the City of Little Rock. As you may be aware, my clients have taken their responsibilities very setiously and, on numerous occasions, made decisions regarding the improvements, which exceed the requirements placed upon them per the above referenced ordinances. They currently have expended in excess of 7.5 million dollars on the public improvements and the remaining public improvements, not involving Kirk Road, separately, will exceed this amount. The City of Little Rock's interest in the safety of its citizens will be well served by these public improvements. If• this letter correctly states the agreement made this morning in your office, please acknowledge below. ?Rmh-8 cc: Doug Robertson 25,y,oc? Richard C. Downing APPROVED: CITY OF LITTLE ROCK Date: Tom Carpenter, City Attorney DEVELOPMENT CONSULTANTS INCORPORATED March 13, 2009 Ms. Donna James City of Little Rock Planning and Development Division 723 West Markham Street Little Rock, Arkansas 72201 RE: Shackleford Farms PZD Ordinance Extensions DCI Project #06-115 Dear Donna: Please accept this letter as our written notice to request a deferral of the applications for time extensions for the following PZD ordinances: 1. Ordinance No. 19, 558 titled Shackeford Farms 30.8 Acres Long -Form PCD (Z- 5617 -A). 2. Ordinance No.19, 560 titled Shackleford Farms Long -Form POD (Z -4804-F). 3. Ordinance No. 19, 561 titled Shackleford Farms Long —Form PCD (Z -4807-G). We are requesting this deferral due to a schedule conflict with the owner's legal counsel. Please place these items on the agenda for the April 30, 2009 meeting of the Planning Commission. Please contact my office if you have any questions or require additional information. Sincerely, Development Consultants, Inc. Robert M. Brown Vice -President Cc: Doug Robertson Kemp Whisenhunt G:2006\06-115\PIan ning\Documents\06-115w.doc Engineering 0 Planning I Land Surveying 0 Landscape Architecture 2200 North Rodney Parham Road, Suite 220 • Little Rock, Arkansas 72212 • Telephone 501.221-7880 • Fax 501-221-7882 509 West Spring Street, Suite 135 • Fayetteville, Arkansas 72701 • Telephone 479.444.7880 • Fax 479-251.8210 From:Whisenhunt Investments 501 687 9401 RICHARD C. DOWNING, P.A. A Professional Corporation ATTORNEY AT LAW 801 W. Third Street 1> 0. Box 3585 LITI'LE ROCK, ARKANSAS 72203 TELEPHONE; 501/372.2066 FAD.: 56113764420 r -MAIL: Maruh 10, 2009 Mr. Tom Carpenter City Attorney 310 City Hall 500 West Markham Little Rock, AR 72201 Re: Joe and Margaret Whisenhunt/Kirk Road Dear Tone' 03/11/2009 14:03 #036 P.0021003 OF COUNSEL: JAMF,S & HO USI;, P.A. VIA MAIM. AND E-MAIL Please allow this letter to reference your March 6, 2009 letter and our meeting of March 10, 2009. In your letter, you expressed the City of Little Rock's cancrra regarding the constmetion of the improvements to Kirk Road. In particular, wi ether or not my clients, Joe and Margarct Whisenhunt, have performed per the requirements of LROs 19,558. 19560 and 19,551. You also reference a June 6, 2006 letter from Mr. Doug Robertson who is my clients' authorized representative. Tom, as you know, my clients believe they have acted at all times in accordance with the above referenced ordinances. For a variety of reasons, most of which you, the staff and my clients' representatives have previously articulated, the improvements have not been completed as soon as was originally anticipated. My clients are willing to state, without any admission they have not complied with the above referenced ordinances, the public improvements to Kirk Road north of Chenal Parkway will be completed no later than July 1, 2009. For purposes of this letter, completion shall mean the date the City of Little Rock Public Work states, to my clients, the improvements have been substantially completed. This statement shall be, made in writing to my clients by the City of Little Rock Public Works. If such substantial completion has not occurred by July 1, 2009, then Joe and 'Margaret Whisenhunt shall be liable, to the City of Little Rock, for the agreed upon liquidated damage sure of $100.00 per day, after July 1, 2009 or such date subsequently