Z-3808-B Staff AnalysisFILE NO.: Z-3
NAME: Davis Short -form PD -R
LOCATION: Located at 5210 Mabelvale Pike
EVELOPER:
Dino Davis
c/o Kwendeche
2124 Rice Street
Little Rock, AR 72202
SURVEYOR/ENGINEE
Harbor
5800 Evergreen
Little Rock, AR 72205
AREA: 1.907 acres NUMBER OF LOTS: 1
WARD: 2 PLANNING DISTRICT: 12 — 65th Street West
CURRENT ZONING
ALLOWED USE
PROPOSED ZONING
PROPOSED USE
FT. NEW STREET: 0 LF
CENSUS TRACT: 20.01
C-1, Neighborhood Commercial and R-2, Single-family
Retail and Single-family
PRD, Planned Residential Development
Multi -family
VARIANCE/WAIVERS: A variance from the Land Alteration Ordinance to allow grading
of future phases with the development of the first phase.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The property is intended to be developed by the Owner in Phase 1 with a new
wood framed, 2 -level apartment unit with 12 total units. Each floor will have four
(4) one -bedroom and two (2) studio units totaling 6,000 gross square feet for the
entire building. A total of 18 off street parking spaces on a paved area will be
provided and accessed by a new paved driveway from the existing drive apron at
Mabelvale Pike.
FILE NO.: Z -3808-B (Cont.
The exterior of the building is proposed wood framed apartment buildings. The
buildings are proposed brick up to a mid-level and EIFS on the upper floor walls.
New vinyl clad wood windows with clear insulated glass will be installed. The roof
will be asphalt architectural shingles on a combination of a hip roof with a gable
end intersecting on the entry side of the unit. The building is proposed to sit on a
flat reinforced concrete slab on a relatively flat portion of the existing site.
A future phase of the development plan includes the complete rehabilitation of the
existing residential house located on the site. The site will be used as a residence
or potentially an office use for the multi -family development.
Also included in a future phase is an additional 12 -unit apartment building with the
same design as the initial apartment buildings. Additional paved parking will be
added with this portion of the development.
The request includes a variance from the Land Alteration Ordinance to allow
grading of future phases with the development of the first phase.
B. EXISTING CONDITION
The site is located on Mabelvale Pike which is a four (4) lane street constructed
with curb, gutter and sidewalk. There is a single-family residence located on the
site along with an out -building. East of the site is a strip center which contains a
mixture of commercial uses including auto repair. Northeast of the site is an
apartment complex accessed from West 51St Street. North of the site, also
accessed from West 51St Street, there are single-family homes. South of the site,
across Mabelvale Pike, are single-family homes. Southeast is a vacant boarded
commercial building.
C. NEIGHBORHOOD COMMENTS:
All property owners located within 200 -feet of the site along with the Wakefield
Neighborhood Association and Southwest Little Rock United for Progress were
notified of the public hearing. There is not a contact listed for the Geyer Springs
Neighborhood Association in the City of Little Rock's neighborhood contact list.
D. ENGINEERING COMMENT
PUBLIC WORKS CONDITIONS:
1. Mabelvale Pike is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
2
2. Repair or replace any curb and gutter or sidewalk that is damaged in the public
right-of-way prior to occupancy. Remove old driveway curb cuts no longer
proposed to be used.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be required
prior to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved
prior to the start of construction. Is an advanced grading variance being
requested to grade Phase 2 with construction of Phase 1?
4. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan. Maintenance of the
detention pond and all private drainage improvements is the responsibility of
the developer and/or property owner.
5. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
6. Hauling of fill material on or off site over municipal streets and roads requires
approval prior to a grading permit being issued. Contact Public Works Traffic
Engineering, 621 South Broadway, Travis Herbner, therbner@Iittlerock. c�ov or
501.379.1805 for more information.
7. Damage to public and private property due to hauling operations or operation
of construction related equipment from a nearby construction site shall be
repaired by the responsible party prior to issuance of a certificate of occupancy.
8. Access to detention ponds must be provided to the public right-of-way and/or
access easement for future maintenance by the developer and/or owner.
E. Utilities/Fire Department/Parks/County Planning:
Little Rock Water Reclamation Authority: Sewer available to this site. Capacity
and fee analysis required. Contact Little Rock Water Reclamation Authority for
additional information.
