pc_03 08 2018
LITTLE ROCK PLANNING COMMISSION
PLANNING – REZONING – CONDITIONAL USE HEARING
MINUTE RECORD
MARCH 8, 2018
4:00 P.M.
I. Roll Call and Finding of a Quorum
A Quorum was present being nine (9) in number.
II. Members Present: Craig Berry
Buelah Bynum
Keith Cox
Rebecca Finney
Scott Hamilton
Marlon Haynes
Troy Laha
Paul Latture
Diana Thomas
Members Absent: Bill May
Robert Stebbins
City Attorney: Shawn Overton
III. Approval of the Minutes of the January 25, 2018 Meeting of the Little
Rock Planning Commission. The Minutes were approved as presented.
LITTLE ROCK PLANNING COMMISSION
PLANNING – REZONING – CONDITIONAL USE HEARING
MARCH 8, 2018
4:00 P.M.
I. OLD BUSINESS:
Item Number:
File Number:
Title:
A. Z-9291 Word of Outreach Prayer Garden – Conditional Use
Permit
2700 Brown Street
II. NEW BUSINESS:
Item Number:
File Number:
Title:
1. Z-5253-A Scott Field Improvements at Forest Heights Middle
School – Conditional Use Permit
5901 Evergreen
2. Z-7935-C Vedant Society of Arkansas – Revised Conditional Use
Permit
10224 Nash Lane
3. A Revision of the River Market Design Overlay District (Sec. 36 -350 through
Sec. 36-367).
March 8, 2018
ITEM NO.: A FILE NO.: Z-9291
NAME: Word of Outreach Prayer Garden – Conditional
Use Permit
LOCATION: 2700 Brown Street
OWNER/APPLICANT: Word of Outreach/Carolyn Ann Smith
PROPOSAL: A conditional use permit is requested to allow for
development of this vacant, R-3 zoned lot as a
prayer garden.
1. SITE LOCATION:
The site is located at the southwest corner of Brown Street and West 27 th
Street.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The property is located on the edge of a small, single-family residential
neighborhood. Single family residences are located to the west, north and
northeast. The commercially zoned properties along Roosevelt Road, one
block to the south, contain a variety of uses; including a convenience store
with gas pumps, a Dollar General Store, bail bonds off ice, the Pulaski
County Jail complex and a retirement center. Staff has concerns that the
proposed prayer garden will encourage loitering which could negatively
impact nearby residents. As such, staff does not believe the use is
compatible with the residential neighborhood.
Notice of the public hearing was sent to all owners of properties located
within 200 feet of the site and the Goodwill Neighborhood Association.
3. ON SITE DRIVES AND PARKING:
No on-site parking is proposed.
4. SCREENING AND BUFFERS:
No comments.
March 8, 2018
ITEM NO.: A (Cont.) FILE NO.: Z-9291
2
5. PUBLIC WORKS:
1. Due to the proposed use of the property, the Master Street Plan
specifies that 27th Street for the frontage of this property must meet
commercial street standards. Dedicate right-of-way to 30 feet from
centerline.
2. Due to the proposed use of the property, the Master Street Plan
specifies that Brown Street for the frontage of this property must meet
commercial street standards. Dedicate right-of-way to 30 feet from
centerline.
3. A 20 feet radial dedication of right-of-way is required at the intersection
of 27th Street and Brown.
6. UTILITIES AND FIRE DEPARTMENT/BUILDING CODES:
Little Rock Reclamation Authority: Sewer main extension required with
easements if new sewer service is required for this project.
Entergy: Entergy does not object to this proposal. There do not appear to
be any conflicts with existing electrical utilities based on the information
provided. There is an existing three phase, overhead power line running
along the east side of this property along Brown Street. Contact Entergy
in advance to discuss electrical service requirements, or adjustments to
existing facilities (if any) as this project proceeds.
Centerpoint Energy: No comments received.
AT&T: No comments received.
Central Arkansas Water: No comments received. Contact CAW.
Fire Department: No comments.
Building Codes: All buildings placed on the property must have full plan
review. Structure built on current concrete slab must have full plan review
and a building permit before construction can begin.
For Submittal requirements and the review process, contact a commercial
plans examiner:
Curtis Richey at 501.371.4724; crichey@littlerock.org
March 8, 2018
ITEM NO.: A (Cont.) FILE NO.: Z-9291
3
7. TRANSPORTATION/PLANNING:
County Planning: No comments.
Rock Region METRO: This location is a block from the 14 – Rosedale
route. We have no objections to proposed conditional use.
Planning Division: No comments.
SUBDIVISION COMMITTEE COMMENT: (JANUARY 3, 2018)
The applicant was present. Staff presented the item and noted some additional
information was needed. The applicant was asked to locate and describe any
proposed fencing and site lighting. Staff asked what measures would be taken to
provide security for the site so that it did not become a loitering, nuisance
problem. Staff informed the Commission that the applicant proposed to have
contemplative music played at the site. The applicant was asked to provide a
specific description of how the music is to be played, what hours it would play
and what measures would be taken to assure that the sound is limited to the site
only. Staff asked what activities would the proposed gazebo building be used
for.
Public Works Comments were discussed. Staff explained the right-of-way
dedication requirement and noted the survey did not indicate the existing right-of-
way.
Other Agency Comments were noted.
The applicant was advised to submit responses to staff issues by January 10,
2018. The Committee forwarded the item to the full Commission.
STAFF ANALYSIS:
Word of Outreach Ministry is requesting approval of a conditional use permit to
allow for development of an open-air prayer garden on the vacant, R-3 zoned lot
located at 2700 Brown Street. The house which previou sly existed on the lot was
removed sometime ago, leaving only a small concrete slab. The ministry was
allowed to place a small (8 X 8) storage building on the slab to be used for
storage of lawn maintenance equipment and the like.