agreed by the City of Little Rock, until the date of substantial completion shall occur. VO/60 3JGd Alld AlI3 5L9PTLET05 99:tT 600Z/TT/E0 From:Whisenhunt investments Me. Tum Carpenter Marek 10, 2009 Page 2 501 687 9401 03111/2009 14:04 #036 P.003l003 It is further noted that the date of July 1, 2009 is a date which was voluntarily provided and agreed to by my clients. My clients note that they are not responsible for "acts of God", including inclement weather conditions, nor actions of others such as the relocation of utilities by applicable utility companies. Joe and Margaret Whisenhunt commit to completion by July 1, 1009. However, should the "acts of God" or the actions of public utilities prevent the Whisenhunt's performance, the Whisenhunts will immediately advise you of the matters delaying their performance and request an extension of the July 1, 2009 elate. Such extension, if any, shall be at the sole discretion of the City of Little Rock; however, such extension shall not be unreasonably withheld. Please note my clients are very proud to be a part of making these public improvements to the City of Little Rock, As you may be aware, my clients have taken their responsibilities very seriously and, on numerous occasions, made decisions regarding the improvements, which exceed the requirements placed upon them per the above referenced ordinances. They currently have expended in excess of 7.5 million dollars on the public improvements and the remaining public improvements, not involving Kirk Road, separately, will exceed this amount. The City of Little hock's interest in the safety of its citizens will be well served by these public improvements_ If this letter correctly states the agreement made this morning in your office, please acknowledge below. RCDAs cc: Doug Robertson Vrry truly you Richard C. Downing APPROVED: CITY OF LITTLE ROCK By: flak: Tom Carpenter, City Attorney b0/b0 39vd AiiV AiI0 5L9VUCT09 99:bt 600Z/ZZ/E0 RICHARD C. DOWNING, P.A. A Professional Corporation ATTORnY AT LAW $0 W. TWO Street P.O. $6t 3585, LITTLE ROCK, ARKANSAS 72203 T-kLEPHONE. 501/372-2066 FAX: 501/376;6420 E-MAIL: rc ownina@downing-law-com March 10, 2009 Mr. Tom Carpenter City Attorney 310 City Hall 500 West Markham Little Rock, AR 72201 OF COUNSEL: JAMES 2& HOUSE, P.A. VIA MAIL AND E-MAIL Re:' :Joe and Margaret Whisenhunt/Kirk. Road DcaiTbm" t _ - - ��: _..',. �:4^". ;: �; ... .. _�_ � ;zti= Please allow -this letter to reference YOUP:March_, 6;_ 2009 letter and- 0 ur, meeting I 'of March - i0, 2005. In your letter, you ekpressed the- City .d.lattle Rack's concern regarding the - si construction of the improvements to Kirk Road. In particular,- whether or not.m.y�client" foe . . an'd. Margaret Whisenhunt, have performed per -the requirements of LROs 1.9,.5 5 8, 1956O.and 19,56 1 You also reference a June 6, 2006 letter from Mr. Doug Robertson who is my clients' authorized representative. Tom, as you know, my clients be1iove thc�y.,,have acted. at all, firnq in - accq�dance with the above referenced ordinances. Fora- variety of reasons, most of -:which you, the stad And my clients' representatives have previously articulated, the improvements have not -been: completed ompleted as soon as was originally anticipated. My clients are willing 'to state, without any admission they have not complied with the above referenced ordinances, the public improvements to Kirk. Road .north pf Chenal Parkw4y . _. ; : Will be completed no later than -July 1, 2009. For purposesof4his letter,. completion shal).mean the date the-, Cityof-Littl-6.R6ck Public Work states., to in �cl i�ts,,,thQ.-imprc)v.einent-shavebeeh substantially completed. This statement shall be -made in writing to. my clients by 6 City' f .itf16, Rock . ,-Pub . lie Works. 