Loading...
14803 1 RESOLUTION NO. 14,803 2 3 A RESOLUTION TO IDENTIFY EXPENDITURES IN VARIOUS WARDS 4 FOR CAPITAL PROJECTS FUNDED FROM THE PROCEEDS OF THE 5 3/8-CENT CAPITAL SALES AND COMPENSATING USE TAX AND 2018 6 CAPITAL IMPROVEMENT BONDS FOR STREETS AND DRAINAGE; 7 AND FOR OTHER PURPOSES. 8 9 WHEREAS, the electors of the City of Little Rock, Arkansas, approved an increase in 10 the City's Sales and Compensating Use Tax in order to accomplish the list of public purposes set forth 11 in Resolution No. 13,343,which was adopted on July 11,2011; and 12 WHEREAS, the electors of the City of Little Rock, Arkansas, approved the issuance of 13 Capital Improvement Bonds for Streets and Drainage in order to accomplish the public 14 purposes set forth in Ordinance No. 20,603, which was adopted on July 3rd, 2012;and 15 WHEREAS, it is desirable to fund the identified 2019, 2020 and 2021 Projects from 16 either the City Sales and Compensating Use Tax or from the 2013 Capital Improvement Bonds for 17 Streets and Drainage in the various Wards. 18 NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF 19 THE CITY OF LITTLE ROCK, ARKANSAS: 20 Section 1. The Board of Directors intends to accomplish the following list of Street and 21 Drainage Improvement Projects in Ward 1 with approximately Eight Million, Four Hundred Thousand 22 Dollars ($8,400,000.00) with proceeds from the 3/8-Cent Capital Improvement Sales and Compensating 23 Use Tax and the 2018 Capital Improvement Bonds for Streets and Drainage: 24 a) 13th Street Culvert replacement in the 2400 block 25 b) Howard and 22nd Street Storm Drain Replacement from Dennison Street to Howard Street 26 c) Swaggerty Branch Culvert Rehabilitation from Roosevelt Road to 31St Street 27 d) 6th Street Drainage Improvements from Collins Street to McLean Street 28 e) Wright Avenue Streetscape Improvements from Summit Street to Wolfe Street 29 f) Boulevard Street Reconstruction from Charles Bussey Boulevard to 22nd Street 30 g) Midtown Neighborhood Street Reconstruction, Abigail Street from 26th Street to 27th Street 31 and 27' Street from Abigail Street to Elm Street 32 h) 13th Street Railroad Overpass rehabilitation 33 i) Valentine Street Reconstruction from 8' Street to 12th Street [Page 1 of 5] 1 j) Marshall Street Sidewalks from Roosevelt Road, south to end of the street 2 k) Dr. Martin Luther King, Jr. Drive Drainage Improvements from 19th Street to 24th Street 3 1) Sidewalk—Construct new and replacement sidewalk priorities throughout the Ward 4 m) Resurfacing—Street resurfacing priorities throughout the Ward 5 Section 2. The Board of Directors intends to accomplish the following list of Street and 6 Drainage Improvement Projects in Ward 2 with approximately Six Million, Seven Hundred Thousand 7 Dollars ($6,700,000.00) with proceeds from the 3/8-Cent Capital Improvement Sales and Compensating 8 Use Tax and the 2018 Capital Improvement Bonds for Streets and Drainage: 9 a) Grant Street at Buchanan Street Drainage Improvements 10 b) Senate Drive Ditch Improvements 11 c) Loetscher Lane Drainage Improvements from Loetscher Lane to Sunset Lane 12 d) Madison Street Reconstruction from 10th Street to 12th Street 13 e) Maryland Avenue Reconstruction from Abigail Street to Lewis Street 14 f) 10th Street Reconstruction from Washington Street to Madison Street 15 g) Oak Grove Lane Sidewalks from Fairfield Drive to Valley Drive 16 h) Geyer Springs Road Reconstruction from Hutsell Road to 56th Street 17 i) Daily Drive Sidewalk and Street Improvements, 18 j) 19th Street Reconstruction from University Avenue to Grant Street 19 k) Sidewalks—Construct new and replacement sidewalk priorities throughout the Ward 20 1) Resurfacing—Street resurfacing priorities throughout the Ward 21 Section 3. The Board of Directors intends to accomplish the following list of Street and 22 Drainage Improvement Projects in Ward 3 with approximately Eight Million Dollars ($8,000,000.00) 23 with proceeds from the 3/8-Cent Capital Improvement Sales and Compensating Use Tax and the 2018 24 Capital Improvement Bonds for Streets and Drainage: 25 a) Valentine Street Drainage Improvements from Markham Street to 4th Street 26 b) West 4th Street Drainage and Street Improvements from Valentine Street to Martin Street 27 c) Fillmore Street Drainage and Street Improvements from Y Street to Z Street 28 d) Briarwood Area Drainage Improvements from Sun Valley Road north 29 e) B Street Reconstruction from Polk Street to Tyler Street 30 f) Polk Street Reconstruction from H Street to G Street 31 g) Barton Street Drainage Improvements from Dennison Street to 3rd Street 32 h) Stonewall and Country Club Drainage from Van Buren Street to Spruce Street, 33 i) Shannon Drive Reconstruction from Broadview Drive to Pine Manor Drive 34 j) Lookout Road Sidewalk from Ash Street to Allsopp Park Drive [Page 2 of 5] 1 k) Sidewalks—Construct new and replacement sidewalk priorities throughout the Ward 2 1) Resurfacing—Street resurfacing priorities throughout the Ward 3 Section 4. The Board of Directors intends to accomplish the following list of Street and 4 Drainage Improvement Projects in Ward 4 with approximately