Loading...
pc_01 27 1987LITTLE ROCK PLANNING COMMISSION PLANNING HEARING MINUTE RECORD JANUARY 27, 1987 1 : 00 P. M. I.Roll Call and Finding of a Quorum A quorum was present being 8 in number. SUMMARY OF PLANNING ITEMS JANUARY 27, 1987 1.Excavation Ordinance 2.65th Street West District Plan 3.Highway 10 Plan Amendment 4.Master Street Plan Amendment January 27, 1987 PLANNING HEARING Item_No. 1_ �_ Land_ Alteration _Regulations,_Draft #6 NAME: City of Little Rock LC OA DN : Planning Jurisdiction of the City of Little Rock REQi1EST: Adoption of Draft #6 of the proposed Land Alteration Regulations STAFF-REPORT: The proposed land alteration regulations (commonly known as the excavation ordinance) have been prepared by City engineering and planning staff members to prevent excessive grading, clearing and filling which causes erosion, sedimentation, flooding, and slope instability problems and reduces the quality of life in Little Rock by destroying natural vegetation. Examples of problem areas may be seen on Rodney Parham Road at Reservoir Road, on Cantrell Road near Rebsamen Park Road, and on Highway 10 at Pleasant Ridge Road. The proposed regulations would control clearing and grading of sites for marketing purposes, which has been a major problem, and would provide the Planning Commission and Board of Directors with better information with which to evaluate development applications that are brought before them. The proposed land alteration regulations have been formulated through an extensive public involvement process including three separate mailings of different drafts to over 100 persons and groups in the community, meetings with contractor and neighborhood organizations, discussion at two Planning Commission retreats, and review by the Plans Committee of the Planning Commission. The requirements of the ordinance, which are very minor in nature, will not hamper development in Little Rock. The primary effects are that developers and contractors will merely be required to consider protective matters in advance and to take simple steps toward controlling erosion and preserving natural vegetation. In virtually all cases, it is anticipated that clearing, grading, and construction will still be able to proceed while giving attention to erosion control measures and, where appropriate, terracing cut areas and retaining certain areas of natural vegetation. Major provisions of the proposed regulations are: * Grading permits are required for the following activities in areas zoned or intended for commercial, industrial, office, multi - family or institutional use: - Cut or fill greater than 25 feet. - Grading, filling, cutting, quarrying, construction or similar activities involving more than 5 acres. - Clearing or cutting more than 25 large trees in an area greater than 2 acres in size. * A Sketch Grading and Drainage Plan is required with Planning Commission applications if any of the above activities are involved. STAFF_ RE MP4ENDATT ONi Staff recommends approval of Draft #6 PLANS COMMITTEE REVIEW (1- 20 -87) Staff showed slides and outlined revisions that had been made in Draft #6 to deal with comments made at the Planning Commission retreat and at the Plans Committee meeting in November, 1986. Comments received from the City Engineer and AP &L were also presented. The Chairman of the City Beautification Commission, Bob Callans, presented a letter containing suggested amendments to the regulations. Other persons present at the meeting included representatives of ARKLA Gas, the League of Women Voters, NOBLE, and the two newspapers. After discussion, Jerilyn Nicholson made a motion, seconded by Dorothy Arnett, to recommend approval of Draft #6 with the following amendments: 1. Elimination of exceptions for any development in the floodplain regardless of the size of the development. 2. Clarification of language to indicate that tree trimming by utilities would be included as part of a one -time permit. 3. Addition of provisions to allow landscape architects to prepare Sketch Grading and Drainage Plans. 4. Clarification of the one -time approval language to indicate that such an approval would be permanent in nature as long as the same procedures were followed. 5. On page 3, revision of Section B to have it apply to sites of more than two acres instead of more than five acres. Also, on page 5, Section C, revision of the exemption to have it apply to areas of two acres or less instead of five acres or less. 6. On page 12, section 5A.13, line 16, insertion of wording to require maintenance of grass and trees planted to restore land that has been illegally altered. The motion passed by a vote of 3 ayes (Sipes, Arnett, and Nicholson), 0 noes, and 1 absent (Jones). PLANNING COMMISSION ACTION: (1- 27 -87) Staff presented Draft #6 of the proposed Excavation Ordinance and outlined various amendments recommended by the Plans Committee and staff. David Jones indicated that he did not think that a landscape architect was qualified to prepare large scale grading and drainage plans. Bob Callans, Chairman of the City Beautiful Commission, indicated that landscape architects were qualified. Walter Riddick asked what had happened with the 1000 cubic yard standard. Gary Greeson explained that it had been eliminated because it would involve too many small projects. Mike Batie stated that a standard of 3000 cubic yards would be okay, but there would still be a problem of determining the amount after the fact. The hearing was officially opened and Kathleen Oleson, 7 Chelsea Road, noted that she worked with the Newcomers Club and that newcomers are attracted by the beauty of the area. She said that if we were not careful, Little Rock would not