The proposed prayer garden will consist of a gazebo structure and several
specific areas for reading, praying or meditating. Each of the meditation areas
will have a bench where persons can sit. Ground level outdoor speakers will be
March 8, 2018
ITEM NO.: A (Cont.) FILE NO.: Z-9291
4
placed at each prayer-meditation area and will play easy listening instrumental
music which can be heard only upon entering the prayer garden and sitting at
one of the benches. Several signs will be placed through at the garden, directing
persons to the various prayer stations such as “Love”, “Temperance”, “Pathway
to Joy”, “Pathway to Faith” and “Pathway to Peace”. Additional signage will be
placed at the corners of the property identifying it as the Throne of Grace Prayer
Garden. Lighting will be placed throughout the property to illuminate the various
signs. Additional lighting is provided by existing street lights. The property will
not be fenced. In addition to the storage of lawn maintenance equipment, the
small storage building will contain the equipment for the music. The applicant
states a camera security system will be established so that activity at the prayer
garden can be monitored. The gazebo structure will be utilized by students of
Word of Outreach Christian Center, their parents and invited guests for various
gatherings, fellowshipping and corporate prayer.
While staff is certainly supportive of Word of Outreach’s desire to positively
impact and improve the lives of persons in their community, there are concerns
with the specifics of this prayer garden use. The property is located in an area
that has a substantial amount of transient foot traffic. The concern is that this
proposed open-air, fully accessible garden could become a draw for loitering
which could negatively impact the adjacent residential neighborhood. The site is
unfenced and accessible 24 hours a day, illuminated throughout the night and
contains benches and the gazebo; all of which could contribute to a potential
loitering problem. The proposed camera monitoring of the site is not sufficient to
alleviate this concern.
STAFF RECOMMENDATION:
Staff recommends denial.
PLANNING COMMISSION ACTION: (JANUARY 25, 2018)
The applicants were present. There were several persons present, both in
support and in opposition. Letters of opposition had been received from the Love
and Goodwill Neighborhood Associations. Staff presented the item and a
recommendation of denial.
Aaron Agnew, of 3411 Asher Avenue stated he had maintained this vacant lot for
years and the proposed prayer garden would be good for the neighborhood.
Dowell Evans, of P. O. Box 84 College Station, stated he supported the prayer
garden and he thought it would benefit the neighborhood.
March 8, 2018
ITEM NO.: A (Cont.) FILE NO.: Z-9291
5
Sedalia Gouley, President of the Goodwill Neighborhood Association, stated the
association was opposed. He noted the close proximity of the Compassion
Center and the Pulaski County jail. He stated the prayer garden would attract
loitering and transients which was already a problem in the neighborhood.
Mr. Gouley stated there was no security planned for the site.
Robert Webb stated he was supportive of anything positive for the neighborhood
but, right now, the prayer garden was not right for the neighborhood.
Robert Smith, of 2600 Brown Street, Pastor of Word of Outreach, spoke in
support. He stated they were aware of the problems in the neighborhood. He
stated Word of Outreach was praying for the neighborhood on a daily basis and
they know prayer works. He stated he did not understand why anyone would not
want a prayer garden. He described his ministry and work in the neighborhood
and asked the commission not to turn down a prayer garden.
The applicant, Carolyn Smith, spoke and referenced a letter and information
about the garden that she had provided the commission. She described the
work of her ministry in addressing problems in the neighborhood. A lady whom
the ministry had served described how the ministry had helped her turn her life
around. Mrs. Smith Stated they would install and fence and gate with a lock
to secure the property. She stated persons were already loitering in the
neighborhood and the activity of the prayer garden would reduce the loitering.
She said the site would be monitored by a camera system and lighting can be
adjusted to address any concerns.
Commissioner Thomas asked what the hours of access would be. She stated
she supported the proposal but had some concerns.
Director of Planning Jamie Collins suggested deferring the item to allow the
applicant an opportunity to submit her proposed amendments and to allow for
staff review of those amendments.
Commissioner May suggested the applicant consider a deferral to work with staff.
Mrs. Smith agreed and stated she wished to defer the item. A motion was made
to defer the item to the March 8, 2018 meeting. The motion was seconded and
approved by a vote of 10 ayes, 0 noes and 1 absent.
STAFF UPDATE:
In response to concerns raised at the January 25, 2018 Commission meeting, the
applicant has submitted the following amendments to her application.
March 8, 2018
ITEM NO.: A (Cont.) FILE NO.: Z-9291
6
1. Fencing and an entrance gate with a lock will be placed around the prayer
garden.
2. The normal hours of operation for the prayer garden will be 8:00 a.m. –
8:00 p.m. daily.
3. There will be no additional lighting placed in the prayer garden. There is an
existing night light from Entergy which comes on in the night and goes off in
the morning.
4. The sound system will only function during the hours the prayer garden
is open.
5. No benches, chairs, etc. … will be placed in the garden until a fence (with gate
and lock) has been erected around the garden.
6. The prayer garden will not be available for general public use until a fence with
a lock has been installed. Until such time, the applicant will keep the grounds
of the prayer garden neat and clean and will begin planting trees, shrubs,
plants, herbs and flowers.
7. If any Word of Outreach students, parents or staff desire to visit the prayer
garden (prior to installation of the fence and other improvements) they will
have to bring their own chairs, if they plan to sit. When they leave, the y will
take their chairs with them.
