Loading...
Z-3709-A Staff AnalysisZ -3709 - NAME: ALLTEL IV -- SITE PLAN REVIEW AND ABANDONMENT OF PORTIONS OF CEDAR HILL ROAD AND ALLIED DRIVE AND ABANDONMENT OF AN EAST -WEST UTILITY EASEMENT LOCATION: On the north side of Riverfront Drive at Cedar Hill Road, at 1501 Riverfront Drive DEVELOPER: ALLTEL SERVICE CORP. P. O. Box 2177 Little Rock, AR 72203 661-8000 AREA• 36.3 ACRES ZONING• 0-2 & 0-3 PLANNING DISTRICT: CENSUS TRACT• 15 VARIANCES REQUESTED: sidewalks along the of the site 4 ENGINEER• DEVELOPMENT CONSULTANTS, INC. 10,411 W. Markham St., Suite 210 Little Rock, AR 72205 221-7880 NUMBER OF LOTS: 5 FT. NEW STREET: 0 PROPOSED USES: Offices Waiver from the requirement to construct Riverbend Road and Cottondale Lane frontages STATEMENT OF PROPOSAL: The applicant proposes further development to their site on the east side of Riverfront Drive north of Cottondale Drive. An additional six story, 318,016 square foot office building is proposed to be located north of the existing complex. New parking for 1,337 vehicles is proposed. At the same time, the applicant proposes abandonment of the rights-of-way for Allied Drive and Cedar Hill Road, both of which serve only the Alltel property, and abandonment of an easement which lies between the east end of Cedar Hill Road and the Arkansas River to the east. At the time traffic warrants indicate that a traffic control signal is applicable, a signal is proposed to be installed at the applicant's expense at the Riverfront Drive -Cedar Hill Road intersection. The applicant anticipates conformance with the landscaping and buffer ordinances, and with the stormwater detention ordinance. A: PROPOSAL/REQUEST: Review by the Planning Commission is requested of a site plan for the expansion of the Alltel facilities located on Riverfront Drive north of Cottendale Lane. An additional office building is proposed to be added to the site to the north of the existing office complex. The new building is to be a six -story, 318,016 square foot building. It is to be centered on and east of the Cedar Hill Drive cul-de-sac FILE NO.: Z -3709-A (Continued) and backing on the Arkansas River. A terrace is proposed to be constructed over a portion of the river levee. The existing complex has parking facilities for 706 vehicles. Some of these spaces will be eliminated when the new building is constructed, and of the existing parking, 406 spaces will remain. New spaces totaling 1,337 will be added. There will, then, be parking for 1,743 vehicles on the grounds. This is a ratio of over 1 space per 300 square feet of building area. A traffic signal is proposed to be installed at the Cedar Hill Road-Riverfront Drive intersection at such time that traffic engineering approves the installation, with the applicant bearing the cost of the installation. The applicant requests abandonment of the two existing streets, Allied Drive and Cedar Hill Rd., since they serve only their own property and there is a need to control access to the site. Retention of the easements in the streets is anticipated. Erection of a security post and gate is proposed for Allied Drive, and erection of a traffic control gate is proposed for Cedar Hill Road. A provision for vehicle turn -around at these gates is anticipated. The applicant requests a waiver from the requirement to construct a sidewalk along the existing right-of-way of the two boundary streets to the project: Cottendale Lane on the south and Riverbend Road on the north. With the location of the developments along and at the eastern end of both of these streets, it is not felt that sidewalks are needed. Also, the applicant plans to construct a 6 foot wide asphalt bike and jogging path along the Riverfront Drive frontage, and requests a waiver from the requirement for the other two sidewalks a a means of offsetting the costs of this extra width path. B. EXISTING CONDITIONS: The site is presently partially developed. Centered on the existing Allied Drive, to the east of the cul-de-sac, is an existing complex which consists of twin seven -story office buildings containing 103,508 square feet each, and a two- story, 18,218 square foot building between and joining the twin towers. There is existing parking for 706 vehicles. Allied Drive is a public street serving the parking facilities and for access to the offices. There are no sidewalks on the three boundary streets, Cottondale Lane, Riverbend Road, or Riverfront Drive, nor are there sidewalks on the two internal streets, Allied Drive and Cedar Hill Road. The existing zoning of the site is 0-2 and 0-3, with the majority of the site being 0-2. The area which is 0-3 lies in the north-west quadrant of the site, from Cedar Hill Road 2 FILE NO.: Z-370 -A Contin ed northward to Riverbend Road, and from a line northward from the cul-de-sac of Cedar Hill Road to the west to Riverfront Drive. The remainder of the site is C-2. The C-2 zoning of the site, and multiple buildings associated with the development of property in 0-3, necessitate site plan review. The request for this review has, consequently, been submitted. ENGINEERINCIUTILITY COMMENTS: The City Engineering office cites the Ordinance requirement for sidewalk construction along