remain natural. Nancy Clark appeared on behalf of the Arkansas Conservation Coalition, noting that quality of life should be considered and that high tech industries pick locations based on high quality of life. Mariam Searcy read a letter requesting that the ordinance be made stronger. Linda Miller, First Vice President of the League of Women Voters, filed and read a statement supporting an excavation ordinance and requesting that the proposed draft be made more strict in a number of ways. Jim Pfeifer, submitted a petition from a group of 12 engineers and architects supporting draft #5 of the proposed ordinance. He noted that several of the persons signing the petition were concerned that the ordinance was not stronger. Andrea Jackson, 511 E. 8th, said the ordinance was not strong enough. Marc Johnson, Vice President of the Walton Heights - Candlewood Homeowners Association, indicated support for the excavation ordinance with modifications to make it more restrictive. He reviewed in detail various suggested amendments which were contained in a letter to the Commission. In answer to a question as to why the bond provision had been deleted, Gary Greeson explained that it was taken out because the fine was considered to be adequate and some people would have difficulty obtaining bonds. David Jones asked whether or not the excavation provisions would apply out in the county beyond the City limits. Gary Greeson indicated that the provisions would not apply unless there was an application to the Planning Commission. Donald Snow, President of the Walton Heights- Candlewood Homeowners Association noted that even with the staff recommended changes to draft #6, unsightly cuts could still occur. He suggested stronger enforcement provisions and other items contained in Marc Johnson's letter. Suzanne Hamilton, a West Little Rock resident, urged adoption of the ordinance with strengthening to deal with monitoring and enforcement. She asked that the Commission's vote be delayed to allow strengthening of the ordinance as suggested by the League of Women Voters. John Miller, an architect, expressed a need for more guidelines for preparation of plans. He said that the proposals would not be restrictive to a project. He said that a cubic yards standard was not needed, but that a percent of area disturbed was. He also expressed concern about enforcement, stating that the fines would not be enough. David Werling, President of NOBLE, appeared in favor of the ordinance, but questioned whether the provisions were adequate to achieve the purposes. He noted that 15 foot cuts would be dangerous to children and suggested a clearing standard of 10% for requirement of a grading plan. He reviewed an example of an area in West Little Rock and reviewed a drawing of soil loss on a building site, noting the cumulative effects. In answer to questions from David Jones, he commented on problems with a smaller site, his letter to the newspaper, and the Planning Commission not trying to resolve matters by making political concessions. In answer to a question from William Ketcher, he noted that a core group of 12 people in NOBLE had worked on the Excavation Ordinance. Bob Callans, Chairman of the City Beautiful Commission passed out a statement and examples of different slopes. He noted that most of their concerns had been addressed by staff. He read a memo which was submitted to the Commission. Merlin Seamon, representing the Arkansas Chapter of the American Society of Landscape Architects, supported the ordinance with the changes recommended by staff. He also asked that it be strengthened. He noted that he supported the recommendations of the City Beautiful Commission. In answer to a question from David Jones as to whether or not the ordinance would increase the volume of work for landscape architects, he said that it would not make a significant difference. The Commission then proceeded to discuss the ordinance. Jerilyn Nicholson reviewed the major differences brought up by persons at the hearing. In discussion of the review time for staff, Mike Batie indicated that he did not have a strong opinion one way or the other concerning 10 days versus 15 days. The Commission discussed 1000 cubic yards versus 3000 cubic yards as a review standard. Richard Massie indicated that he preferred 3000 cubic yards and Mike Batie agreed. Betty Sipes noted that the ordinance was not intended to catch developers, but to bring matters to the Commission's attention so that we would have better development. There was discussion concerning large tract residential builders. Joe White indicated that residential developers would not take out more trees than required. He said that he was in favor of the ordinance as amended by staff. He suggested that cuts 15 feet or greater needed regulation and stated that he preferred the 25% tree clearance standard as opposed to 10 %. David Jones noted that other than two or three glaring examples, the develop- ment community had done a pretty good job. Additional comments were made by Marc Johnson, David Werling, John Miller, and Bob Callans. Staff noted that drawings would be added to the drainage manual to provide more specific guidelines for professional persons preparing Grading and Drainage Plans. The Commission then reviewed draft #6 and the amendments recommended by staff. By unanimous consent, the proposed amendment on page 2 relating to the designated floodplain was accepted. With regard to page 3, Richard Massie made a motion, seconded by Jerilyn Nicholson, that in Section A the height of cut and fill be changed to 15 feet. The motion passed by a vote of 8 ayes and 1 no (Jones). Richard Massie made a motion that Section B on page 