Staff believes the applicant has addressed the concerns that were previously
raised concerning access to the site. No improvements will be placed in or
constructed in the prayer garden (other than landscaping) prior to installation of
the fence and gate, with lock.
STAFF RECOMMENDATION (REVISED):
Staff recommends approval of the CUP, as amended, subject to the following
conditions:
1. Compliance with the comments and conditions outlined in Sections 4, 5 and 6
of the agenda Staff Report.
2. There are to be no improvements placed in or constructed in the prayer
garden, other than landscaping, prior to the erection of a perimeter fence with
gate and lock.
March 8, 2018
ITEM NO.: A (Cont.) FILE NO.: Z-9291
7
PLANNING COMMISSION ACTION: (MARCH 8, 2018)
The applicant was present. There was one (1) objector present. Staff
presented the item and informed the commission that the applicant had
submitted amendments to the application as outlined in the “staff update” above.
Staff read the amendments and clarified a couple of them. It was noted that the
fence described in amendment No. 1 would be a six (6) foot tall privacy fence
on the west perimeter and along a portion of the north and south perimeters and
a five (5) foot tall chain link or decorative wrought iron type fence between two
(2) foot square brick columns along the east perimeter and the remainder of the
north and south perimeters. The gate is to be on the east perimeter. A graphic
had been submitted by the applicant depicting the proposed fence. Staff also
clarified that amendment No. 4 also included the condition that no sound
produced by the sound system is to be heard outside of the confines of the
prayer garden.
Staff recommended approval of the application as amended subject to compliance
with the following conditions:
1. Compliance with the comments and conditions outlined in Sections 4, 5
and 6 of the agenda staff report.
2. There are to be no improvements placed in or constructed in the prayer
garden, other than landscaping, prior to erection of the perime ter fence
with gate and lock.
Dr. Carolyn Smith, the applicant, reserved her time to respond to any issues
which might be raised by the objector.
Donald Mitchell, of 2614 Brown Street, stated he was opposed to the prayer
garden. He said Word of Outreach had church facilities three (3) blocks away
that could be used to congregate and pray.
Dr. Smith stated the prayer garden was an extension of the church’s ministry. She
stated the church wanted to reach outside of the building, into the community. Sh e
described the work of the church in the neighborhood. Dr. Smith commented that
other parks in the city were not fenced and gated.
In response to questions from Commissioners Hamilton and Finney, Dr. Smith
stated the prayer garden was open to the public and there would be no cameras.
Referring to construction of the fence, Mr. Mitchell stated it takes the church a
long time to do anything. Chairman Berry responded that the prayer garden could
not be used until the fence was constructed, no matter how long it took.
March 8, 2018
ITEM NO.: A (Cont.) FILE NO.: Z-9291
8
Commissioner Laha commented that it thought the prayer garden should close
prior to 8:00 p. m., as proposed. Several other commissioners commented that
they had no problem with the hours proposed by Dr. Smith.
There being no further discussion, a motion was made to approve the application,
as amended and including all staff comments and conditions. The motion was
seconded and approved by a vote of 8 ayes, 1 no and 2 absent.
March 8, 2018
ITEM NO.: 1 FILE NO.: Z-5253-A
NAME: Scott Field Improvements at Forest Heights Middle
School – Conditional Use Permit
LOCATION: 5901 Evergreen
OWNER/APPLICANT: Little Rock School District/Crafton Tull, Authorized
Agent
PROPOSAL: A conditional use permit is requested to allow for
improvements to the existing athletic field located on
this R-2 zoned, 10 acre, public school campus.
1. SITE LOCATION:
The school campus is located on the south side of Evergreen Drive, just
east of N. University Avenue. The athletic field is located on the south
side of the campus, north of H Street.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The school campus (and athletic field) has existed at this location since
1955. The properties across Evergreen to the north are occupied by office
uses and condominiums/multifamily. Office uses and University Avenue
are adjacent to the west. A single family residential neighborhood extends
to the east. Office uses, a CALS branch and a single family neighborhood
are located to the south. Staff believes the propose d plan to make
improvements to the existing athletic field should not affect the school’s
continued compatibility with the neighborhood.
Notice of the public hearing was sent to all owners of properties located
within 200 feet of the site and the Hillcrest, Hall High and Evergreen
Neighborhood Associations.
3. ON SITE DRIVES AND PARKING:
The campus contains parking lots with access off of N. Fillmore Street and
Evergreen Drive. The bus drop off/pick up is located off of Evergreen in
front of the school. No changes are proposed to the parking and drives. No
changes are proposed to the campus or buildings that would affect the
parking requirement.
March 8, 2018
ITEM NO.: 1 (Cont.) FILE NO.: Z-5253-A
2
4. SCREENING AND BUFFERS:
Site plan must comply with the City’s minimal landscape and buffer
ordinance requirements.
Street buffers will be required at six (6) percent of the average depth of
the lot. The minimum dimension shall be one-half (½) the full width
requirement but in no case less than nine (9) feet. Buffers are to be
landscaped at the rate of one (1) tree and three (3) shrubs for every thirty
(30) linear feet.
Install the required plant materials adjacent to the N Fillmore St and H St
right-of-ways.
A landscape irrigation system shall be required for developments of one
(1) acre or larger.
The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
5. PUBLIC WORKS:
1. Provide a survey of the property to determine if the adjacent right-of-
way widths are sufficient.
2. Damage to public and private property due to hauling operations or
operation of construction related equipment from a nearby
construction site shall be repaired by the responsible party prior to
issuance of a certificate of occupancy.
3. A concrete driveway apron should be constructed at the existing
driveway off Fillmore Street near the southeast corner of the
property.
