Loading...
Z-5561 Map 2JJ, • Wk(� GI-rA112� GU R.PJ G U -r Tv MEAT Grr;( ktwIREM�JT 00 T s' SL jQ . i -p' 0p Ir 0• 1—► -.1- wa r-.� I ,..... • i ,� r I U W _-)"N 1 -11 V, ARKANSAS STATE HIGHWAY #10 C4NP euR7 GUT 'TD mter Grl"r (ZFAul P%M bNT PSE URSE 14PACTED IB -BASE No' to e� \Alk_ +- 64� P_ _uFRP2 car 7o MP.Cr u?l' "LAJ12 -16 G.J. Slollo� �YY 41 6OW6, WAS `MI (oKls 10/IoWWM LA. -Ave, CT Picr.� PP,�EME�.1T A I ?Z err N nu !c*� 45, t evt, OC ErrSl DI ala ITE KEYED NOTES 1. Remove existing curb and gutter. 2. Remove existing walk. 3. Remove concrete islands and drive. 4. Remove existing buildings. 5. Existing vaulty to remain. 6. Existing curb and gutter. 7. New concrete curb and gutter. 8. New concrete walk. 9. New concrete drive and islands. , 10. New 4" painted parking stripes. 11. Light standard (Refer to electrical). 12. Handicapped symbol. 13. Handicapped ramp. 14, NSW AqHA'1-T Tkry AREA, rAT6-H To �1ATGH W 4f, AG-eA PIIfTy "Ic;,T PHALT IS• L.U. PA42 P�( GIrIJegAL- GONTI�T� I(o. geFr love, EXIcinw6 1j2EE., Toi-�2 A Wei, *; .F SMEIM W -Z .CAP — 60U_A�L Flu= PAMW AS BC D *I rE it MVIOLM --- FILLEK (ALL A TOUND) 00W.r-4M WALK GIC rgN/EMEN'( 3T F�Ofl�Cs ftR ft"T - - - - i DIA. o _ LL�712 1'� 3 SITE-' PIAN C.? 1 C.3 TF.MP0R:%RY SI I I A.I / 1 2 0 To M 3r` ROOF PLAN y*_S Fi- OW coNwrr a►awe eA.ce 3 SITE-' PIAN C.? 1 C.3 TF.MP0R:%RY SI I I A.I / 1 2 3 5 1 11 7 A 1 cc++cu�ra aY! f >Drzri ca+o 10. NXJ e1w,;. - �� 4li7tro_ — .. 4 c C.1 SITE-' PIAN C.? SURN'FY C.3 TF.MP0R:%RY SI I I A.I FLOOR PLAN 1 N 0 RI'FI ECTED CFII ING M AN 5 1 11 7 A 1 cc++cu�ra aY! f >Drzri ca+o 10. NXJ e1w,;. - �� 4li7tro_ — .. 4 c C.1 SITE-' PIAN C.? SURN'FY C.3 TF.MP0R:%RY SI I I A.I FLOOR PLAN A._' ELEVATIONS & SF( -LIONS 0 RI'FI ECTED CFII ING M AN ROOF PLAN A.4 ;NII I WORK A.i P.ALL. SECTIONS A.6 %ITS(' DF [AILS S.I FOUNDAIION PIAIN & DFIAILS S.? ROOF FRAM ING s OF I III S MEP. I SIFL L'TILITI PIAN M I MECIIANICAI PLAN f.1)_1 PI U%IRING PLAN E.I LIGIIIING PLAN E.? PO\\'FR PLAN Remove asphalt drive as required for installation of new concrete islands, drive, and curb and gutter. Patch and repair areas where required after demolition and new installation. New floor elevation to match existing vault floor elevation. Wheelchair curb cuts and ramp shall conform to local ordinances. Contact all utility companies prior to construction and schedule interruptions in service to allow the existing facility to remain in operation during normal business hours. Establish positive surface drainage before beginning construction and maintain positive surface drainage during construction. Provide a level drive surface area 8'-0" x 14'-0" at each of the following locations: the drive -up tel'er window, each automatic teller machine, and the after hour deposit chest. This is to allow for proper height from tie customer car window to the equipment See bank equipment drawings for the actial heights and locations of the various equipment. Dimensions a^e to the face of the curb. Boundary and topography information taken from the survey included in this set of drawings and marked "FOR INFORMATION ONLY". Contractor shall verify existing building locations, site dimensions, elevations, and available utilities prior to beginning construction. f2XToH 6A,l rIKJ61 APH�-F wlTu uEW nhP+lTv To MAcTGI.1 E.xw 1041 AT �Es�6 WXUgrbW P,r( �iut K,'A PiI,FiL, Cv�I r)U I T A.ta11l'�;1 VAWt'. PXJKt"� i NiAtJR1� 6PhTIN(,1 2 Tv HAMOH nr4A1. 012 MW1e?H 4760B� OP PA-tbMEI.)Tj sWALee;1 CR• SII�FiWhLI�J, D[ DlHic11 D 1 OUIPMI_N I D? DI1-601 U LOCIPMI-\ L 1) 3 DIER(_)I D 1:01L 111%11-N 1 1)4 DII14C)l1)LOILIPMENI D.i DIFROLD 1'111 IP1,11 N I 7Me1t;Awodol�s ArWbah" F1•nabu S23 36UM chum JenMbr . Arkwws (301) 332-4271 Far 932-0374 124 WM1 C pNW S•1M 1000 unl. Mock, Arleen (301) 370-0031 Far 978-0413 REGISTERED ARCHnECTS N0. C-6 X044 NO 1826 ISSUE DATE: 1-15-92 C L. Q = Q .N U ,+- O z _ Q C �M/-�� M W O (n v O _y �0 Z U _y 0 � X o .- C 0 _J REGISTERED ARCHnECTS N0. C-6 X044 NO 1826 ISSUE DATE: 1-15-92 C Q .N C•1