3 be left at 5 acres. The motion was seconded by Jerilyn Nicholson and passed by a vote of 7 ayes, 1 no (Ketcher) and 1 abstention (Jones). The proposed amendment at the bottom of page 3 referring to the subsections in that section was agreed upon by unanimous consent. Richard Massie made a motion that a new Section C relating to clearing or cutting trees be substituted as proposed by staff on page 3. The motion was seconded by Jerilyn Nicholson and passed by a vote of 8 ayes, 1 no. On page 4, the Commission agreed by unanimous consent to recommend the proposed amendments on that page relating to improved wording, tree trimming, and permanency of utility one -time approvals. The Commission discussed whether or not landscape architects should be allowed to prepare appropriate reports to justify a plan modification. The Commission voted 8 ayes and 1 no (Jones) to recommend allowing landscape architects on page 7 to prepare appropriate reports. With regard to page 8, after discussion, Walter Riddick made a motion that the amendment relating to terracing be approved, with insertion of the word "maximum" before the word "ratio ". The motion passed by a vote of 8 ayes, 0 noes and 1 abstention (Jones). The Commission agreed to accept by unanimous consent the amendment at the bottom of page 9 which was a followup to a previously approved amendment. Jerilyn Nicholson made a motion to approve the recommended amendments on page 10 relating to 150 cubic feet per second and measurement of the 25 foot strip from the top of the bank. The motion was seconded by Richard Massie and passed by a vote of 8 ayes and 1 no ( Riddick). Regarding page 12, David Jones noted that the City should be aware of the problems of trees dying in a particular area. Staff indicated that a property owner would not be penalized due to damage to trees resulting from Dutch Elm Disease or air pollution. Jerilyn Nicholson made a motion to insert the words "and maintaining" on page 12. The motion was seconded by Rose Collins and passed by a vote of 9 ayes and 0 noes. By unanimous consent, the Commission agreed to amendments on pages 14, 15, and 17 relating to landscape architects preparing plans and improvement of wording in the ordinance. The Commission discussed whether or not the staff review period should be increased to 15 days. Mike Batie indicated that staff could come back in a year to advise whether or not the 10 day review period was working or not. There was discussion of 3000 cubic yards versus 1000 cubic yards and Mike Batie recommended 3000 cubic yards as a standard. William Ketcher made a motion to insert a new Section D on page 3 to require a grading permit if more than 3000 cubic yards of cut and fill activity is involved. The motion was seconded by Walter Riddick and passed by a vote of 8 ayes, 0 noes and 1 abstention (Perkins). After discussion of the need for a performance bond, Jerilyn Nicholson expressed the Commission's appreciation for input from various members of the public. William Ketcher made a motion to recommend passage of the Excavation Ordinance as amended. The motion was seconded by Walter Riddick and passed by a vote of 8 ayes, 0 noes, and 1 abstention (Jones). ORDINANCE N0. _________________ AN ORDINANCE AMENDING ORDINANCE NO. 14,780 (STORMWATER MANAGEMENT AND DRAINAGE ORDINANCE) BY INSERTING A NEW ARTICLE 5A ESTABLISHING STANDARDS AND SPECIFICATIONS FOR CONTROL OF LAND ALTERATION ACTIVITIES INCLUDING GRADING, CUTS, FILLS AND CLEARING; ESTABLISHING THE PROCEDURE FOR APPROVING AND ISSUING PERMITS; PROVIDING SITE GRADING AND DRAINAGE PLAN GUIDELINES AND SPECIFICATIONS; AND FOR OTHER PURPOSES. BE IT ORDAINED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS. SECTION 1. That Ordinance No. 14,780 (Stormwater Management and Drainage Ordinance), enacted December 4, 1984, is hereby amended by adding thereto a new Article 5A reading as follows: ARTICLE 5A LAND ALTERATION REGULATIONS The City of Little Rock has in the past experienced development activity causing the displacement of large amounts of earth and tree cover. Significant problems resulting from such development have been flooding, soil erosion and sedimentation, unstable slopes, and impaired quality of life. These problems are a concern because of their negative effects on the safety and general welfare of the community. �Bs2__PvI &Q�s - The purposes of this Ordinance are to prevent excessive grading, clearing, filling, cutting or similar activities; to substantially reduce flooding, 1 2 3 4 5 erosion and sediment damage within the City of Little Rock; to safeguard the safety and welfare of citizens; to establish reasonable standards and procedures for development which prevent potential flooding, erosion and sediment damage; to prevent the pollution of streams, ponds and other watercourses by sediment; to minimize the danger of flood loss and loss due to unstable slopes; and to preserve natural vegetation which enhances the quality of life of the community. 5A.3--General Requirements - Persons engaged in land alteration activities regulated by this Ordinance shall take measures to protect neighboring public and private properties from damage by such activities. The require- ments of this ordinance, however, are not intended to prevent the reasonable use of properties as permitted by the Zoning Ordinance. Except as exempted by Section 5A.5, any person, firm, corporation or business proposing to engage in grading, clearing, filling, cutting, quarrying, construction or similar activities regulated by this Ordinance shall apply to the City Engineer for approval of plans and issuance of a grading permit as specified in this Ordinance. No land shall be altered to the extent herein regulated unless such a permit is issued. A grading permit is required for large or extensive land alteration activities specified in the next paragraph. However, all construction work shall include appropriate drainage and erosion control measures to protect neighboring properties. Also, all properties within the designated floodplain shall be required to obtain a grading permit without exception. 