Z-5561 Map 2JJ,
•
Wk(� GI-rA112�
GU R.PJ G U -r Tv
MEAT Grr;( ktwIREM�JT
00
T
s'
SL jQ . i -p' 0p
Ir 0•
1—► -.1- wa r-.� I ,..... • i ,� r I U W _-)"N 1 -11 V,
ARKANSAS STATE HIGHWAY #10
C4NP euR7
GUT 'TD mter Grl"r
(ZFAul P%M bNT
PSE
URSE
14PACTED
IB -BASE
No' to e�
\Alk_ +- 64� P_ _uFRP2 car
7o MP.Cr u?l' "LAJ12 -16
G.J. Slollo�
�YY
41 6OW6, WAS `MI
(oKls 10/IoWWM
LA. -Ave, CT Picr.�
PP,�EME�.1T
A I ?Z err
N nu !c*� 45, t evt,
OC ErrSl DI ala
ITE KEYED NOTES
1. Remove existing curb and gutter.
2. Remove existing walk.
3. Remove concrete islands and drive.
4. Remove existing buildings.
5. Existing vaulty to remain.
6. Existing curb and gutter.
7. New concrete curb and gutter.
8. New concrete walk.
9. New concrete drive and islands.
,
10. New 4" painted parking stripes.
11. Light standard
(Refer to electrical).
12. Handicapped symbol.
13. Handicapped ramp.
14, NSW AqHA'1-T Tkry AREA, rAT6-H To �1ATGH
W 4f, AG-eA PIIfTy "Ic;,T PHALT
IS• L.U. PA42 P�( GIrIJegAL- GONTI�T�
I(o. geFr love, EXIcinw6 1j2EE., Toi-�2 A Wei,
*; .F SMEIM W -Z .CAP —
60U_A�L Flu=
PAMW AS BC D
*I rE it MVIOLM ---
FILLEK (ALL A TOUND)
00W.r-4M WALK
GIC rgN/EMEN'(
3T
F�Ofl�Cs ftR ft"T - -
-
-
i DIA.
o _ LL�712 1'�
3
SITE-' PIAN
C.?
1
C.3
TF.MP0R:%RY SI I I
A.I
/
1
2
0
To M
3r`
ROOF PLAN
y*_S
Fi-
OW coNwrr
a►awe eA.ce
3
SITE-' PIAN
C.?
1
C.3
TF.MP0R:%RY SI I I
A.I
/
1
2
3
5
1
11
7
A
1
cc++cu�ra aY!
f
>Drzri ca+o
10.
NXJ
e1w,;.
-
��
4li7tro_ — .. 4
c
C.1
SITE-' PIAN
C.?
SURN'FY
C.3
TF.MP0R:%RY SI I I
A.I
FLOOR PLAN
1
N
0
RI'FI ECTED CFII ING M AN
5
1
11
7
A
1
cc++cu�ra aY!
f
>Drzri ca+o
10.
NXJ
e1w,;.
-
��
4li7tro_ — .. 4
c
C.1
SITE-' PIAN
C.?
SURN'FY
C.3
TF.MP0R:%RY SI I I
A.I
FLOOR PLAN
A._'
ELEVATIONS & SF( -LIONS
0
RI'FI ECTED CFII ING M AN
ROOF PLAN
A.4
;NII I WORK
A.i
P.ALL. SECTIONS
A.6
%ITS(' DF [AILS
S.I
FOUNDAIION PIAIN & DFIAILS
S.?
ROOF FRAM ING s OF I III S
MEP. I
SIFL L'TILITI PIAN
M I
MECIIANICAI PLAN
f.1)_1
PI U%IRING PLAN
E.I
LIGIIIING PLAN
E.?
PO\\'FR PLAN
Remove asphalt drive as required for
installation of new concrete islands,
drive, and curb and gutter. Patch and
repair areas where required after
demolition and new installation.
New floor elevation to match existing
vault floor elevation.
Wheelchair curb cuts and ramp shall
conform to local ordinances.
Contact all utility companies prior to
construction and schedule interruptions
in service to allow the existing facility
to remain in operation during normal
business hours.
Establish positive surface drainage
before beginning construction and
maintain positive surface drainage during
construction.
Provide a level drive surface area 8'-0"
x 14'-0" at each of the following
locations: the drive -up tel'er window,
each automatic teller machine, and the
after hour deposit chest. This is to
allow for proper height from tie customer
car window to the equipment See bank
equipment drawings for the actial heights
and locations of the various equipment.
Dimensions a^e to the face of the
curb.
Boundary and topography information
taken from the survey included in this
set of drawings and marked "FOR
INFORMATION ONLY".
Contractor shall verify existing building
locations, site dimensions, elevations,
and available utilities prior to
beginning construction.
f2XToH 6A,l rIKJ61 APH�-F wlTu uEW nhP+lTv To
MAcTGI.1 E.xw 1041 AT �Es�6 WXUgrbW P,r( �iut K,'A
PiI,FiL, Cv�I r)U I T
A.ta11l'�;1 VAWt'. PXJKt"� i NiAtJR1� 6PhTIN(,1 2 Tv
HAMOH nr4A1. 012 MW1e?H 4760B� OP PA-tbMEI.)Tj
sWALee;1 CR• SII�FiWhLI�J,
D[ DlHic11 D 1 OUIPMI_N I
D? DI1-601 U LOCIPMI-\ L
1) 3 DIER(_)I D 1:01L 111%11-N 1
1)4 DII14C)l1)LOILIPMENI
D.i DIFROLD 1'111 IP1,11 N I
7Me1t;Awodol�s
ArWbah"
F1•nabu
S23 36UM chum
JenMbr . Arkwws
(301) 332-4271 Far 932-0374
124 WM1 C pNW S•1M 1000
unl. Mock, Arleen
(301) 370-0031 Far 978-0413
REGISTERED
ARCHnECTS
N0. C-6
X044 NO
1826
ISSUE DATE:
1-15-92
C
L.
Q
=
Q
.N
U
,+-
O
z
_
Q
C
�M/-��
M
W
O
(n
v
O
_y
�0
Z
U
_y
0
�
X
o
.-
C
0
_J
REGISTERED
ARCHnECTS
N0. C-6
X044 NO
1826
ISSUE DATE:
1-15-92
C
Q
.N
C•1