All driveways shall be concrete aprons and constructed per ADA
recommendations per City Ordinance.
4. An appropriate handicap ramps should be constructed compliant
with ADA recommendations at the intersection of Fillmore Street and
H Street in accordance with Sec. 31-175 of the Little Rock Code and
City of Little Rock standard details.
5. An appropriate handicap ramps should be reconstructed at I Street
and Fillmore Street in conformance with ADA recommendation in
accordance with Sec. 31-175 of the Little Rock Code and the City of
Little Rock standard details.
March 8, 2018
ITEM NO.: 1 (Cont.) FILE NO.: Z-5253-A
3
6. The sidewalk adjacent to Fillmore Street at obstruction locations such
as power poles should be examined for conformance with ADA
recommendations. If the sidewalk at those locations do not conform,
construction of additional sidewalk width is required.
7. Sidewalks with appropriate handicap ramps should be constructed
adjacent to H Street and connect with the existing sidewalk to the
east and west in accordance with Sec. 31-175 of the Little Rock
Code and the Master Street Plan.
8. Repair or replace any curb and gutter or sidewalk that is damaged in
the public right-of-way prior to occupancy.
9. It appears the only ADA accessible path to the field is from driveway
on Evergreen Drive closest to University Avenue. An ADA
accessible path should be provided to the football field entrance gate.
10. Prior to construction of retaining walls that exceeds 4 ft. tall, an
engineer's certification of design and plans must be submitted to
Public Works for approval. After construction, an as-built certification
is required for construction of the retaining wall.
6. UTILITIES AND FIRE DEPARTMENT/BUILDING CODES:
Little Rock Reclamation Authority: Grease Interceptor analysis required
for concession stand
Entergy: Entergy does not object to this proposal. There do not appear to
be any conflicts with existing electrical utilities at the location of the
proposed construction/renovation. However, there is an existing three
phase, overhead power line running along H Street in the vicinity of the
new aluminum bleachers and press box. Extreme caution should be used
to maintain proper clearance from this new installation and the overhead
power lines. Also, the 6’ vinyl coated chain link fence being installed at
the NW corner of this project appears to be near an existing overhead
power line. Again, care should be used to maintain proper clearances.
Contact Entergy in advance to discuss electrical service requirements, or
adjustments to existing facilities (if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT&T: No comment received.
Central Arkansas Water: No objection.
Fire Department: Full plan review
March 8, 2018
ITEM NO.: 1 (Cont.) FILE NO.: Z-5253-A
4
Building Codes: Project is subject to full commercial plan review and
approval prior to issuance of a building permit. For information on
submittal requirements and the review process, contact a commercial
plans examiner:
Curtis Richey at 501.371.4724; crichey@littlerock.gov
7. TRANSPORTATION/PLANNING:
County Planning: No comments.
Rock Region METRO: A bus route is located along University Avenue,
west of this site.
Planning Division: No comments received.
SUBDIVISION COMMITTEE COMMENT: (FEBRUARY 14, 2018)
Frank Riggins of Crafton Tull was present representing the application. Staff
presented the item and outlined the proposed improvements to Scott Field. The
applicant was asked to provide information on any new signage and to indicate
the dumpster location, if one was proposed. Staff asked the applicant to provide
the height of the proposed new visitor bleachers and press box. In response to a
question, the applicant stated there would be no security wire (barbed wire)
placed atop the new fencing. Staff asked if new or additional loud speakers
would be installed for the benefit of the new visitor seating. The applicant was
asked to locate and describe any new loud speakers and to indicate measures to
assure that sound is directed into the field and not the adjacent neighborhood
across H Street.
Public Works Comments were discussed; particularly the issues of sidewalk
installation and ADA access. The applicant was advised to work with staff to
address these issues. Landscape comments were presented. Other Agency
Comments were noted.
The applicant was advised to submit responses to staff issues by February 21,
2018. The Committee forwarded the item to the full Commission.
STAFF ANALYSIS:
Forest Heights STEM Academy (Forest Heights Middle School) was constructed
on this 10 acre site in 1955. The building was subsequently e xpanded in 2008
and 2009. The school building is located on the north half of the site, adjacent to
March 8, 2018
ITEM NO.: 1 (Cont.) FILE NO.: Z-5253-A
5
Evergreen Drive. The athletic field (Scott Field) occupies the southern half of the
site, adjacent to H Street. The Little Rock School District is requesting approval
of a conditional use permit to allow for various improvements to Scott Field. The
specific improvements are as follow:
1. Service driveway and delivery area improvements.
2. Site drainage improvements
3. Renovation of the existing press box, concession stand, and ticket booth.
4. Creation of a spectator concourse and entry plaza
5. New perimeter fencing (6’ vinyl coated chain link to replace existing chain
link)
6. Renovation of existing bleacher seats
7. Install artificial turf on the football field.
8. Install a new surface on the existing asphalt track and add facilities such as
high jump and pole vault.
9. A new visitor concession/restroom building
10. New visitor bleachers and press box
No expansion of the athletic field area is proposed. All improvements will occur
within the existing athletic field area. No changes are proposed to the other
facilities on the campus. The field has existing lighting for night play. All field
lighting will remain.
The applicant submitted responses to the issues raised at Subdivisi on Committee.
The only new sign will be located on the fabric screen to hide the underside of the
new bleachers on the south side of the field. The screen will face H Street. The
image will read “Scott Field”. No new dumpsters are included in this project.