2. 1 2 3 4 5 6 7 Grading permits, which may be obtained as part of a building permit, shall be required for any of the following activities on land zoned or intended for commercial, industrial, office, multi - family or institutional use, unless exempted in Section 5A.5: A. A hillside cut greater than 15 feet vertical with a proposed slope greater than one and one -half foot horizontal to one foot vertical (34 degrees) or a fill resulting in an embankment with a slope greater than one and one -half foot horizontal to one foot vertical (34 degrees) and with a height greater than 15 feet vertical. Vertical distances shall be measured from the top and toe of a cut or fill. An application for any such activity shall be reviewed by the City Engineer and approved by the Planning Commission, prior to.issuance of a permit. B. Grading, filling, hillside cutting, quarrying, construction or similar activities involving more than five acres of such activities, unless exempted by Section 5A.5 of this Ordinance. C. Clearing or cutting of trees covering 25 percent or..more of a tract, subject to the following limits: 1. The area of clearing and cutting must exceed one acre in size before a grading permit is required; and 2. Five acres is the largest area of clearing or cutting that can occur without a grading permit, even if the area of clearing and cutting is less than 25 percent of a tract. 3. 1 2 D. Any construction activity where the total volume 3 of cut or fill is equal to or greater than 3,000 4 cubic yards. 5 6 Prior to issuance of a grading permit, a Grading and 7 Drainage Plan must be submitted to and approved by the City 8 Engineer for activities specified in Subsections B, C, and D 9 of this Section. 10 11 E. Sketch Grading and Drainage Plan 12 13 1. A Sketch Grading and Drainage Plan may be 14 submitted for authorization to the City 15 Engineer for agricultural uses or forestry 16 activities on land owned by a forest - related 17 industry. 18 19 2. When the application is for a planned unit 20 development, conditional use permit, site 21 plan review, subdivision, or multiple 22 building site approval, a Sketch Grading and 23 Drainage Plan shall be required in the 24 application to the Planning Commission only 25 if any of the activities specified in 26 Subsections A thru D of this Section are 27 involved. 28 29 F. One -Time Approvals 30 31 1. Utility organizations may obtain a one -time 32 approval from the City Engineer for all 33 routine tree trimming and installation, 34 maintenance, replacement and repair of fence 35 and sign posts, telephone poles and other 36 kinds of posts or poles and overhead or 4. underground electric, water, sewer, natural gas, telephone or cable facilities. The approval will include a utility organization and its contractors, agents or assigns and will be permanent in nature as long as the original approved procedures are followed. However, large -scale utility projects involving clearing of areas over 25 feet in width shall not be authorized by one -time approval of all projects. In such cases, a separate grading permit must be obtained for each project. The land use shall be considered to be equivalent to industrial uses covered by the provisions of this ordinance. 2. One -time approval may be obtained by public or private entities for the stock piling of construction spoil material at particular locations. �As�__E�e�ngtgr - A grading permit shall not be required for: A. Construction of a single - family residence. B. Previously platted single - family residential subdivisions including those for which preliminary plat approval was given prior to the adoption of this Ordinance. C. All land alterations totaling five contiguous acres or less, except where such five -acres or less is part of a larger area of common owner- ship that will be altered, and except where any of the activities specified in Subsections A, C and D of Section 5A.4 above is involved. D. Emergency work or repairs to protect life, limb or property. E. Mining and mining operations. These fall under the Open Cut Land Reclamation Act, which is regulated by the Arkansas Department of Pollution Control and Ecology. For each grading and drainage permit to be issued, the following procedure must be followed: A. Grading and Drainage Plan. The Plan shall include erosion and sediment control provisions meeting standards established by the Department of Public Works in the Stormwater Management and Drainage Manual. B. Approval. The City Engineer shall in writing approve, disapprove or recommend modification of the Grading and Drainage Plan within 10 working days after the date of submittal, unless Planning Commission approval is required or a Sketch Grading and Drainage Plan must be submitted as part of a Planning Commission application. Failure of the City Engineer to act upon a Plan within the required 10 working days shall result in automatic approval of the Plan. 6 All applications for which Planning Commission approval is required shall be placed on the next available Planning Commission agenda after the 10 day review period. Sketch Grading and Drainage Plans shall be reviewed and reported upon by the City Engineer by the time of the applicable Subdivision Committee meeting, if possible, but not later than the applicable