Entergy: Entergy does not object to this proposal. There do not appear to be any
conflicts with existing electrical utilities based on the information provided. There
is an existing three phase power line running along the south side of Mabelvale
Pike in front of this property. Contact Entergy in advance to discuss electrical
service requirements, or adjustments to existing facilities (if any) as this project
proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
3
FILE NO.: Z -3808-B
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire Department
is required.
3. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate pressure
and fire protection.
4. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
5. Additional fire hydrant(s) will be required. Contact the Little Rock Fire
Department to obtain information regarding the required placement of the
hydrant(s) and contact Central Arkansas Water regarding procedures for
installation of the hydrant(s).
Fire Department:
Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations
as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
fire apparatus access road, the minimum road width shall be 26 feet, exclusive
of shoulders.
2. Grade. Maintain fire apparatus access roads as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus
access roads shall not exceed 10 percent in grade except as approved by the
fire chief.
3. Loading. Maintain fire apparatus access road design as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and
loading. Facilities, buildings or portions of buildings hereafter constructed shall
be accessible to fire department apparatus by way of an approved fire
apparatus access road with an asphalt, concrete or other approved driving
surface capable of supporting the imposed load of fire apparatus weighing at
least 75,000 pounds.
4. 30' Tall Buildings -Maintain aerial fire apparatus access roads as per Appendix
D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D105.1 — D105.4
a. D105.1 Where Required. Where the vertical distance between the
grade plane and the highest roof surface exceed 30', approved aerial
fire apparatus access roads shall be provided. For the purposes of
this section the highest roof surfaces shall be determined by
12
FILE NO.: Z -3808-B (Cont.)
measurement to the eave of a pitched roof, the intersection of a roof
to the exterior wall, or the top of the parapet walls, whichever is
greater.
b. D105.2 Width. Aerial fire apparatus access roads shall have a
minimum unobstructed with of 26', exclusive of shoulders, in the
immediate vicinity of the building or portion thereof.
c. D105.3 Proximity to building. At least one of the required access
routes meeting this condition shall be located within a minimum of 15
feet and a maximum of 30 feet from the building, and shall be
positioned parallel to one entire side of the building. The side of the
building on which the aerial fire apparatus access road is positioned
shall be approved by the fire code official.
d. D105.4 Obstructions. Overhead utility and power lines shall not be
located over the aerial fire apparatus access road or between the
aerial fire apparatus road and the building. Other obstructions shall
be permitted to be places with the approval of the fire code official.
5. Dead Ends. Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4
Dead Ends. Dead-end fire apparatus access roads in excess of
150 feet shall be provided with width and turnaround provisions in accordance
with Table D103.4. Requirements for Dead-end fire apparatus access roads.
6. Gates. Maintain fire apparatus access road gates as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus
access road gates. Gates securing the fire apparatus access roads shall
comply with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation
by one person.
4. Gate components shall be maintained in an operable condition at all
times and replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by
fire department personnel for emergency access. Emergency opening
devices shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and
padlock unless they are capable of being opened by means of forcible
entry tools or when a key box containing the keys to the lock is installed
at the gate location.
7. Locking device specifications shall be submitted for approval by the
fire code official
8. Electric gate operators, where provided, shall be listed in accordance
with UL 325.
FILE NO.: Z -3808-B (Cont.
9. Gates intended for automatic operation shall be designed, constructed
and installed to comply with requirements of ASTM F 2200.
10. Multi -family Residential Developments - As per Appendix D, Section
D106.1 of the 2012 Arkansas Fire Prevention Code Vol. 1. Projects
having more than 100 dwelling units. Multiple -family residential
projects having more than 100 dwelling units shall be equipped
throughout with two separate and approved fire apparatus access
roads.
a. Exception: Projects having up to 200 dwelling units may have
a single approved fire apparatus access road when all
building, including nonresidential occupancies are equipped
throughout with approved automatic sprinkler systems
installed in accordance with Section 903.3.1.1 or 903.3.1.2.
b. As per Appendix D, Section D106.2 of the 2012 Arkansas Fire
prevention Code Vol. 1. Projects having more than
200 dwelling units. Multiple -family residential projects having
more than 200 dwelling units shall be provided with two
separate and approved fire apparatus access roads
regardless of whether they are equipped with an approved
automatic sprinkler system.
7. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the
2012 Arkansas Fire Prevention Code. Section C101 — C105, in conjunction with
Central Arkansas Water (Jason Lowder 501.377.1245) and the
Little Rock Fire Marshal's Office (Capt. Tony Rhodes 501.918.3757 or
Capt. John Hogue 501.918.3754). Number and Distribution of Fire Hydrants as
per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
F. Building Codes/Landscape-
Building Code: Project is subject to full commercial plan review and approval prior
to issuance of a building permit. For information on submittal requirements and the
review process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crichey@littlerock.gov or
Mark Alderfer at 501.371.4875; malderfer littlerock. ov.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements
FILE NO.: Z -3808-B (Cont.
2. A land use buffer six (6) percent of the average width/depth of the lot will be
required when an adjacent property has a dissimilar use of a more restrictive
nature. The property to the north and west is zoned R-2, Single-family. The
maximum dimension required shall be fifty (50) feet. The minimum dimension
shall be one-half (Y2) the full width requirement but in no case less than nine (9)
feet. As a component of all land use buffer requirements, opaque screening,
whether a fence or other device, a minimum of six (6) feet in height shall be
required upon the property line side of the buffer. A minimum of seventy (70)
percent of the land use buffer shall be undisturbed. Easements cannot count
toward fulfilling this requirement. Existing plant materials can be used to meet
screening and perimeter requirements if protected and noted to remain on the
landscape plan.
3. A perimeter planting strip is required along any side of a vehicular use area that
abuts adjoining property, or the right-of-way of any street. This strip shall be at
least nine (9) feet wide. One (1) tree and three (3) shrubs or vines shall be
planted for every thirty (30) linear feet of perimeter planting strip.
4. Building landscape areas shall be provided at the rate equivalent to planter strip
three (3) feet wide along the vehicular use area. One (1) tree and
four (4) shrubs shall be planted in the building landscape areas for each
forty (40) linear feet of vehicular use area abutting the building.
5. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). The minimum size of an interior landscape area shall be one hundred
fifty (150) square feet for developments with one hundred fifty (150) or fewer
parking spaces. Interior islands must be a minimum of seven and one half
(7 1/2) feet in width. Trees shall be included in the interior landscape areas at
the rate of one (1) tree for every twelve (12) parking spaces.
6. A landscape irrigation system shall be required for developments of one
(1) acre or larger.
7. The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
G. Transportation/Planning:
Rock Region Metro: The site is not located on a dedicated Rock Region Metro
Route.
Planning Division: This request is located 65th Street East Planning District. The
Land Use Plan shows Residential Medium (RM) for this property. The Residential
Medium Density (RM) category accommodates a broad range of housing types
including single family attached, single family detached, duplex, town homes,
multi -family and patio or garden homes. Any combination of these and possibly
other housing types may fall in this category provided that the density is between
7
FILE NO.: Z -3808-B (Cont.
six (6) and twelve (12) dwelling units per acre. The applicant has applied for
rezoning from C-1 (Neighborhood Commercial District) and R-2 (Single Family
District) to PRD (Planned Residential Development) to allow the construction of
two (2) buildings each containing 12 units (24 total units) for a density of
approximately 12.6 units/acre.
Master Street Plan: East of the property is Mabelvale Pike and it is shown as a
Minor Arterial Street on the Master Street Plan. A Minor Arterial provides
connections to and through an urban area and their primary function is to provide
short distance travel within the urbanized area. Entrances and exits should be
limited to minimize negative effects of traffic and pedestrians on Mabelvale Pike
since it is a Minor Arterial. This street may require dedication of right-of-way and
may require street improvements for entrances and exits to the site
Bicvcle Plan: A Class II Bike Lane is shown along Mabelvale Pike. Bike Lanes
provide a portion of the pavement for the sole use of bicycles.
H. SUBDIVISION COMMITTEE COMMENT: (November 1, 2017)
The applicants were present. Staff presented an overview of the item stating there
were few outstanding technical issues associated with the request in need of
addressing related to the site plan. Staff requested details concerning the
proposed signage plan and any proposed fencing.
Public Works comments were addressed. Staff stated the City's Stormwater
Detention Ordinance would apply to the future development of the site. Staff
requested the applicant provide the location for the proposed stormwater detention
facilities on the site plan. Staff stated a grading permit was required prior to any
land clearing or grading of the site. Staff stated right of way dedication to 45 -feet
from centerline was required along Mabelvale Pike.
Landscaping comments were addressed. Staff stated land use buffers and
screening was required along the perimeters of the site where adjacent to
residential zoning or use. Staff stated a landscape irrigation plan was required for
sites over one (1) acre. Staff stated building landscaping and interior, parking lot,
landscaping would be required at the time of development.