There are no new loudspeakers included in this project. The bleachers and press
box on the south side of the field will be 22 ft. ± above the track. Since the grade
slopes down from the field towards H Street, an 11 ft. tall retaining wall will be built
to contain fill to support the bleachers and press box. No security wire will be
attached to the new perimeter fence.
The applicant has stated they will comply with all staff comments and conditions,
save one. The District is requesting a deferral of the construction of a sidewalk
along H Street until the next major phase of construction at the school. It is
anticipated that the next phase of construction will be located on the large field
west of the athletic field. There is no time frame for the next phase of construction.
Staff supports that deferral request.
March 8, 2018
ITEM NO.: 1 (Cont.) FILE NO.: Z-5253-A
6
To staff’s knowledge, there are no outstanding issues. There is no bill of
assurance for this acreage tract.
STAFF RECOMMENDATION:
Staff recommends approval of the requested CUP subject to compliance with the
comments and conditions outlined in Sections 4, 5 and 6 of the agenda staff report.
Staff recommends approval of the request to defer sidewalk construction on the
H Street perimeter until the next major phase of construction.
PLANNING COMMISSION ACTION: (MARCH 8, 2018)
The applicants were present. There were no objectors present. Staff
presented the item and a recommendation of approval as outlined in the “staff
recommendation” above. There was no further discussion. The item was placed
on the consent agenda and approved as recommended by staff, including all
staff comments and conditions. The vote was 9 ayes, 0 noes and 2 absent.
March 8, 2018
ITEM NO.: 2 FILE NO.: Z-7935-C
NAME: Vedant Society of Arkansas – Revised Conditional
Use Permit
LOCATION: 10224 Nash Lane
OWNER/APPLICANT: Vedant Society of Arkansas
PROPOSAL: A revision to the previously approved conditional use
permit is requested to allow for the phased expansion
of parking and facilities for the Vedant Society
Religious and Cultural Center located on this R-2
zoned, 5.76± acre tract.
1. SITE LOCATION:
The property is located on the west side of Nash Lane, one lot north of
Mabelvale West Road.
2. COMPATIBILITY WITH NEIGHBORHOOD:
The Vedant Society has occupied this site since late 2005. A 2006 and
2017 revision to the CUP indicated a new parking lot and an area set
aside for a future, new building. Two churches are located just south of
this site, on either side of Nash Lane at Mabelvale West Road. Other
uses in the area include a third church, a U.S. Post Office and a LRSD
school campus. Areas of undeveloped commercial and industrial
properties are located south of Mabelvale West Road. Single family
homes are located to the north, east and west. Continued use of the
property, including the proposed new buildings and parking, should be
compatible with the neighborhood.
Notice of the public hearing was sent to all owners of properties located
within 200 feet of the site and the SWLR United for Progress and Pinedale
Neighborhood Associations.
3. ON SITE DRIVES AND PARKING:
The site is occupied by a single, 4,495 square foot building and a small
area of parking. Access is via a single driveway off of Nash Lane .
Proposed new areas of parking are to be constructed in three (3) phases
to coincide with the phased construction of new buildings. A 50 -space
parking lot is to be constructed in conjunction with the Phase I temple
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
2
building. With this phase, a new driveway will be constructed near the
south perimeter of the site.
An additional 20 spaces will be constructed with the Phase II community
center expansion of the Phase I building. An additional 41-space parking
area will be constructed in conjunction with the Phase IV construction of a
fellowship/gymnasium building. All parking will be paved and landscaped
at the time of construction to comply with code requirements. Required
improvements to Nash Lane will be done in 2 phases to coincide with the
Phase 1 and Phase III building construction.
4. SCREENING AND BUFFERS:
Site plan must comply with the City’s minimal landscape and buffer
ordinance requirements.
Street buffers will be required at six (6) percent of the average depth of the
lot. The minimum dimension shall be one-half (½) the full width requirement
but in no case less than nine (9) feet. The maximum dimension required
shall be fifty (50) feet. In addition to the required screening, buffers are to
be landscaped at the rate of one (1) tree and three (3) shrubs for every
thirty (30) linear feet.
Screening requirements will need to be met for the vehicular use areas
adjacent to street right-of-ways. Provide screening shrubs with an average
linear spacing of not less at three (3) feet within the required landscape
area. Provide trees with an average linear spacing of not less than thirty
(30) feet.
A land use buffer six (6) percent of the average width / depth of the lot will
be required when an adjacent property has a dissimilar use of a more
restrictive nature. The property to the west is zoned R2. The maximum
dimension required shall be fifty (50) feet. The minimum dimension shall
be one-half (½) the full width requirement but in no case less than nine
(9) feet as a component of all land use buffer requirements, opaque
screening, whether a fence or other device, a minimum of six (6) feet
in height shall be required upon the property line side of the buffer.
A minimum of seventy (70) percent of the land use buffer shall be
undisturbed. Easements cannot count toward fulfilling this requirement.
In addition to the required screening, buffers are to be landscaped at the
rate of one (1) tree and three (3) shrubs for every thirty (30) linear feet.
A perimeter planting strip is required along any side of a vehicular use
area that abuts adjoining property, or the right-of-way of any street. This
strip shall be at least nine (9) feet wide. One (1) tree and three (3) shrubs
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
3
or vines shall be planted for every thirty (30) linear feet of perimeter
planting strip.
Building landscape areas shall be provided at the rate equivalent to
planter strip three (3) feet wide along the vehicular use area. One
(1) tree and four (4) shrubs shall be planted in the building landscape
areas for each forty (40) linear feet of vehicular use area abutting the
building.