Planning Commission meeting. Except for residential subdivision work, the approval of a Sketch Grading and Drainage Plan shall not eliminate the need to submit and have approved a complete Grading and Drainage Plan, prior to issuance of a building permit or the initiation of work. For residential subdivision work, only a Sketch Grading and Drainage Plan shall be required, and clearing and grading work may proceed prior to approval of construction drawings. The Sketch Plan for residential sub- divisions must indicate how runoff, erosion, and sedimentation will be controlled only during street construction. C. Issuance of Grading Permit. Upon approval of the final Plan, the Department of Public Works shall issue a grading permit. A stop order may be issued by the City Engineer if, upon ipspection, he determines that the work is not progressing in accordance with the approved Plan. The City Engineer may allow modifications of the Plan to alleviate problems encountered by the applicant during the process of construction. In reviewing applications for modifications, the City Engineer may require from the applicant's engineer, architect, or landscape architect appropriate reports and data sufficient to make a 7. decision. Major changes to Plans approved by the Planning Commission either in sketch or final form shall not be permitted without resubmittal to the Commission. Examples of major changes are those that substantially increase the height of cuts, the area of clearing or grading, or impacts on neighboring properties. More than a twenty percent increase in height, area or impact will normally be considered a major change. Examples of increased impacts include reductions in buffer area, increased cubic feet of runoff on adjacent properties, and increased site area that is visible from adjacent properties or a public street. - Preparation of Grading and Drainage Plans shall follow the Stormwater Management and Drainage Manual adopted by the Department of Public Works and shall be evaluated on the basis of the following considerations: A. Limiting cuts to 15 feet in height unless geotechnical information demonstrating slope stability, erosion control, and drainage control is provided, together with a plan for landscaping portions of the cut area. A series of smaller cuts with terraces, reserving portions of natural vegetation and providing areas for planting should be considered in situations where more than 15 feet of cut is needed. It is recommended that terracing be at a maximum ratio of one to one, i.e. at least one foot of horizontal terrace for every foot of vertical surface with a maximum of 10 vertical feet allotted. B. Planning of development to fit topography, soils, geology, hydrology, and other existing site conditions; C. Providing for safety against unstable slopes or slopes subject to erosion and deterioration, in in order to protect human lives and property; D. Grading to complement natural land forms; E. After grading, accomplishing all paving, seeding, sodding, or mulching in accordance with a reasonable schedule approved by the City Engineer. F. Allocating to open space and recreation uses those areas not well suited to development, as evidenced by existing competent soils, geology, and hydrology investigations and reports; G. Minimizing the potential for soil loss by retaining natural vegetation wherever possible; H. Making appropriate provisions such as those in the City's Stormwater Management and Drainage Manual to accommodate stormwater runoff and soil loss occasioned by changed soil and surface conditions during and after development, including the use of vegetation and limitations on soil exposure; I. Scheduling permanent improvements such as streets, storm sewers, curb and gutters, and other features for control of storm runoff as soon as economi- cally and physically feasible (not up front), before removing vegetation cover from the area, so that large areas are not left bare and exposed for 9 1 2 3 4 5 long periods of time, beyond the capacity of temporary control measures; and J. Installing and maintaining temporary or permanent sediment basins, debris basins, desilting basins or silt traps to specifically reduce sediment from runoff water. K. Maintaining where feasible a perimeter strip, undisturbed except for reasonable access, around areas cleared of trees covering 25 percent or more of a tract, the perimeter standard being a 25 foot perimeter strip for sites over one acre in size. In addition, a strip at least 25 feet wide, undisturbed except for reasonable access, should be provided where feasible on each side of a stream with a 10 year storm greater than 150 cubic feet per second on such sites. The 25 foot strip should be measured from the top of the bank. One plan may be submitted incorporating provisions for compliance, where applicable, with the City's landscaping, drainage detention, grading, clearing, filling, cutting, quarrying, and construction requirements. One permit may be issued to cover all of these requirements. In an application to comply with any of the City's requirements specified in this Section, the applicant must declare large or extensive land alterations described in subsections A, B, C and D of Section 5A.4 of this Ordinance. A fee for each grading permit shall be paid as set forth in the table below to the City Collector 10. by each person seeking a permit for land alteration activities. The permit fee is to defray the costs of reviewing the site Grading and Drainage Plan, making on -site inspections, and providing the other services required in the administration of this Ordinance. No fee shall be required in connection with a Sketch Grading Plan filed as