'If such substantial completion has not occurred by July 1, 20091 then Joe and Margaret Whis.enhunt shall be liable, to the City of Little Rock, for the agreed upon liquidated damage sum of $ 100.00 per day, 4fter July uly L'2009 -OT such date subsequently agreed by the City of Little Rock, until the-date'of substantial compl6tion shall occur. Mr. Tom Carpenter March 10, 2009 Page 2 It is further noted that the date of July 1, 2009 is a date wfor - and agreed to by my clients. My clients note that they are not ible far "acts of including inclement weather conditions, nor actions of others such ri4 ti. applicable utility companies. Joe and Margaret Whisenhunt co ❑completion Ji s' 2009. However, should the "acts of God" or the actions pu 1c Whisenhunt's performance, the Whisenhunts will immediate - e matter delaying their performance and request an- extension of the July 1, 2009 date. Suc any, shall be at the sole discretion of the City of Little Rock; however, such extension shall not r,.Withbeld. Please note my clients are very proud to be a part of making these public improvements to the City of Little Rock. As you may be aware, my clients have taken their responsibilities very seriously and, on numerous occasions, made decisions regarding the improvements, which exceed the requirements placed upon them per the above referenced ordinances. They currently have expended in excess of 7.5 million dollars on the public improvements and the remaining public improvements, not involving Kirk Road, separately, will exceed this amount. The City of Little Rock's interest in the safety of its citizens will be well served by these public improvements. Il this letter correctly states the agreement made this morning in your office, please acknowledge below. cc: Doug- Robertson X5D Richard C. Downing CITY OF LITTLE ROCK Date: Tom Carpenter, City Attorney Page 1 of 1 James, Donna From: Jeff Yates [JYates@irwinpartners.com] Sent: Thursday, March 05, 2009 1:44 PM To: Carney, Dana; Bozynski, Tony; James, Donna Subject: FW: Kirk Road Same as previous note. From: Charles W. Logan [mailto:logan@arkansasurology.com] Sent: Thursday, March 05, 2009 10:50 AM To: Mike Davidson Cc: 'John Denny'; lee@smilearkansas.com; pcoffield@deta-trust.com; 'Michael Keck'; 'Hood, Mike'; Jeff Yates Subject: Re: Kirk Road I am the owner of the property where mike davidson runs his auto repair business and we are very unhappy with the efforts to complete the kirk road shackelford-150 project related to the construction of the Fellowship BIBLE CHURCH - and adjoining property --we strongly encourage the city of little rock to take an aggressive approach with the contractors and developers of this project—please finish the kirk road project without further delay --we have been surving by the hardist with all the dust and mud for well over a year ---CHARLES W LOGAN MD 3/5/2009 Page 1 of 1 James, Donna From: Jeff Yates [JYates@irwinpartners .com] Sent: Thursday, March 05, 2009 1:43 PM To: Carney, Dana; James, Donna; Bozynski, Tony Subject: FW: Kirk Road Tony, Dana & Donna: I am passing along this note regarding Kirk Road. I believe it is self-explanatory. Thanks, Jeff Yates From: Mike Davidson [mailto:miked@parkway-automotive.com] Sent: Thursday, March 05, 2009 10:10 AM To: clogan@arkansasurology.com; 'John Denny'; lee@smilearkansas.com; pcoffield@deta-trust.com Cc: 'Michael Keck'; 'Hood, Mike'; Jeff Yates Subject: Kirk Road I want to write to you and ask you to join me in keeping the development of Kirk Road in the minds of our City Board. As you know Kirk Road was scheduled to be completed May of 2008. It was extended to November of 2008. Neither of these deadlines has been met. The City Attorney recently sent a letter of enforcement to the developer. Their reply I have attached for your reading. It seems they are giving more of the same. In their reply they indicate that the road will be completed by the end of April. Based on past performance and the current condition of the road, eight weeks is less than realistic. We all understand the importance of development and progress. We also understand there is usually some short term negative impact that results in long term positive gain for a retail business. However, the project has taken entirely too long. The negative impact has taken its toll on my business in ways that cannot be measured. Access to Dr Wyant's office and Delta Banat has been limited along with huge holes in their property. And for the past two years there have only been two men working consistently on the project, hardly enough to get it done in a timely manner. 