Eight percent (8%) of the vehicular use area must be designated for
green space; this green space needs to be evenly distributed throughout
the parking area(s). The minimum size of an interior landscape area shall
be one hundred fifty (150) square feet for developments with one hundred
fifty (150) or fewer parking spaces. Interior islands must be a minimum
of seven and one half (7 1/2) feet in width. Trees shall be included in the
interior landscape areas at the rate of one (1) tree for every twelve (12)
parking spaces.
A landscape irrigation system shall be required for developments of one
(1) acre or larger.
The development of two (2) acres or more requires the landscape plan to
be stamped with the seal of a Registered Landscape Architect.
The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
5. PUBLIC WORKS:
1. Nash Lane is classified on the Master Street Plan as a collector street.
A dedication of right-of-way 30 feet from centerline will be required.
The dedication should be made along the entire frontage of the
property with phase 1 construction.
2. With site development, provide design of street conforming to the
Master Street Plan. Construct one-half street improvement to Nash
Lane including 5-foot sidewalks with planned development. The new
back of curb should be placed at the same width as the existing
street improvements to the south with that street width maintained
adjacent to the subject property.
3. Repair or replace any curb and gutter or sidewalk that is damaged in
the public right-of-way prior to occupancy.
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
4
4. A grading permit in accordance with section 29-186 (c) & (d) will be
required prior to any land clearing or grading activities at the site.
Other than residential subdivisions, site grading and drainage plans
must be submitted and approved prior to the start of construction. Is
a variance being requested to advance grade future phases with
construction of the first phase?
5. Storm water detention ordinance applies to this property. Show
the proposed location for stormwater detention facilities on the
plan. Maintenance of the detention pond and all private drainage
improvements is the responsibility of the developer and/or property
owner.
6. If disturbed area is 1 or more acres, obtain a NPDES storm water
permit from the Arkansas Department of Environmental Quality prior
to the start of construction.
7. In accordance with Section 31-176, floodway areas must be shown
as floodway easements or be dedicated to the public. In addition, a
25 foot wide drainage and access easement is required adjacent to
the floodway boundary.
8. A special Grading Permit for Flood Hazard Areas will be required per
Sec. 8-283 prior to construction.
9. The minimum Finish Floor elevation of at least 1 ft. above the base
flood elevation is required to be shown on plat and grading plans.
10. Street lights are required by Section 31-403 of the LR code. Provide
plans for approval to Traffic Engineering. Street lights must be
installed prior to platting/certificate of occupancy. Contact Traffic
Engineering 379-1813 (Greg Simmons) for more info.
11. Hauling of fill material on or off site over municipal streets and roads
requires approval prior to a grading permit being issued. Contact
Public Works Traffic Engineering at 621 S. Broadway, (501) 379-1805
(Travis Herbner) for more information.
12. All driveways shall be concrete aprons per City Ordinance.
13. Damage to public and private property due to hauling operations or
operation of construction related equipment from a nearby
construction site shall be repaired by the responsible party prior to
issuance of a certificate of occupancy.
14. With construction of the south driveway and the Phase 1 street
construction, the existing fence should be relocated out of the
right-of-way.
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
5
15. If manual gates are proposed, the gates should be located no closer
than 20 ft. from the back of curb. If a remote gate is proposed, the
gate call box should be located at least 30 ft. from back of curb and a
turnaround should be provided.
16. With construction of Phase 1 the existing fence should be removed
from the floodway due to it obstructing flows.
6. UTILITIES AND FIRE DEPARTMENT/BUILDING CODES:
Little Rock Water Reclamation Authority: Sewer Available to this site.
Entergy: Entergy does not object to this proposal. There do not appear to
be any conflicts with existing electrical utilities at this location. There is an
existing three phase, overhead power line currently installed on the east
side of Nash Lane which provides service to the north side of this property
to the existing structures. Contact Entergy in advance to discuss electrical
service requirements, or adjustments to existing facilities (if any) as this
project proceeds.
Centerpoint Energy: No comments received.
AT&T: No comments received.
Central Arkansas Water: No objection.
Fire Department:
Full plan review
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is
located on a fire apparatus access road, the minimum road width shall be
26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire
apparatus access roads shall not exceed 10 percent in grade except as
approved by the fire chief.
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
6
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and
loading. Facilities, buildings or portions of buildings hereafter constructed
shall be accessible to fire department apparatus by way of an approved
fire apparatus access road with an asphalt, concrete or other approved
driving surface capable of supporting the imposed load of fire apparatus
weighing at least 75,000 pounds.
Commercial and Industrial Developments – 2 means of access. –
Maintain fire apparatus access roads as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1
Section D104.1 Buildings exceeding three stories or 30 feet in height.
Building or facilities exceeding 30 feet or three stories in height shall have
at least two means of fire apparatus access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area.
Buildings or facilities having a gross building area of more than 62,000
square feet shall be provide with two separate and approved fire
apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square
feet that have a single approved fire apparatus access road when all
building are equipped throughout with approved automatic sprinkler
systems.
D104.3 Remoteness. Where two fire apparatus access roads are
required, they shall be placed a distance apart equal to not less than one
half of the length of the maximum overall diagonal dimension of the lot or
area to be served, measured in a straight line between accesses.
Gates
Maintain fire apparatus access road gates as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire
apparatus access road gates. Gates securing the fire apparatus
access roads shall comply with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation
by one person.
4. Gate components shall be maintained in an operable condition at all
times and replaces or repaired when defective.
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
7
5. Electric gates shall be equipped with a means of opening the gate by
fire department personnel for emergency access. Emergency opening
devices shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and
padlock unless they are capable of being opened by means of forcible
entry tools or when a key box containing the keys to the lock is
installed at the gate location.