part of an application to the Planning Commission or in connection with a one -time approval. TABLE 17.1 GRADING PERMIT REVIEW AND INSPECTION FEES Total Project Area Less than 1/2 acre 1/2 acre to 1 acre Greater than 1 acre Fee $25.00 per permit $40.00 per permit $50.00 per acre up to a maximum of $250.00 X111 I�speeto�_aD�_�QB���ee - The City Engineer shall be responsible for determining whether construction is proceeding according to the Grading and Drainage Plan. A. Inspections of the development site shall be performed by Department of Public Works inspectors. In applying for a grading permit, the applicant shall be deemed to have consented to such inspections. B. The City Engineer, through such periodic inspections, shall ensure that erosion control measures are implemented within one week after cessation or completion of all or portions of authorized work. The City Engineer may where necessary order remedial work or issue a stop 11. 1 2 3 4 5 6 7 8 order in accordance with the procedures in Sections 6.4 and 6.5 of the Stormwater Management and Drainage Ordinance. 5A.!2__Appg -q1z - Final decisions of the City Engineer regarding Grading and Drainage Plans shall be subject to review by the Planning Commission, provided an appeal is filed by the applicant within 30 days after the date of the final written decision. All appeals shall be reviewed by the Subdivision Committee prior to Planning Commission action. Notice of the appeal shall be given to adjacent property owners, including those across a street or alley from the subject property, at least 10 days prior to the Planning Commission meeting at which the appeal is to be considered. Said notice shall be by certified mail and shall be the responsibility of the applicant. 5As13__ Restoraor�s _�g�_���_Sp��ial_��oy�o�� - In addition to the fine specified in Section 6.2 of the Stormwater Management and Drainage Ordinance, any person, firm, or corporation which engages in land alteration activities regulated by this Ordinance without obtaining a grading permit shall be required to restore the land, to the maximum extent possible, to its original condition by planting and maintaining grass and trees with trunks at least two inches in diameter (measured one foot above ground level) in accordance with accepted spacing standards and by under- taking other restoration activities determined to be feasible'by a court of law. Since complete restoration of disturbed areas may not be possible within a reasonable period of time, the violator also shall pay a fee where appropriate in an amount necessary, as determined by the City Engineer, to cover the cost of the City implementing measures to mitigate any potential flooding, erosion, or sediment damage resulting from the violation. All fines received as a result of illegal land alteration activities 12. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 shall be placed in a special fund to be administered by the City Manager. The fund shall be used for the purpose of restoring disturbed lands, mitigating damages resulting from violations, or otherwise making drainage improvements or planting vegetation in the general vicinity of violations. Appendix A of this Ordinance contains the specifications for a Sketch Grading and Drainage Plan and a complete Grading and Drainage Plan. Said Appendix A is attached hereto and made a part of this Ordinance. SECTION 2. Definitions for terms contained in Appendix B of this Ordinance shall be inserted in alphabetical order into Section 1.6 (Definitions) of Ordinance No. 14,780 (Stormwater Management and Drainage Ordinance). SECTION 3. All prior ordinances or parts of ordinances inconsistent with this ordinance are hereby repealed to the extent of their inconsistency. SECTION 4. This Ordinance shall take effect and be in full force 30 days from and after its passage and approval. PASSED:-. ----------------- ATTEST: City--Clerk APPROVED AS TO FORM: _____ APPROVED:- __�.___.___- iMayor - _- ___.___�._____- _— __...._.Yw_ City Attorney 13. SECTION Al. Sketch Grading and Drainage Plan. A Sketch Plan shall identify the following: A. Acreage of the proposed project. B. Land areas to be disturbed, shown by hatching or specking such areas which will be graded, cut, filled, or cleared. C. Stages of grading showing the limits of sections to be graded and indicating the approximate order of development. D. The extent of cuts and fills, shown by drawing a dashed line along the top of the cut and toe of the fill and marking the lines "C" and "F ". The height and slope of cuts and fills also shall be indicated. E. Provisions for collecting and discharging surface water. F. Erosion and sediment measures, including structural and /or vegetative measures. G, Seal and signature of a registered engineer, architect, or landscape architect which certify that the Sketch Grading and Drainage Plan complies with the Ordinance. However, plans for areas less than 5 acres where cuts or fills are not greater than 25 feet in height may be prepared by a contraftor or the property owner. 14. 