1 am requesting that the city Board levy fines on the developer if deadlines are not met. At the very least the granting of the PDC extension should be denied until the road is completed. Please join me in making our voice heard by the people who need to hear. If you know any city board members please contact them. Contact the Mayor, Mike Hood the city engineer and Michael Keck who is an elected official over this ward. I have cc this letter to Mike hood, Michael Keck and Jeff Yates. Mike Davidson 501-821-6111 Parkway Automotive Services www. arp kwayai,tom veve.net 3/5/2009 Pagel of 2 James, Donna From: Bozynski, Tony Sent: Saturday, February 28, 2009 8:02 AM To: James, Donna; Carney, Dana Subject: FW: Shackleford 150 ma -----Original Message ----- From: Jeff Yates[mailto:JYates@irwinpartners.com] Sent: Friday, February 27, 2009 7:10 PM To: Hood, Mike Cc: Bozynski, Tony; mkeck@stvincenthealth.com Subject: RE: Shackleford 150 Mike, It may just be me, but if the utility companies share in the delay OR are being blamed for the delay (either way) seems like they really ought to be quizzed as to what their roles are and what they are or will be doing to cooperate. Perhaps Mr. Bozynski, Mr. Beck or Mr. Moore would like to invite all the utility companies to attend the Planning Commission Public Hearing on the Shackleford application. I am positive I would have some questions for each of the utilities to answer. The responses from the utilities would be very relevant and likely to affect my decision on the applicant's request. Thanks, Jeff Yates From: Hood, Mike [mailto:Mhood@littlerock.org] Sent: Fri 2/27/2009 4:16 PM To: Mike Davidson Cc: Jeff Yates Subject: FW: Shackleford 150 Mike, I wanted to update you on this. After review of the record by the City Attorney's office, 1 sent out a Notice of Violation to the developer. Attached is the response from the engineering firm. According to this schedule, Kirk Road will be done at the end of March followed immediately with work on Chenal. Once again, I think it may be overly optimistic, but I could be proven wrong. sent this on to the City Attorney's office for their evaluation. I have been told by Planning that they may need to appear betore the Planning Commission for an extension to their PCD since none of the property outside the Fellowship site has developed. That may do more to get the job underway than issuing a citation for a misdemeanor offence. Anyway, I'll send an update when I have something to report. From: Gaila Adcock [mailto:gailaa@dci-Ir.com] Sent: Thursday, February 26, 2009 5:09 PM To: Hood, Mike Subject: Shackleford 150 3/2/2009 Page 2 of 2 From: DCI [mailto:copier@dci-Ir.com] Sent: Thursday, February 26, 2009 5:13 PM To: Gaila Adcock Subject: Attached Image 3/2/2009 Page 1 of 1 James, Donna From: Mann, Bill Sent: Saturday, February 28, 2009 12:25 PM To: Hood, Mike; Beck, Steve; Loe, Ronny; Floriani, Vince; Hall, Mel; Dawson, Cindy; Carpenter, Tom Cc: Bozynski, Tony; James, Donna Subject: RE: Shackleford 150 Tom - This is the matter Director Keck has questioned you about. Attached to Mike Hood's e-mail is the response of Whisenhunt's engineers to the notice of violation that was sent. In addition, Donna James notified us on February 20 that the Whisenhunts are requesting an extension of the deadline to submit the final plan for the conceptual planned developments. In her e-mail, that I forwarded you on February 20, she notes that the request is to go before the Planning Commission on March I9. The agenda goes out one week before and must be to the print shop by March 10. She has asked what staffs position will be on the request so that it can be included in the write-up. If management is inclined to seek revocation of the approval for the developments, we need to know. Since this has reached the level of Director Keck, do you think it is appropriate to meet with Bruce and see how he wants to go. As I see it, there is nothing left to do until we know how management wants to proceed. Maybe if the Whisenhunts are informed