Staff noted the comments from the various other departments and agencies. Staff
suggested the applicant contact the departments or agencies directly with any
questions or concerns. There were no more issues for discussion. The Committee
then forwarded the item to the full Commission for final action.
ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the technical
issues associated with the request. The applicant has provided the proposed
signage plan and location of all proposed fencing. The applicant has also indicated
FILE NO.: Z -3808-B (Cont.)
the development will occur within 12 to 24 months of approval. The applicant notes
the date for construction of the Phase 2 portion of the site has not been determined.
The applicant is requesting a rezoning of the site from C-1, Neighborhood
Commercial Zoning District and R-2, Single-family Zoning District to PD -R,
Planned Development Residential, to allow the development of the site with multi-
family housing. The Phase 1 portion is proposed with 12 total units. The building
is proposed as a two (2) story structure. Each floor will have
four (4) one -bedroom and two (2) studio units totaling 6,000 gross square feet for
the entire building.
A total of 18 off street parking spaces on a paved surface will be provided and
accessed by a new paved driveway from the existing drive apron at Mabelvale
Pike. Parking for multi -family is typically based on one and one-half (1 Y2) parking
spaces per unit. 12 units would typically require 18 parking spaces to serve the
use.
A future phase of the development plan includes the complete rehabilitation of the
existing residential house located on the site. The structure will be used as a
residence and/or a leasing office for the multi -family development. The office will
also serve as an activities center for the residents of the multi -family homes.
A third phase of the development includes an additional 12 -unit apartment building
with the same design as the initial apartment buildings. With this phase of the
development additional paved parking will be added to accommodate the new
units.
The plan indicates the placement of a six (6) foot fence around the perimeter of
the site. The plan also indicates the placement of a six (6) foot wrought iron metal
fence with a remote control entry gate at the driveway. The plan also indicates the
placement of a three (3) foot wide pedestrian gate adjacent to the vehicular use
gate.
The plan indicates the placement of a dumpster on the site. The plan notes the
dumpster will be fully screened per typical ordinance requirements. The applicant
also notes the hours of dumpster service will be limited to 7 am to 6 pm Monday
through Friday.
The plan includes the placement of an entry sign. The sign is proposed
six (6) feet height and 24 square feet in area. The sign is proposed consistent with
signage allowed in multi -family zones.
There is a large wooded area which will remain on the site to act as buffering and
screening to the adjacent property to the north and west. The applicant is however
requesting a variance from the Land Alteration Ordinance to allow grading of future
phases with the development of the first phase.
P9
FILE NO.: Z -3808-B (Cont.
Staff is supportive of the applicant's request. The site is located adjacent to
multi -family on the northeastern perimeter and commercial on the southeastern
perimeter. The site is indicated on the future land use plan as RM, Residential
Medium, which typically allows for multi -family at a density of six (6) to twelve (12)
units per acre. As currently proposed when fully developed the overall density
proposed is 12.6 -units per acre. To staff's knowledge there are no outstanding
technical issues in need of addressing related to the site plan. Staff does not feel
the development of the site with multi -family as proposed will have a significant
impact on the area.
J. STAFF RECOMMENDATIO
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda staff
report.
Staff recommends approval of the variance request from the Land Alteration
Ordinance to allow grading of future phases with the construction of the
first phase.
PLANNING COMMISSION ACTION: (NOVEMBER 30, 2017)
The applicant was present. There was one (1) registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the variance
request from the Land Alteration Ordinance to allow grading of future phases with the
construction of the first phase.
Mr. Dino Davis, the applicant, requested to yield his time to the opposition.
Ms. Pam Adcock, President of Southwest Little Rock United for Progress, addressed the
Commission with concerns. She stated Mr. Davis and Kwendeche had attended the
Southwest Little Rock United for Progress meeting and presented the plan. She stated
Mr. Davis had indicated the apartments would not be used for rehabilitation housing. She
stated Mr. Davis had also agreed there would be an on-site manager 24/7/365. She
stated the members and attendees had voted to not support the request due to a concern
the one (1) room apartments would eventually revert to rehab facility housing units due
to Mr. Davis' profession. She stated the development was too close to an elementary
school. She stated there were sufficient apartments in the area currently. She stated the
existing apartments generated a number of police calls. She stated the neighborhood
would rather have single-family homes. She requested the Commission place limits on
the request to not allow the apartments to not become a rehab facility and to require there
be an on-site manager.