7. Locking device specifications shall be submitted for approval by the fire
code official
8. Electric gate operators, where provided, shall be listed in accordance
with UL 325.
9. Gates, intended for automatic operation shall be designe d, constructed
and installed to comply with requirements of ASTM F 2200.
30’ Tall Buildings - Maintain aerial fire apparatus access roads as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1
Section D105.1 – D105.4
D105.1 Where Required. Where the vertical distance between the
grade plane and the highest roof surface exceed 30’, approved aerial fire
apparatus access roads shall be provided. For the purposes of this section
the highest roof surfaces shall be determined by measurement to the eave
of a pitched roof, the intersection of a roof to the exterior wall, or the top of
the parapet walls, whichever is greater.
D105.2 Width. Aerial fire apparatus access roads shall have a
minimum unobstructed with of 26’, exclusive of shoulders, in the
immediate vicinity of the building or portion thereof.
D105.3 Proximity to building. At least one of the required access
routes meeting this condition shall be located within a minimum of 15 feet
and a maximum of 30 feet from the building, and shall be positioned
parallel to one entire side of the building. The side of the building on which
the aerial fire apparatus access road is positioned shall be approved by
the fire code official.
D105.4 Obstructions. Overhead utility and power lines shall not be
located over the aerial fire apparatus access road or between the aerial
fire apparatus road and the building. Other obstructions shall be permitted
to be places with the approval of the fire code official.
Dead Ends.
Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1
Section D103.4 Dead Ends. Dead-end fire apparatus access roads in
excess of 150 feet shall be provided with width and turnaround provisions
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
8
in accordance with Table D103.4. Requirements for Dead-end fire
apparatus access roads.
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 – C105, in conjunction with Central
Arkansas Water (Daniel Tull 501-377-1245) and the Little Rock Fire
Marshal’s Office (Capt. Tony Rhodes 501-918-3757 or Capt. John Hogue
501-918-3754). Number and Distribution of Fire Hydrants as per Table
C105.1.
Regards, Captain Rhodes and Captain Hogue
Office: 918-3710
Building Codes: Project is subject to full commercial plan review and
approval prior to issuance of a building permit. For information on
submittal requirements and the review process, contact a commercial
plans examiner:
Curtis Richey at 501.371.4724; crichey@littlerock.gov
7. TRANSPORTATION/PLANNING:
County Planning: No comments received.
Rock Region METRO: The site is not located on a bus route.
Planning Division: No comments.
SUBDIVISION COMMITTEE COMMENT: (FEBRUARY 14, 2018)
Terry Burruss, architect, was present representing the application. Staff
presented the item and outlined the changes from the December 14, 2017
approved CUP. Staff noted there was some additional site plan – related
information needed. In response to a question, Mr. Burruss stated the parking
would be paved and landscaped as it was constructed; that no deferral of the
paving requirement was requested.
Public Works Comments were discussed. Staff noted particularly the
requirement to remove the fencing from the Nash Lane right-of-way and the
floodway. Landscape Comments were presented and discussed. Other Agency
Comments were noted.
The applicant was advised to submit responses to staff comments no later than
February 21, 2018. The Committee forwarded the item to the full Commission.
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
9
STAFF ANALYSIS:
The Vedant Society of Arkansas occupied the R-2 zoned, 5.76 acre tract located
at 10224 Nash Lane. On October 13, 2005, the Commission approved a
conditional use permit to allow the Society to use the existing residential structure
for a place of worship and Indian cultural activities. Occupancy was proposed for
40 persons. The existing driveway was to be widened and 10 parking spaces
provided.
On November 9, 2006, a revision to the CUP was approved to allow for an
increase to 200 persons. Associated with this increase, the Society proposed
constructing a 51-space parking lots on the southern portion of the property.
A space for a future building was indicated near the middle of the site, between
the proposed parking lot and the existing residential structure. A 24-month
deferral of the paving requirement for the new parking lot was approved. That
development did not occur and neither the parking lot nor the new building
were constructed.
On December 14, 2017, a revision to the CUP was approved to allow for the
phased development of new facilities and parking. The approval allowed for
construction of a single 20,000 square foot building containing various use areas,
including a worship center with a capacity of 408 persons. A 100-space parking
lot was approved. The development was proposed in 3 phases. Phase I was
to consist of constructing a gravel parking lot near the middle of the site. A
24-month deferral of the paving and landscaping requ irement for the new parking
lot was approved. Phase II was to consist of paving and landscaping the parking
lot. Phase III was construction of the new building. It was possible that Phases II
and Phases III could occur together. Phase III also consiste d of a second
driveway off of Nash Lane, with a small area of additional parking and a drop-off
area. The Commission approved an advance grading request to allow grading of
the new building pad with the grading of the parking area. The Commission
approved a deferral of boundary street improvements to Nash Lane until Phase III
(new building).
The Society is now requesting a revision to the CUP approved on December 14.
In lieu of a single, 20,000 square foot building, the Society is proposing four (4)
phases of building construction utilizing two (2) new buildings rather than one (1).
Parking is proposed to be built in three (3) phases and the parking will be paved
and landscaped as it is constructed. Improvements to Nash Lane will still be done
in two (2) phases.
Phase I will consist of a 4,750 square foot building and a 50 -space parking lot,
with a new driveway on Nash Lane. The building will contain worship space and
room for support uses including a kitchen and restrooms. The Society currently
has about 30 regularly-attending members. Once the new building is
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
10
constructed, attendance at the facility is anticipated to be 6 – 10 persons during
weekdays and 15 – 20 persons on weekends. For bigger celebrations, which
occur 3 – 4 times a year, attendance could reach 100 – 150 persons. The new,
50-space parking lot will be paved and landscaped at the time it is constructed.