that management intends to seek revocation as a remedy, they might speed up the work. Please let us know how you think we should proceed on this. Bill William C. Mann, III Chief Deputy City Attorney City of Little Rock 500 West Markham, Ste. 310 Little Rock, Arkansas 72201 Tel. (501) 371-4815 3/2/2009 I:)E VE LOPMENT CONSULTANTS INCORPORATED February 26, 2009 Mr. Mike Hood City of Little Rock Engineering Division 701 West Markham Little Rock, Arkansas 72201 RE: Shackleford 150 Dear Mike: This letter is in response to the "Notice of Violation" previously sent by your office. The response is to let you know where the project stands and how it will be completed. As you know the roundabout went through some design modifications and while these were being prepared our contractors moved offsite to do other work. Those modifications are complete and between weather and getting our contractors remobilized the work has started again. Drainage adjustments have been completed to allow for the modifications and our dirt contractor has started with the grade changes as well. As soon as that work is complete curb & gutter will be installed along with the paving. Those subcontractors are waiting to perform right now. We anticipate having road work complete north, east and west of the roundabout by the end of March. The remainder of the work south to Chenal should be completed by the end of April provided that Entergy relocates their poles in a timely manner. That work still has not been done. Landscaping is progressing and would be completed shortly after those dates, Concerning the improvement plans for Chenal and Kanis the only item staff had to modify from the plans submitted was the use of the "Type A" inlet, which we removed from the plans as requested. I was not aware that anything else was required at this time, but I will forward the plans to you with the inlets removed. We are in the process of obtaining the R.O.W from an adjacent owner in order to build the Kanis improvements. There are some utility adjustments required for this work and we are proceeding with trying to get those adjustments completed. As soon as the utilities have been adjusted we will move forward with contractors to build the improvements. If there are any other questions, please feel free to contact me. Sincerely, Development Consultants, Inc. Mark L. Wright ' Oresident G:2006\06-115\co nstructio n\06115a. doc Engineering e Planning • band Surveying 0 1, uulscape Architecture 2200 North Rodney Parham Road, Suite 220 ° Little Rock, Arkansas 72212 0 Telephone 501.221.7880 - Fax 501.-221.7882 509 West :Sprint; Strect, Suite. 135 ° Fayetteville, Arkansas 72701 1 'T'elephone 4794.54.7SSO - Fax 479.2:51.8,210 DEVELOPMENT CONSULTANTS INCORPORATED February 12, 2009 Ms. Donna James City of Little Rock Planning and Development Division 723 West Markham Street Little Rock, Arkansas 72201 RE: Shackleford Farms PZD Ordinance Extensions DCI Project #06-115 Dear Donna: Please accept this letter as our written request for a two year extension of time for the following PZD ordinances: 1. Ordinance No. 19, 558 titled Shackeford Farms 30.8 Acres Long -Form PCD (Z- 5617 -A). 2. Ordinance No.19, 560 titled Shackleford Farms Long -Form POD (Z -4804-F). 3. Ordinance No. 19, 561 titled Shackleford Farms Long —Form PCD (Z -4807-G). Please contact my office if you have any questions or require additional information. Sincerely, Consultants, Inc. Robed W. Brown Vice -President Cc: Doug Robertson Kemp Whisenhunt G:2006\06 -115\P Ian ning\Documents\06-115v.doc Engineering Planning e Land Surveying Landscape Architecture 2200 North Rodney Parham Road, Suite 220 • Little Rock, Arkansas 72212 • Telephone 501-221-7880 • Fax 501-221-7882 509 West Spring Street, Suite 135 • Fayetteville, Arkansas 72701 • Telephone 479-444-7880 • Fax 479-251.8210 City of Little Rock Department of Planning and Development Planning 723 W'5' s t Zoning and lime RoMr P?OP1 JAL1C HEARING BEFORE THE LITTLE ROCK Pho p.. A?