Loading...
Z-5534-B Map 834'-6 OF TRENCH DRAIN 50 L.F. OF 42" S.D. @ 0.1% (DETENTION BASIN) 8" TRENCH DRAIN OUTFALL NEW J.B. TOP ELEV. 566.00 INV. ELEV. 559.28 FL ELEV. 8" IN 562.25 T.W.567.00 T.W.568.50-' T.W.569.50 T.W.570.50 I NORMANDY ADDITION T.C.568.60�- 568.95 110 L.F. OF 42" 568.89 S.D. @ 0.1% (DETENTION BASIN) I' T.W.571.50I T.C.568.78��' 568.83 T.C.568.60 568.17 T.C.568.75- i! NEW C.I. I TOP ELEV. 567.50 INV. ELEV. 559.00 FL ELEV. 2-42" IN 559.17 T.W.571.50 T 30 L.F. OF 8" DUCTILE IRON @ 3.0% 180'± OF NEW 15" PUBLIC STORM DRAIN @ UNIFORM SLOPE TO OUTFALL TO DAYLIGHT ACROSS NORMANDY ST. NEW JUNCTION BOX TOP ELEV. 560.75 INV. ELEV. 555.00 E ELEV. 8" IN 558.10 TRANSITION CURB HEIGHT THRU RADIUS (TYP. ALONG R STREET) \-Vy IL--- -� -- 3' TRANSITION CURB HEIGHT (TYP. ALONG R STREET) NEW C.B. TOP ELEV. 567.33 INV. ELEV. 559.33 E T \� 2% CROSS 71.60 SLOPE 22 .:1-568.2: ••I��1► .. ��I .: • �Il�nBUILDING �1��1■A001.. • : • . 568.50 568. T.CV564 4 LOT 5 90 L.F. OF 42" S.D. @ 0.1% (DETENTION BASIN)- 2PUBLI A�LEY (UND VE QPED- 0 ��--{iR000H \AFFIL) ^ T.C.568.65 T.C.568.60 LOTS 2,3 4, NORMANDY ADDITION 5' WIDE AREA OF 2% MAX. CROSS SLOPE FOR HANDICAP ACCESS (TYP. ALONG DRIVE ENTRIES) �S, I T.C.573.00 I 15' TRANSITION CURB HEIGHT 2% CROSS SLOPE FROM NEW R -O -W TO BACK OF CURB \ I I W 31'-6 OF TRENCH DRAIN \ T.C.569.75 T.C.568.40 I I I GUTTER 568.15 I I ) I I _ T.W.571.50 569.90 T.C.569.35 ` 9 � UNIFORMLY TRANSITION CURB HEIGHT AS SHOWN LOT 1 8" TRENCH DRAIN OUTFALL NEW C.B. TOP ELEV. 567.75 INV. ELEV. 559.26 FL ELEV. 8" IN 564.25 NORTH SITE GRADING & DRAINAGE PLAN 20' 0' 20' 40' SCALE:1 "=20' LEGEND EXISTING GRADE CONTOUR 572- (1 FOOT INTERVAL) EXISTING GRADE CONTOUR --570- (5 FOOT INTERVAL) FINISHED GRADE CONTOUR -572- (1 FOOT INTERVAL) FINISHED GRADE CONTOUR -570- (5 FOOT INTERVAL) FINISHED SPOT ELEVATION (T.C.=TOP OF CURB; X/-T.C.572.00 T.W.=TOP OF WALL) NEW CURB INLET (C.I.) NEW CATCH BASIN (C,B.) NEW JUNCTION BOX (J.B.) UNIFORMLY TRANSITION 6"LENGTH 0" CURB HEIGHT 0" TO 6" THRU LENGTH INDICATED NOTES: 1. MAXIMUM GRADE SLOPE SHALL BE 3:1, MAXIMUM WALK CROSS SLOPE SHALL BE 2%. 2. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO EXCAVATING. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE. 3. CONTRACTOR SHALL SPREAD 4" TOPSOIL & INSTALL SOD & FERTILIZER ON ALL DISTURBED EARTH SURFACES RESULTING FROM THE CONTRACTOR'S OPERATIONS, UNLESS SHOWN OTHERWISE.