10
FILE NO.: Z -3808-B_ (Cont.) _
Mr. Davis stated the new construction was for affordable living apartments. He stated
this development was not connected to the rehab facility. He stated he had owned the
property since 2008 and the existing home was a five (5) one (1) bedroom apartment. He
stated there had been no police calls to this address during the entire time he had owned
the property. He stated he wanted to enhance the community. He stated the
development was on the edge of Southwest Little Rock. He stated the existing structure
would be rehabbed to allow for a managers residence and to allow for community space
for the residents of the apartments.
Chairman Berry questioned if the City could require or deny residency for persons with
drug or alcohol addictions. Shawn Overton, Deputy City Attorney, stated the City could
not deny residency based on these conditions. Mr. Dana Carney stated the rehab facility
was a different zoning and Mr. Davis was not requesting rehab as an allowable use for
the apartments. He stated someone leaving Mr. Davis' rehab center could come to this
site and rent an apartment just as anyone else could rent at this location. He stated to
allow the site to be used as a rehabilitation facility would require a separate action by the
Planning Commission.
The Commission questioned Mr. Davis if he was committing to an on-site manager.
Mr. Davis stated the existing structure would be remodeled and an on-site manager's
residence would be provided.
There was a general discussion by the Commission of the request and the crime rates in
the area. Mr. Laha stated he did not feel there was any significant crime in the area. He
questioned if the conditions, to not allow the development to become a rehab facility and
the on-site manager's residence would remain with the zoning or were they approved just
for this owner. Staff stated the commitments would become a part of the zoning and
transfer to any future owner of the property.
There was no further discussion. A motion was made to approve the variance request
from the Land Alteration Ordinance. The motion carried by a vote of 7 ayes, 1 no and
3 absent. A motion was made to approve the rezoning request including all staff
recommendations and comments. The motion carried by a vote of 7 ayes, 1 no and
3 absent.
11
Item No. 8 Z -3808-B
Davis Short -form PD -R
Applicant Response to Subdivision Meeting Comments
November 8, 2017
Planning Staff Comments
1. Notification of the property owners within 200 feet of the site was mailed (certified) on
Monday, November 7, 2017
2. Yes, a screened dumpster is shown on the site plan.
3. New signage (type and location) has yet to be determined, however new sign shall be in
compliance with the applicable signage standards for multi -family housing.
4. The existing wood framed house shall be renovated under a subsequent phase for
non-residential use as the management / security office and maintenance storage facility. It
is likely that management / security staff located v•rithin the facility will have a kitchenette,
toilet and rest area.
5. The parcel size is 83,085 sq. feet (1.907 acres). The Phase 1 building is a total of 6,000 sq.
feet. The areas for planned paved (drives and parking) = approx. 6%; and the existing tree
covered areas for landscaping = approx. 50%. The remaining landscaping is a maintained
lawn.
6. The proposed perimeter fence on the north, east and west shall be a new 6 foot opaque
wood slat fence with the finish face to the interior of the site. A new 6 foot ornate iron
fence shall be on the south face of the site with a remote controlled gate, as shown on the
site plan. Fencing / gate construction details shall be prepared and issued with the
construction drawings for building permit purposes.
7. The development schedule shall commence upon receipt of an ordinance (if approved)
by the City Board of Directors on or about February 2018. The intent is to complete Phase
1 (the initial 12 -unit apartment component and site work) within 24 months of the date of
the ordinance. No timeline is currently planned for the Phase 2 development.
Variance I Waivers:
The applicant request a variance for Land Authority Code to apply for the Phase 2 site work.
Engineering Comments:
Public Works Conditions:
1. Acknowledged. The updated site plans illustrates a graphic representation of the required
dedication of R.O.W. 45 feet from the centerline of Mabelvale Pike.
produksii
Item No. 8 Z -3808-B
Davis Short -form PD -R
Applicant Response to Subdivision Meeting Comments, cont. page 2
November 8, 2017
Rublc Works conditions, continued
2. Acknowledged.
3. Acknowledged. See variance request.
4. The general location of the required stormwater detention is shown on the updated site
plan. Detailed documentation shall be prepared for building permit review.
5. Acknowledged.
6. Acknowledged.
7. Acknowledged.
8. Acknowledged.
Utilities Fire De artment Parks County Planning:
Little Rock Water Reclamation Authority: Acknowledged.