�NJWaC�I�ai�7A6REQUEST FOR A USE CHANGE Subdivision OR DEVELOPMENT OF LAND DATE: FebruM 10 2009 TO: Coalition of West Little Rock ATTENTION: Mary Domhoffer ADDRESS: 6916 Westridjae Road Roland AR 72135 REQUEST: Shackleford Farms 30.8 Acres Long -form PCD Time Extension Z -5617- A a request for an extension of time for an approved Planned Commercial Development to allow two additional years to the current approval for submission of the final development plan _ GENERAL LOCATION OR ADDRESS: located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center OWNED BY/APPLICANT: Wisenhunt's — Robert Brown DIC Agent NOTICE IS HEREBY GIVEN THAT an application for a Planned Zoning Develo nneiit of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L.R. Planning Commission in the Board of Directors Chamber, second floor, City Hall, on March 19, 2009at 4:00 P.M. This notice is provided in order to assure that neighborhood associations are aware of issues that may affect their neighborhood. Information requests should be directed to the Planning staff at 371-4790. Tony Bozynski Director of Planning and Development taCity of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision i'hane: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 January 9, 2009 Mr. Lance Hines 409 Wellington Woods Loop Little Rock, AR 72223 Dear Citizen: On behalf of the Little Rock Planning Commission, I would like to thank you for your participation in the June 11, 2009, Commission meeting. It is very important to the City staff and the Planning Commission to have citizen input in the planning decision-making process. *Shackleford Farms 30.8 Acres Long -form PCD Time Extension, (Z -5617-A) located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center, *Shackleford Farms Long -form POD Time Extension (Z -4807-F), located North of Wellington Hills Road and West of the Villages of Wellington Subdivision, *Shackleford Farms Long -form PCD Time Extension (Z- 4807 -G), located South of Wellington Hills Road and East of Kirk Road was deferred by the Commission to their July 23, 2009, public hearing. For additional information, you can contact the Planning staff at 371-4790. Staff responsibilities are as follows: Conditional and Tower Use Permits — Dana Carney Future Land Use Plan Amendments — Walter Malone Rezoning and Zoning Variance — Monte Moore Subdivision and Planned Unit Developments — Donna James Thank you again for your input. Sincerely, Tony Bozynski Secretary to Little Rock Planning Commission City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371.4790 Fax: (501) 399-3435 or 371-6663 January 9, 2009 Mr. Mike Davidson 708 Kirk Road Little Rock, AR 72223 Dear Citizen: On behalf of the Little Rock Planning Commission, I would like to thank you for your participation in the June 11, 2009, Commission meeting. It is very important to the City staff and the Planning Commission to have citizen input in the planning decision-making process. *Shackleford Farms 30.8 Acres Long -form PCD Time Extension, (Z -5617-A) located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center, *Shackleford Farms Long -form POD Time Extension (Z -4807-F), located North of Wellington Hills Road and West of the Villages of Wellington Subdivision, *Shackleford Farms Long -form PCD Time Extension (Z- 4807 -G), located South of Wellington Hills Road and East of Kirk Road was deferred by the Commission to their July 23, 2009, public hearing. For additional information, you can contact the Planning staff at 371-4790. Staff responsibilities are as follows: Conditional and Tower Use Permits — Dana Carney Future Land Use Plan Amendments — Walter Malone Rezoning and Zoning Variance — Monte Moore Subdivision and Planned Unit Developments — Donna James Thank you again for your input. Sincerely, Tony Bozynski Secretary to Little Rock Planning Commission City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 January 9, 2009 Mr. John Denny Fellowship Bible Church 1401 Kirk Road Little Rock, AR 72223 Dear Citizen: On behalf of the Little Rock Planning Commission, I would like to thank you for your participation in the June 11, 2009, Commission meeting. It is very important to the City staff and the Planning Commission to have citizen input in the planning decision-making