Nine Million Seven Hundred Thousand 5 Dollars ($9,700,000.00) with proceeds from the 3/8-Cent Capital Improvement Sales and Compensating 6 Use Tax and the 2018 Capital Improvement Bonds for Streets and Drainage: 7 a) Longlea Drive Culvert Replacement south of El Dorado Drive 8 b) Leatrice Drive Drainage Improvements at East Shore Drive 9 c) Breckenridge Drive Culvert Replacement at Grassy Flat Creek 10 d) Harris Street Construction south of Cantrell Road 11 e) North Rodney Parham Road Reconstruction from Hinson Road to Pleasant Forest Drive 12 f) Pleasant Valley Drive Sidewalk from Breckenridge Drive to west of Interstate 430 13 g) Reservoir Road Improvements from Reservoir Court to Beacon Hill Apartments 14 h) Resurfacing—Street resurfacing priorities throughout the Ward 15 Section 5. The Board of Directors intends to accomplish the following list of Street and 16 Drainage Improvement Projects in Ward 5 with approximately Six Million, Nine Hundred Thousand 17 Dollars ($6,900,000.00) with proceeds from the 3/8-Cent Capital Improvement Sales and Compensating 18 Use Tax and the 2018 Capital Improvement Bonds for Streets and Drainage: 19 a) Madison Valley Drainage Improvements west of Madison Valley Subdivision, 20 b) Kanis Road Improvements from Point West Drive to Gamble Road 21 c) Bella Rosa Drive Reconstruction from Taylor Loop Road north to the bridge 22 d) Chenal Parkway Intersection Improvements at Bowman Road, Westhaven Drive and Rahling 23 Road 24 e) Gamble Road Improvements from Markham Street to Stacy Lane 25 f) Katillus Road/Forest Lane Reconstruction from Cantrell Road along Katillus Road and Forest 26 Lane 27 g) Chenal Parkway Subsurface Drainage Improvements at various locations, 28 h) Rummel Road Reconstruction from Countryside Cove to Mooser Lane 29 i) Sidewalks—Construct new and replacement sidewalk priorities throughout the Ward 30 j) Resurfacing—Street resurfacing priorities throughout the Ward 31 Section 6. The Board of Directors intends to accomplish the following list of Street and 32 Drainage Improvement Projects in Ward 6 with approximately Seven Million, Eight Hundred 33 Thousand Dollars ($7,800,000.00) with proceeds from the 3/8-Cent Capital Improvement Sales and 34 Compensating Use Tax and the 2018 Capital Improvement Bonds for Streets and Drainage: [Page 3 of 5] 1 a) Kanis Road Improvements from Embassy Suites Drive to Bowman Road 2 b) Bowman Road from Kanis Road to Cherry Laurel Drive, design and right-of-way acquisition 3 c) Bellemeade Drive Reconstruction from 30th Street to 32'Street 4 d) Kanis Road Improvements from Business Park Drive to Michael Drive 5 e) Walker Street Reconstruction from 26th Street to 28th Street 6 f) Barrow Road Streetscape Phase 2 7 g) Spring Valley Drainage Improvements at Cooper Orbit Drive and Manor Drive 8 h) 22nd Street Drainage Improvements at Perry Street and 22" Street 9 i) Resurfacing—Street resurfacing priorities throughout the Ward. 10 Section 7. The Board of Directors intends to accomplish the following list of Street and 11 Drainage Improvement Projects in Ward 7 with approximately Eight Million, Five Hundred Thousand 12 Dollars ($8,500,000.00) with proceeds from the 3/8-Cent Capital Improvement Sales and Compensating 13 Use Tax and the 2018 Capital Improvement Bonds for Streets and Drainage: 14 a) Claybrook Road Drainage from Courtfield Drive to Churchhill Road 15 b) Yorkwood Area Floodway Improvements 16 c) Mabelvale Pike Improvements from Sibley Hole Road to Helm Drive 17 d) Crystal Valley Road Improvements from Cobblestone Creek Court to Redleaf Circle 18 e) Eastwood Street Reconstruction from Brandon Street to Vinewood Lane 19 f) Yarberry Lane Reconstruction from Deer Meadow Drive to Springtree Drive 20 g) Chicot Road Improvements from Mabelvale Cutoff Road to Yarberry Lane 21 h) Janmar Drive Drainage Improvements along Sheraton Drive from Southmont Drive to Lamont 22 Drive 23 i) Pecan Lake Subdivision Drainage Improvements at various locations, 24 j) Sidewalks—Construct new and replacement sidewalk priorities throughout the Ward 25 k) Resurfacing—Street resurfacing priorities throughout the Ward 26 Section 8. Severability. In the event any title, section, paragraph, item, sentence, clause, phrase, or 27 word of this resolution is declared or adjudged to be invalid or unconstitutional, such declaration or 28 adjudication shall not affect the remaining portions of the resolution which shall remain in full force and 29 effect as if the portion so declared or adjudged invalid or unconstitutional were not originally a part of the 30 resolution. 31 Section 9. Repealer.All laws, ordinances,resolutions, or parts of the same,that are inconsistent with 32 the provisions of this resolution,are hereby repealed to the extent of such inconsistency. 33 ADOPTED: June 19,2018 34 [Page 4 of 5] 1 Viri APPROVED: 2 WI. Ii_ rte. /(Z‘id( 4 .- usan . � ity Clerk Mark Stodola,Mayor 5 APPR I I•TO LEGAL FORM: 6 7 424irLli r 8 Thomas M. Carpenter, City Attol ey 9 II 10 // 11 // 12 II 13 // 14 // 15 // 16 // 17 // 18 // 19 // 20 // 21 // 22 // 23 // 24 // 25 // 26 // 27 // 28 // 29 // 30 // 31 // 32 // 33 // 34 // 35 // [Page 5 of 5]