Half-street improvements to Nash Lane will be constructed from the south
property line to approximately 50 feet north of the new driveway.
Phase II is a 4,000 square foot addition to the Phase I building. The new space
will primarily be used only for Indian Community Special occasions once a month
which will have 50 – 100 persons in attendance. The parking lot will be expanded
by an additional 20 spaces.
Phase III will consist of a second, 6,400 square foot building. This building will
contain a Temple Yoga and Meditation Center. At that point, membership is
expected to increase to 150 persons and the larger temple is required. A final
addition of 40± parking spaces is indicated. Those spaces may be constructed in
two (2) phases or all at once. Under Phase III, the remainder of half-street
improvements to Nash Lane will be constructed.
Phase IV consists of a 6,500 square foot addition to the Phase III building. The
addition will contain a gymnasium/fellowship space. If the Phase III parking is
split into phases, the final parking will be constructed with the Phase IV addition.
The existing residential structure will be utilized as housing for the priest.
Signage will comply with that allowed in office and institutional zones. A ground
mounted sign may utilize an LED electronic message center. Pole lighting will be
provided with parking lot construction. Pathway, landscape and building lighting is
planned. All lighting will be low-level and directional, shielded downward and into
the site. The dumpster location has been indicated on the plan. Screening will be
installed to comply with code requirements. The site is enclosed with a chain-link
fence. The fencing will be replaced during the various phases. A metal picket-
type fence will be placed along the street frontage. Epoxy coated chain -link will
be used for fencing along the sides and rear of the site. If gates are installed on
the driveways, the applicant will comply with Public Works Comments regarding
placement and operation.
The buildings will not exceed the allowable height of 35 feet for structures in the
R-2 district. Gopurams (similar to minarets) will be additional 12 – 16 feet in
height.
No formal outside use areas are proposed. No additional uses such as day care
or private school are proposed.
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
11
The applicant has stated they will comply with all proposed staff comments and
conditions. To staff’s knowledge, there are no outstanding issues and staff is
supportive of the proposed revision to the approved conditional use permit. There
is no bill of assurance for this acreage tract.
The applicant is requesting approval to advance grade the site in conjunction with
the Phase I building and parking lot. The applicant is also requesting approval of
a waiver of the buffer requirement on the west perimeter of the site due to the
presence of a large area of floodway on that perimeter. Staff is supportive of both
requests.
36-108. (c) (CUP conditions) states:
(c) Conditions may include time limits for exercise of authorization.
However, the maximum allowable time shall be three (3) years from the date
of approval. Required permits must be obtained within the allotted period,
unless an extension of time is granted by the commission. Otherwise, the
conditional use permit approval shall be considered void.
In an approved multiple-phased development, any phases for which
the required permits have not been obtained within three (3) years of the date
of approval must be reviewed and approved by the Planning Commission in
the same manner as established for the initial conditional use review.
STAFF RECOMMENDATION:
Staff recommends approval of the requested CUP su bject to compliance with the
following conditions:
1. Compliance with the comments and conditions outlined in Sections 4, 5 and 6
of the agenda staff report.
2. Dumpster service hours are to be limited to 7:00 a.m. – 6:00 p.m., Monday
through Friday.
Staff recommends approval of the advance grading request.
Staff recommends approval of a waiver of the buffer requirement on the west
perimeter of the site due to the floodway.
March 8, 2018
ITEM NO.: 2 (Cont.) FILE NO.: Z-7935-C
12
PLANNING COMMISSION ACTION: (MARCH 8, 2018)
The applicants were present. There were no objectors present. Staff
presented the item and a recommendation of approval as outlined in the “staff
recommendation” above. There was no further discussion. The item was placed
on the consent agenda and approved as recommended by staff, incl uding all
staff comments and conditions. The vote was 9 ayes, 0 noes and 2 absent.
March 8, 2018
ITEM NO.: 3
Name: River Market Design Overlay District Revision (Sec. 36-350 through
Sec. 36-367).
Location: An area generally bounded by Riverfront Park, Interstate 30, Second
Street, and Cumberland Street.
Request: Revisions to the River Market Design Overlay District
Source: Staff and River Market Design Review Committee
STAFF RECOMMENDATION:
Staff recommends deferral of this item to the April 19, 2018 agenda.
PLANNING COMMISSION ACTION: (MARCH 8, 2018)
The item was approved on the consent agenda for deferral by a vote of 9 ayes 0 noes
and 2 absent.
DATE �ir°Cs1�0 /c
PLANNING
COMMISSION
VOTE
RECORD
MEMBER
`7
BERRY, CRAIG
BYNUM, BUELAH
COX, KEITH
'
a/
FINNEY, REBECCA
HAMILTON, SCOTT
HAYNES, MARLON D.
LAHA, TROY
LATTURE, PAUL
I
MAY, BILL B.
STEBBINS, ROBERT
THOMAS, DIANA M.
/
MEMBER
BERRY, CRAIG
BYNUM, BUELAH
COX, KEITH
FINNEY, REBECCA
HAMILTON, SCOTT
HAYNES, MARLON D.
LAHA, TROY
LATTURE, PAUL I
MAY, BILL B.
STEBBINS, ROBERT
THOMAS, DIANA -M.
Meeting Adjourned .2 i P.M.
AYE NAYE A _ABSENT . ABSTAIN �RECUSE
March 8, 2018
There being no further business before the Commission, the meeting
was adjourned at 4:23 p.m.
Date
Secretary Chairman