1 2 3 4 5 6 7 8 SECTION A2. Grading and Drainage Plan. In addition to the requirements for a Sketch Grading and Drainage Plan, a complete Grading and Drainage Plan shall include the following: A. Seal of a registered engineer certifying that the Grading and Drainage Plan complies with the Ordinance. The seal of a registered architect or landscape architect will be acceptable if all required boundary street and drainage improve- ments are in place. B. A vicinity drawing showing: location of property lines; location and names of all existing or platted streets or other public ways within or immediately adjacent to the tract. C. Location of all known existing sewers, water mains, culverts and underground utilities within the tract and immediately adjacent thereto; location of existing permanent buildings on or immediately adjacent to the site if right of entry can be obtained to locate same. D. Citation of any existing legal rights -of -way or easements affecting the property. E. Soil loss calculations as estimated by the Universal Soil Loss Equation (see definition in Appendix B). Allowable soil loss shall not exceed 5 tons per acre per year. Examples of soil loss calculations are contained in the Stormwater Management and Drainage Manual of the Department of Public Works. 15. 1 2 3 4 5 6 7 8 F. A plan of the site at a minimum scale of 1 inch = 100 feet showing: 1. Address and telephone number of the owner, developer, and person responsible for maintenance of the temporary and /or permanent erosion and sediment control measures. 2. The approximate location and width of proposed streets. 3. The approximate locations and dimensions of all proposed or existing lots. 4. The approximate locations and dimensions of all parcels of land proposed to be set aside for parks, playgrounds, natural condition perimeters, public use, or for the use of property owners in the proposed development. 5. Existing topography at a maximum of five -foot contour intervals. 6. Proposed topography at a maximum of five -foot contour intervals. 7. An approximate timing schedule, indicating the anticipated starting and completion dates of the development; a timing schedule for the sequence of grading and application of erosion and sediment control measures. B. Acreage of the proposed project. 16. 9. Identification of unusual material or soils in land areas to be disturbed. If any surface indications of unusual materials or soils that would cause street or lot instability, such as nonvertical tree growth, old slides, seepage, or depressions in the soil are visible before grading,they should be noted and accompanied by the engineer's, architect's, landscape architect's, or contractor's recommendation for correcting such problem areas. 10. Identification of suitable material to be used for fills shall be accomplished before actual filling begins. If there are any surface indications that local material is not suitable for fills, those areas to be filled with outside material should be identified and the -type and source of the fill material noted. 11. Specification of measures to control runoff, erosion and sedimentation during the process of construction, noting those areas where control of runoff will be required during construction and indicating what will be used, such as straw bales, silt dams, brush check dams, lateral hillside ditches, catch basins, etc. 12. Measures to protect neighboring built -up areas and City property during the process of construction, noting work to be performed, such as cleaning existing ditches, storm culverts and catch basins or raising existing curbs in neighboring areas. 17. 1 2 13. Provisions to stabilize soils and slopes 3 after completion of streets, sewers and other 4 improvements, noting on the grading plan when 5 and where ground cover will be planted, also 6 noting any other means to be used such as 7 placement.of stone embankments and riprap or 8 construction of retaining walls. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 18. 1 2 3 The following terms utilized in this Ordinance shall be 4 defined as provided below: 5 6 Agriculture - All farm enterprises such as: crop land, 7 forage production; animal husbandry, dairy and poultry; and 8 floriculture. 9 10 Developer - A person, partnership or a corporation 11 engaged in land alteration activities which are not excluded 12 by the Exemption Section of this Ordinance. 13 14 Land Alteration - The process of grading, clearing, 15 filling, cutting, quarrying, construction or similar 16 activities, unless excluded by the Exemption Section of this 17 Ordinance. 18 19 Erosion - The wearing away of land by action of wind, 20 water or gravity. 21 22 Forestry Operation - An operation conducted on land 23 owned or leased by a major forestry industry corporation for 24 the systematic harvest of timber. 15 26 Grading and Drainage Plan - The plan required before a 27 grading permit can be issued. 28 29 Mulching - The application of plant or other suitable 30 materials on a soil surface to conserve moisture, reduce 31 erosion, and aid in establishing plant cover. 32 33 Sediment - Rock, sand, gravel, silt, clay or other 34 material deposited by action of wind, water or gravity. 35 36 19. 1 Sedimentation Basin - The storage area created by a barrier or dam built across a waterway or at other suitable 3 locations to retain rock, sand, gravel, silt, clay or other 4 material. Universal Soil Loss Equation - A method developed by the Agricultural Research Service, USDA, and used to estimate soil erosion based on a rainfall, soil erodibility, slope of the land, length of slope and plant cover. The basic form of the equation is: E= R R L S C P Where: E = soil loss, in tons per acre per year R = rainfall factor R = soil erodibility factor LS = slope length gradient factor C = vegetative.cover factor P = conservation practice factor Examples of soil loss calculations are contained in the Stormwater Management and Drainage Manual of the Department of Public Works. 20. SECTIONS OF THE STORMWATER MANAGEMENT AND DRAINAGE ORDINANCE REFERRED TO IN THE PROPOSED EXCAVATION ORDINANCE suffering, and (2) to minimize the hazards of personal injury and loss of life due to flooding, to be accomplished through the approval of a stormwater management and drainage plan pursuant 'to the provisions of these regulations, which: (a) establish the major and minor stormwater management systems, (b) define and establish stormwater management practices and use restrictions, and (c) establish guidelines for handling increases in volume and peak discharges of runoff. 