Loading...
Z-3862 Staff AnalysisJuly 13, 1982 SUBDIVISIONS Item No. 12 NAME: Parkway Village (PUD) LOCATION: North of Parkway Place Addition DEVELOPER: ENGINEER: Baptist Medical Systems Hodges Firm P.O. Box 7416 P.O. Box 7416 Little Rock, AR 72207 Little Rock, AR Phone: 664-5000 664-5000 AREA: 82.48+ acres NO. OF LOTS': 27 FT. OF NEW ST: 2,000' ZONING: "R-2" PROPOSED USES: Retirement Village STATEMENT OF DEVELOPMENT This plan was submitted for review as a "PUD" by the Baptist Medical System. It envisions construction of a wide range of facilities constituting a "comprehensive continuing care retirement community" for the aged. Design will be geared toward promoting "maximum personal independence" and catering to the unique residential and health care needs of this group. This is indicated by the array of uses proposed, which includes the subdivision of the eastern portion into 26 lots for single family, and construction of apartments, food preparation/dining facilities, laundry/recreation facilities, and nursing home/personal care unit. The project will be enhanced visually by the use of ponds, pedestrian walkways, and buffering. Rationale for the project is based upon a feasibility study recognized by the Baptist Medical System, which documented a need for comprehensive housing and care services for the elderly in the Little Rock area. The development and phasing program is based upon the research finding of the study. PROJECT CHARACTERISTICS I. QUANTITATIVE DATA A. Parcel Gross Area = 86.07 acres B. Aquaduct Right -of -Way = 3.59 acres July 13, 1982 SUBDIVISIONS Item No. 12 - Continued C. Retirement Housing Site Area = 77.57 acres D. Subdivision Area = 8.50 acres E. Power line Easement/Aquaduct = 9.93 acres (Retirement Housing Site) II. USES AND FLOOR AREA/BUILDING COVERAGE A. PHASE ONE Building No. of Floor Building Use Units Area Coverage 1. Independent Living Units: (a) One -bedroom 49 41,650 41,650 units at 850 sq. ft. ea. (b) 49 56,350 56,350 Two-bedroom units at 1150 sq. ft. ea. (c) Garages at 98 29,400 29,400 300 sq. ft. ea. (All single story) 2. Congregate Units: 5 200,000 66,667 *(a) Each building at 40,000 square feet contains one studio, nine one -bedroom and four two-bedroom apartments on each floor level. Three -stories high plus parking (3 buildings). 3. Common Facilities: 1 22,000 22,000 (a) Central Administration (b) Food Preparation/ Dining July 13, 1982 SUBDIVISIONS Item No. 12 - Continued Building No. of Floor Building Use Units Area Coverage (c) Garages at 115 34,500 34,500 300 square feet each - all single story 2. Congregate Units 1 40,000 13,333 (See Phase I -B) 3. Recreation Bldg. 1 2,500 2,500 Single Story TOTALS , 191,850 165,183 III. OPEN SPACE A. Single Family Lots (1) 1.17 acres - power line easement on north (2) private use of own property. B. Retirement Housing Area; (1) Private exterior space (patio/deck) adajcent to unit (2) Common enterior recreation area (swimming pool, etc.) (3) Other exterior uses as defined during final submissions. (4) General Open Space Schedule (a) Private Space - - - 0.78 acres (usable) (b) Common Space - - - 42.75 acres (usable) (c) Floodplain - Including pond - - - 14.28 acres (nonusable) development (d) Matural Area (undeveloped) - - - 10.46 acres (nonusable) Open Space TOTAL - - - 68.27 acres July 13, 1982 SUBDIVISIONS Item No. 12 - Continued Building No. of Floor Building Use Units Area Coverage (c) Laundry & Recreation Single Story TOTALS 349,400 216,067 B. PHASE TWO 1. Nursing Home/ 1 63,000 24,000 Personal Care Unit: , (a) 120 beds of nursing care (b) 50 rooms of personal care (c) Support services (3 buildings) TOTAL 63,000 24,000 C. PHASE THREE 1. Inde endent Living units: (a) 58 49,300 49,300 One -bedroom units at 850 square feet each (b) Two-bedroom 57 65,550 65,550 units at 1150 square feet each July 13, 1982 SUBDIVISIONS Item No. 12 - Continued SPECIAL FEATURES (1) Covered parking - provided for congregate housing units at a ratio of one space per three units under the building and for independent living units at a ratio of one space per unit as garages or carports. (2) Uncovered guest parking - one space per four dwelling units for independent dwelling units. (3) Use perimeter treatment to include use of existing natural vegetation and new vegetation where required. Fences aren't planned. (4) Time Schedule A, Phase I - Begin construction May 1983 - Units to be constructed at market absorption rate. Phase II - Begin construction in 1984, complete in 1985. Phase III - Begin construction in 1985, units to be constructed at market absorption rate. (5) Future Sellin or Leasin (a) Residents pay an entry fee for selected accommodations and assurance of access to higher levels of care within village. (b) Monthly charges to cover maintenance and housing/ recreation activity facilities, dining and housekeeping assistances. (c) Long-term health care benefits. (d) Sale of single family lots for home construction. SPECIAL REQUIREMENTS 1. Site considered according to the PUD concept must be 2.0 acres or greater. This plan complies. 