Entergy: Acknowledged.
Centerpoint Energy: Acknowledged
AT&T Acknowledged
Central Arkansas Water: Items 1.- 5.: Acknowledged.
Fire Department: Items
A phone contact has been made to the LR Fire Department (LRFD) concerning the fire apparatus
road requirements providing detailed information relative to the comments. LRFD informed me
that a Fire Marshall would respond to our initial inquiry. To -date, no response has been received
from the LRFD. Applicant shall continue to pursue resolution of this matter with the LRFD.
4. 30' Tall Buildings re: Aerial Apparatus,
The final design for the apartment will limit the height to less than 30 feet.
5. Dead Ends:
Further clarification is needed from the LRFD.
produksi
Item No. 8 Z -3808-B
Davis Short -form PD -R
Applicant Response to Subdivision Meeting Comments, cont. page 3
November 8, 2017
Fire Department, continued
6. Gates (Items 1. - 9.) The intent is to have a remote control access gate at the new
driveway to the units. If the new driveway is confirmed by the LRFD as a fire apparatus
access road or if an additional road is required, the road gate components, as listed shall
be complied.
10. Multi -family Residential Developments:
The planned project has only 12 dwelling units under Phase 1 and a potential for 12
additional units under Phase 2.
Exception: a. If a single fire apparatus road is approved by the LRFD, and given that the
project is less than 200 units, the subsequent requirement for an automatic
sprinkler system is requested as a variance (not to provide), subject to further
discussion with the LRFD including the use of full height fire rated separation
walls between the units in lieu of an automatic sprinkler system.
7. Fire Hydrants.
Acknowledged.
Parks and Recreation: Acknowledged
County Planning: Acknowledged
Building Codes Landscape:
Building Code. Acknowledged
Landscape
1. Acknowledged
2. - 5. The updated site plan illustrates a general understanding to the landscape requirements.
A more detailed landscape plan and specifications shall be prepared and submitted
subsequent to the issuance of an ordinance for building permit purposes.
6. Acknowledged. Details shall be submitted for building permit purposes.
7. Acknowledged. Approx. 50% of the site is currently covered by existing trees, of which
the intent is to retain a many as possible (over 6" caliper) as credit toward fulfilling
the Landscape Ordinance requirements.
produksi
Item No. 8 Z -3808-B
Davis Short -form PD -R
Applicant Response to Subdivision Meeting Comments, cont. page 4
November 8, 2017
TransportationlPlannin�g-
Rock Region Metro: Acknowledged
Planning Division: Acknowledged
Master Street -Plan. Acknowledged
Bicycle Plan: Acknowledged
Revised,,.. plat 1 plan:
Please find four (4) copies of the revised site plan and copies of the attached response.
produksi
ITEM NO.: 8. Z -3808-B
NAME: Davis Short -form PD -R
LOCATION: located at 5210 Mabelvale Pike
Planning Staff Comments:
1. Provide notification of the property owners located within 200 -feet of the site including the
certified abstract list, notice form with affidavit executed and proof of mailing. The notice
must be mailed no later than November 15, 2017. The Office of Planning and
Development must receive the proof of notice no later than November 24, 2017.
2. Will there be a dumpster located on the site? If so provide the location of the proposed
dumpster and a note indicting the screening. Staff recommends the hours of dumpster
service be limited to 7 am to 6 pm Monday through Friday.
3. Provide details of the proposed signage plan including location total height and total sign
area for ground signage. Provide details of the proposed building signage including the
location and total sign area proposed.
4. What is the future use of the residence? Will the structure be used as a commercial,
office or residential use?
5. Provide the quantitative data including the parcel size, building square footage, areas
paved and areas for landscape (percentages).
6. Provide details of any proposed fences, location, construction material, total height.
7. Provide a development schedule indicating the approximately date when construction of
the planned unit development or stages of the planned unit development can be expected
to begin and be completed.
VarianceAAJaivers: None requested.
En ineerin Comments:
Public Works Conditions:
1. Mabelvale Pike is classified on the Master Street Plan as a minor arterial. A dedication of
right-of-way 45 feet from centerline will be required.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-
way prior to occupancy. Remove old driveway curb cuts no longer proposed to be used.