process. *Shackleford Farms 30.8 Acres Long -form PCD Time Extension, (Z -5617-A) located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center, *Shackleford Farms Long -form POD Time Extension (Z -4807-F), located North of Wellington Hills Road and West of the Villages of Wellington Subdivision, *Shackleford Farms Long -form PCD Time Extension (Z- 4807 -G), located South of Wellington Hills Road and East of Kirk Road was deferred by the Commission to their July 23, 2009, public hearing. For additional information, you can contact the Planning staff at 371-4790. Staff responsibilities are as follows: Conditional and Tower Use Permits — Dana Carney Future Land Use Plan Amendments — Walter Malone Rezoning and Zoning Variance — Monte Moore Subdivision and Planned Unit Developments — Donna James Thank you again for your input. Sincerely, Tony Bozynski Secretary to Little Rock Planning Commission NOTICE OF PUBLIC HEARING BEFORE THE LI'TTLE'ROCK PLANNING COMMISSION ON A REQUEST FOR A REZONING THROUGH A PLANNED DEVELOPMENT TO ALL RESIDENTS IN THE VICINITY OF THE PROPERTY AT: GENERAL LOCATION OR ADDRESS: located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center OWNED BY/APPLICANT: Wisenhunt's —Robert Brown. DIC Agent REQUEST: Shackleford Farms 30.8 Acres Long -form PCD Time Extension Z -5617-A a request for an extension of time for an M12roved Planned Commercial Development to allow two additional ears to the current approval for submission of the final development plan. NOTICE IS HEREBY GIVEN THAT an application for Planned Zonin Develo meat of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L. R. Planning Commission in the Board of Directors Chamber, 500 West Markham Street, second floor, City Hall, on March 19 2009 at 4:00 P.M. This notice is provided in order to assure that area residents are aware of issues that may affect their neighborhood. Information requests should be directed to the Planning Staff (Donna James) at 371-4790. NOTICE OF PUBLIC HEARING BEFORE THE LITTLE ROCK PLANNING COMMISSION ON A REQUEST FOR A REZONING THROUGH A PLANNED DEVELOPMENT TO ALL RESIDENTS IN THE VICINITY OF THE PROPERTY AT: GENERAL LOCATION OR ADDRESS: located South of Kanis Road and Chenal Parkway and West of the existing Kroger Shopping Center OWNED BY/APPLICANT: Wisenhunt's — Robert Brown DIC Agent REQUEST: Shackleford Farms 30.8 Acres Long -form PCD Time Extension Z -5617-A a r uest for an extension of time for an ApRroved Planned Commercial Development to allow two additional years to the current a roval for submission of the final development plan. NOTICE IS HEREBY GIVEN THAT an application for Planned Zoning Development of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L. R. Planning Commission in the Board of Directors Chamber, 500 West Markham Street, second floor, City Hall, on March 19 2409 at 4:00 P.M. This notice is provided in order to assure that area residents are aware of issues that may affect their neighborhood. Information requests should be directed to the Planning Staff (Donna James) at 371-4790. BPADD_UNI VANITY ADDRESS UNIT ZIPCITY STATE ZIP Z -5617-A Chenal Dentistry 16524 CHENAL PKY LITTLE ROCK AR 72223 Z -5617-A Delta Trust Investments 16600 CHENAL PKY LITTLE ROCK AR 72223 Z -5617-A M & G Pizza Enterprises 17200 KANIS RD LITTLE ROCK AR 72223 Z -5617-A Rivercity Energy 16800 CHENAL PKY LITTLE ROCK AR 72223 Z -5617-A Xtreme Pizza Inc 17200 KANIS RD LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 17200 KANIS RD LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 17205 KANIS RD LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 17201 KANIS RD LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 16601 CHENAL PKY LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 17301 KANIS RD LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 16111 CHENAL PKY LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 15 EDSWOOD CT LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 16810 CHENAL PKY LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 16820 CHENAL PKY LITTLE ROCK AR 72223 Z -5617-A OCCUPANT 16900 CHENAL PKY LITTLE ROCK AR 72223