the Cottondale Lane frontage of the site. Traffic engineering reports that the traffic signals at Riverfront Drive and Cedar Hill Road will have to meet traffic warrants to justify installation of the signals, and that the applicant will be responsible for the cost of the installation. The signals and controllers will have to be installed on public right-of-way, so provision for any required right-of-way should be made as the right-of-way abandonment proceeding of Cedar Branch Road is conducted. Traffic engineering will permit the applicant to install the underground conduit for the signals, but the installation must be approved by Traffic Engineering whenever the installation can be justified. Water Works reports that the Utility has no objection to the abandonment of the right-of-way for Allied Drive and the 10 foot easement as requested. There is, however, an 8 inch water main in Cedar Hill Road, so the easements rights need to be retained. Water Works advises that the Fire Department will need to evaluate on-site fire protection to determine whether fire hydrants are located as needed. Water Works will require the existing water main and easements, as platted for Lot E-2 and recorded in instrument number 82-20543, be shown. Wastewater Utility indicates that there are no objections to the abandonment of the street rights-of-way and easements as requested, except that an easement must be retained at Cedar Hill Road. Sewer is available. It is noted that the 50 foot easement running north and south through the property is an exclusive sanitary sewer easement, not an undesignated "utility" easement. ARKLA Gas Co. and Southwestern Bell Telephone Co. approved the plan as submitted. The Fire Department approved the site plan as submitted. Neighborhoods and Planning Site Plan review indicates that the buffer width of the proposed parking lot adjacent to Cottondale Lane drops below the 20 foot full width 3 FILE NO.: Z -3709-A Continued requirement. This reduction is allowed by the zoning buffer code since the average width exceeds the requirement due to excessive green space west of the proposed parking lot. It should be noted, however, that should the parking lot be expanded westward towards Riverfront Drive and this "excessive" green space be reduced, the average depth would also be affected. This would then either affect the requirements along Cottondale Lane or limit the amount of expansion of the parking lot which would be permitted. The buffer width adjacent to the northern property which is zoned MF -18 needs to be increased to a minimum of 27 feet. (The full requirement without the tradeoffs is 40 feet.) D. ISSUES/LEGAL/TECHNICAL/DESIGN: The -applicant needs to coordinate the location and construction of the bike and jogging path along Riverfront Drive with the Parks and Recreation Department. At the Cedar Hill Road intersection, adequate right-of-way needs to be left for the installation of future traffic signals and controllers. These facilities need to be located on public property. E. ANALYSIS• Plans submitted to date have met almost all the requirements of staff and the utility companies. Only minor refinements are needed. No insurmountable deficiencies remain. F. STAFF RECOMMENDATIONS: Staff recommends approval of the request and of the waivers for sidewalk improvements to Riverbend Road and Cottendale Lane. SUBDIVISION COMMITTEE COMMENT: (JANUARY 20, 1994) Mr. Alan Sanders, architect, representing Alltel and Mr. Robert Brown, the engineer for the site planning, were present. Staff presented the item and the comments contained in the discussion outline. Traffic Engineering pointed out that the indication of the planned installation of the traffic signals at Cedar Hill Road and Riverfront Drive needed to be removed from the plan. When Traffic Engineering has determined that the signals are appropriate, the applicant may proceed with the installation. Staff noted that at the traffic control gate on Cedar Hill Road, a turn -around needs to be provided; that the hammer -head turn is not adequate. Staff cautioned the applicant to seek Levee Board approval of the terrace to be constructed on the levee. The applicant indicated that there would be a revised drawing 4 FILE NO.: Z -3709-A Continued submitted to eliminate the encroachment into the north landscape buffer by the parking lot. After the review by the Committee members, the Committee forwarded the item to the Commission for final resolution. PLANNING COMMISSION ACTION: (FEBRUARY 8, 1994) Staff reported that all required exhibits and information had been received, and that there were no remaining issues to be resolved. Staff recommended approval of the application, subject to the applicant coordinating with the Parks and Recreation Department on the location of the bike and jogging trail along Riverfront Drive, and subject to gaining approval from the Board of Directors of a waiver to delete the sidewalks along Cottondale Lane and Riverbend Road. Staff recommended approval of the waiver. The item was included on the Consent Agenda for approval, and was approved as an item in the Consent Agenda with the vote of 9 ayes, no nays, one absent, and one open position. 6i