3. A grading permit in accordance with Section 29=186 (c) and (d) will be required prior to
any land clearing or grading activities at the site. Other than residential subdivisions, site
grading and drainage plans must be submitted and approved prior to the start of
construction. Is an advanced grading variance being requested to grade Phase 2 with
construction of Phase 1?
4. Stormwater detention ordinance applies to this property. Show the proposed location for
stormwater detention facilities on the plan. Maintenance of the detention pond and all
private drainage improvements is the responsibility of the developer and/or property
owner.
ITEM NO.: 8.
Him
5. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the
Arkansas Department of Environmental Quality prior to the start of construction.
6. Hauling of fill material on or off site over municipal streets and roads requires approval
prior to a grading permit being issued. Contact Public Works Traffic Engineering at 621
South Broadway, Travis Herbner, therbner�littlerock.goy or 501.379.1805 for more
information.
7. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by the
responsible party prior to issuance of a certificate of occupancy.
8. Access to detention ponds must be provided to the public right-of-way and/or access
easement for future maintenance by the developer and/or owner.
Utilities/Fire Department/Parks/County Planning:
Little Rock Water Reclamation Authority: Sewer available to this site. Capacity and fee
analysis required. Contact Little Rock Water Reclamation Authority for additional information.
Entergy: Entergy does not object to this proposal. There do not appear to be any conflicts
with existing electrical utilities based on the information provided. There is an existing three
phase power line running along the south side of Mabelvale Pike in front of this property.
Contact Entergy in advance to discuss electrical service requirements, or adjustments to
existing facilities (if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water service
must be met.
2. Please submit plans for water facilities and/or fire protection system to Central Arkansas
Water for review. Plan revisions may be required after additional review. Contact Central
Arkansas Water regarding procedures for installation of water facilities and/or fire service.
Approval of plans by the Arkansas Department of Health Engineering Division and the
Little Rock Fire Department is required.
3. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire protection.
4. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas
Water. That work would be done at the expense of the developer.
5. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to
obtain information regarding the required placement of the hydrant(s) and contact Central
Arkansas Water regarding procedures for installation of the hydrant(s).
ITEM NO.: 8.
Fire Department -
1. Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access
road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road,
the minimum road width shall be 26 feet, exclusive of shoulders.
2. Grade. Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas
Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not
exceed 10 percent in grade except as approved by the fire chief.
3. Loading. Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities,
buildings or portions of buildings hereafter constructed shall be accessible to fire
department apparatus by way of an approved fire apparatus access road with an asphalt,
concrete or other approved driving surface capable of supporting the imposed load of fire
apparatus weighing at least 75,000 pounds.
4. 30' Tall Buildings - Maintain aerial fire apparatus access roads as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D105.1 — D105.4
a. D105.1 Where Required. Where the vertical distance between the grade plane
and the highest roof surface exceed 30', approved aerial fire apparatus access
roads shall be provided. For the purposes of this section the highest roof
surfaces shall be determined by measurement to the eave of a pitched roof, the
intersection of a roof to the exterior wall, or the top of the parapet walls,
whichever is greater.
b. D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed with of 26', exclusive of shoulders, in the immediate vicinity of the
building or portion thereof.
c. D105.3 Proximity to building. At least one of the required access routes meeting
this condition shall be located within a minimum of 15 feet and a maximum of
30 feet from the building, and shall be positioned parallel to one entire side of
the building. The side of the building on which the aerial fire apparatus access
road is positioned shall be approved by the fire code official.
d. D105.4 Obstructions. Overhead utility and power lines shall not be located over
the aerial fire apparatus access road or between the aerial fire apparatus road
and the building. Other obstructions shall be permitted to be places with the
approval of the fire code official.
5. Dead Ends. Maintain fire apparatus access roads at dead end locations as per Appendix
D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead Ends. Dead-
end fire apparatus access roads in excess of 150 feet shall be provided with width and
turnaround provisions in accordance with Table D103.4. Requirements for Dead-end fire
apparatus access roads.
ITEM NO.: 8.
=.
6. Gates. Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road gates.
Gates securing the fire apparatus access roads shall comply with all of the following
criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices shall be
approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or when a
key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with UL 325.