2. A minimum of 10 percent of gross PRD areas shall be designated as landscaped open space. This plan complies. July 13, 1982 SUBDIVISIONS Item No. 12 --Continued 3. No more than one-half of the common usable open space may be covered by water. This plan complies. ENGINEERING CONSIDERATIONS Engineering does not object to Pride Valley Road not being extended northward to St. Charles Boulevard. Recommend that another north -south collector be located further west near the end of Rock Creek Parkway. Internal drainage plan has not been reviewed. Park Valley Road shall be constructed in comparison with the main access road. STAFF ANALYSIS There are several issues relative to this proposal. Foremost, the plat will necessitate amending the Master Street Plan, since a collector street, Pride Valley Road, is slated to go through the middle of the project and connect with St. Charles. Staff is suggesting that Parkway Place Drive be constructed as a collector and during the first phase in lieu of Pride Valley Road. Since Rock Creek runs through the middle of Parkway Place, the abutting street, the applicants have agreed with staff's suggestion that a bridge be constructed over the creek to the project entrance. According to the Master Parks Plan, an area proposed as Park 30F lies within the boundaries of this project. A waiver from the plan will be needed. At the time of this writing, staff was inhibited in the review of the site plan as to specifics, such as adequate parking, proper dimensions, etc. The applicant has been asked to submit a proper plan. Staff is also in the process of reviewing alternatives to the extension of the collector street. Waste Water indicates that an existing sewer interceptor is not shown in the plat, and a 20' easement is needed. STAFF RECOMMENDATION: Staff reserves comment until more details on Phase I are received. SUBDIVISION COMMITTEE_RECOMMENDATION: A lengthy discussion of this proposal was held, dealing primarily with the following: 1) Relocation of Pride Valley collector street. July 13, 1982 SUBDIVISIONS Item No. 12 - Continued 2) Provision of crossings on Rock Creek. 3) Phasing of the plan. 4) Inclusion of Parkway Place Drive in Phase #1. 5) Access needs of St. Charles Subdivision and adjacent owners. 6) Out -parcel owned by the City. The Committee determined by unanimous vote, 4 ayes, 0 noes, 1 absent, that it would endorse the plan concept and recommend same to the full Commission. The Committee requested staff and City Engineer meet with the developer's design people and resolve the following by the meeting on July 13th. 1) Future location of Pride Valley Extension. 2) Need for additional cross -overs of creek. 3) Need for St. Charles access by collector on east at this time. 4) City out -parcel. nr.AA1A1TAir_ r OMMTgSTr)W ArrPTOW! Staff reported on several issues: (1) Relocation of Pride Valley Road - Collector relocated from a central to a westward location which would tie into property into the north. A revised plan was submitted on this. (2) Provision of Crossing on Rock Creek/Collector Streets - App icant has proposed to build a bridge between two sides of Parkway Place. The new collector won't have a cross-over, at the developer's expense. (3) Phasing Plan - Significant because two collector streets proposed are deferred until plans for later development are finalized. Staff reported that some commitment as to dedication of right-of-way should be made. July 13, 1982 SUBDIVISIONS Item No. 12 - Continued (4) Inclusion of Parkway Place Drive Physical Improvements �n Phase I - St. Charles developers were opposed to His, since they would like the street constructed on demand when that phase of their subdivision is constructed. (5) Out -Parcel Located within Property - Negotiations going on Between W1nrock and the City that would probably involve some swapping of other land. Several persons spoke in regards to this item. The first was the architect, Dick Unruh, who presented the proposal to the Commission. Mr. Bill McMann from Water Works spoke next, and indicated that his purpose was to ensure protection of a 50' easement they owned within the proper* -y. Mr. Pat McGetrick, engineer for the project, assured Mr. McMann that they were aware of the easement and incorporated this knowledge into their design. Two neighboring property owners, Mrs. Thelma Dowell Barden and Mr. Don Lovett expressed concerns over the relocation of Pride Valley Drive. Mrs. Barden, owner of Lots 2, 3, 4 and 5, Block 59, Neimeyer Grove Addition, a landlocked parcel, felt that this was her opportunity to object to an action which would serve to further worsen her situation. She submitted a letter for the files to this effect. After some discussion, a motion was made to approve this item, subject to (1) the construction of Parkway Place Drive with Phase IV of this development or when the St. Charles plat is finaled; and (2) an agreement between this developer, the City and St. Charles providing for the sequencing of these improvements. The motion passed by a vote of 8 ayes, 0 noes, 3 absent.