9. Gates intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
10. Multi -family Residential Developments - As per Appendix D, Section D106.1 of the
2012 Arkansas Fire Prevention Code Vol. 1. Projects having more than 100
dwelling units. Multiple -family residential projects having more than 100 dwelling
units shall be equipped throughout with two separate and approved fire apparatus
access roads.
a. Exception: Projects having up to 200 dwelling units may have a single
approved fire apparatus access road when all building, including
nonresidential occupancies are equipped throughout with approved
automatic sprinkler systems installed in accordance with Section
903.3.1.1 or 903.3.1.2.
b. As per Appendix D, Section D106.2 of the 2012 Arkansas Fire
prevention Code Vol. 1. Projects having more than 200 dwelling units.
Multiple -family residential projects having more than 200 dwelling units
shall be provided with two separate and approved fire apparatus access
roads regardless of whether they are equipped with an approved
automatic sprinkler system.
7. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water
(Jason Lowder 501.377.1245) and the Little Rock Fire Marshal's Office (Capt. Tony
Rhodes 501.918.3757 or Capt. John Hogue 501.918.3754). Number and Distribution of
Fire Hydrants as per Table C105.1.
ITEM NO.: 8.
Parks and Recreation: No comment received.
County Planning: No comment.
Building Codes/Landscape:
Building Code: Project is subject to full commercial plan review and approval prior to
issuance of a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crichey(d),littlerock.gov or
Mark Alderfer at 501.371.4875; malderfer@littlerock.gov .
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements
2. A land use buffer six (6) percent of the average width/depth of the lot will be required
when an adjacent property has a dissimilar use of a more restrictive nature. The property
to the north and west is zoned R-2, Single-family. The maximum dimension required shall
be fifty (50) feet. The minimum dimension shall be one-half (Y2) the full width requirement
but in no case less than nine (9) feet. As a component of all land use buffer requirements,
opaque screening, whether a fence or other device, a minimum of six (6) feet in height
shall be required upon the property line side of the buffer. A minimum of seventy (70)
percent of the land use buffer shall be undisturbed. Easements cannot count toward
fulfilling this requirement. Existing plant materials can be used to meet screening and
perimeter requirements if protected and noted to remain on the landscape plan.
3. A perimeter planting strip is required along any side of a vehicular use area that abuts
adjoining property, or the right-of-way of any street. This strip shall be at least nine (9) feet
wide. One (1) tree and three (3) shrubs or vines shall be planted for every thirty (30) linear
feet of perimeter planting strip.
4. Building landscape areas shall be provided at the rate equivalent to planter strip three (3)
feet wide along the vehicular use area. One (1) tree and four (4) shrubs shall be planted in
the building landscape areas for each forty (40) linear feet of vehicular use area abutting
the building.
5. Eight percent (8%) of the vehicular use area must be designated for green space; this
green space needs to be evenly distributed throughout the parking area(s). The minimum
size of an interior landscape area shall be one hundred fifty (150) square feet for
developments with one hundred fifty (150) or fewer parking spaces. Interior islands must
be a minimum of seven and one half (7 1/2) feet in width. Trees shall be included in the
interior landscape areas at the rate of one (1) tree for every twelve (12) parking spaces.
6. A landscape irrigation system shall be required for developments of one (1) acre or larger.
7. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can be
given when preserving trees of six (6) inch caliper or larger.
ITEM NO.: 8.
Transportation/Planning:
M
Rock Region Metro: The site is not located on a dedicated Rock Region Metro Route.
Planning Division: This request is located 65th Street East Planning District. The Land Use
Plan shows Residential Medium (RM) for this property. The Residential Medium Density (RM)
category accommodates a broad range of housing types including single family attached,
single family detached, duplex, town homes, multi -family and patio or garden homes. Any
combination of these and possibly other housing types may fall in this category provided that
the density is between six (6) and twelve (12) dwelling units per acre. The applicant has
applied for rezoning from C-1 (Neighborhood Commercial District) and R-2 (Single Family
District) to PRD (Planned Residential Development) to allow the construction of two (2)
buildings each containing 12 units (24 total units) for a density of approximately 12.5
units/acre.
Master Street Plan: East of the property is Mabelvale Pike and it is shown as a Minor Arterial
Street on the Master Street Plan. A Minor Arterial provides connections to and through an
urban area and their primary function is to provide short distance travel within the urbanized
area. Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Mabelvale Pike since it is a Minor Arterial. This street may require dedication
of right-of-way and may require street improvements for entrances and exits to the site
Bicycle Plan: A Class II Bike Lane is shown along Mabelvale Pike. Bike Lanes provide a
portion of the pavement for the sole use of bicycles.
Revised Plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the
additional information as noted above) to staff on Wednesday, November 8, 2017.