1.6 Definitions - For the purpose of this Ordinance, certain terms and words shall be used, interpreted and defined as set forth in this section. Unless the context clearly indicates to the contrary, words used in the present tense include the future tense; words used in the singular shall include the plural, and vice - versa; the words, "these regulations," mean "this Ordinance;" the word, "person," includes corporation, partnership, and unincorporated. association of persons; and the word, "shall," is always mandatory. X. Base Flood - The flood that has a 1 percent chance of being equaled or exceeded in any given year, i.e., the 100 -Year Flood. B. Bond - Any form of security for the completion or performance of the stormwater management and drainage plan or the maintenance of drainage improvements, including surety bond, collateral, property or instrument of credit, or escrow deposit in an amount and form satisfactory to the City Engineer. C. Building - Any structure built for the support, shelter or enclosures of persons, animals, chattels, or movable property of any kind. D. Channel - Course of perceptible extent which periodically or continuously contains moving water, or which forms a connecting link between two bodies of water, and which has a definite bed and banks. E. Conduit - Any open or closed device for conveying flowing water. F. Control - The hydraulic characteristic which determines the stage- discharge relationship in a conduit. The control is usually critical depth, tailwater• depth, or uniform depth. G. Detention Basins - Any man -made area which serves as a means of controlling and temporarily storing stormwater runoff. The facility normally drains completely between spaced runoff events, e.g., parking lots, rooftops, athletic fields, dry wells, oversized storm drain pipes. 2. H. Detention - The temporary detaining or storage of floodwater in reservoirs, on parking lots, on rooftops and other areas under predetermined and controlled conditions - accompanied by controlled release of the stored water. I. Detention Pond - A stormwater detention facility which maintains a fixed minimum water elevation between runoff events except for the lowering resulting from losses of water due to infiltration or evaporation. J. Development - Any change of land use or improvement on any parcel.land. K. Differential Runoff - The volume and rate of flow of stormwater runoff discharged from a parcel of land or drainage area which is or will be greater than the volume and rate which pertained prior to proposed development or redevelopment existed. L. Drainage Approval- - A certificate of approval issued by the City Engineer based upon an approved final stormwater management and drainage plan. The'final stormwater management and drainage plan must accompany the building permit application or be submitted with the proposed construction plans. M. Drainage Easement - Authorization by a property owner for use by another party or parties for all or any portion of his /her land for a drainage and adjoining utility purposes. Easements shall be dedicated to the City when required or approved by the City Engineer. N. Engineer of Record - A registered professional engineer in Arkansas. This engineer shall supervise the design and construction of the project and shall be acceptable by the City Engineer. 0. Floodplain - A land area adjoining a river, stream, watercourse or lake which is likely to be flooded. P. Floodway - The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without a cumulative increase of the water surface elevation more than a designated height. Q. Freeboard - A factor of safety expressed as the difference in elevation between the top of the detention basin dam, levees, culvert entrances and other hydraulic structures, and the design flow elevation. R. Frequency_ - The reciprocal of the exceedance probability. 3. S. Habitable Dwelling Unit - A dwelling unit i.-.tended and suitable for human habitation. T. Major Storm Easements - Privately maintained areas designed to carry the 100 -year storm with no obstructions allowed such as fill or fences that would impede floodwater flow. Properly designed landscaping that does not impede floodwater or endanger adjacent property may be allowed. U. Minor Storm Easements - Public maintained areas designed to carry the 10 -year (or 50 -year for CBD area) storm; provide access for maintenance; and prevent channel obstructions. V. On -Site Detention - Temporary storage of runoff on the same land development site where the runoff is generated. W. On- Stream Detention - Temporary storage of runoff within a principal drainage system, i.e., in the receiving streams or conduits. X. Off- Stream Detention - Temporary storage accomplished off -line, �.e., not within a principal drainage system. Y. 100 -Year Peak Flow - The peak rate of flow of water at a given point in a channel, watercourse or conduit resulting from the base flood. Z. 100 -Year Storm - Rainstorms of a specified duration having a 1 percent chance of occurrence in a given year. AA. Permittee - A person, partnership or corporation to whom a permit is granted. BB. Plat - A legally recorded plat of a parcel of land subdivided into lots with streets, alleys, easements, and other land lines drawn to scale. CC:. Project - Any development involving the construction, reconstruction or improvement of structures and /or grounds. DD. Rational Method - An empirical formula for calculating peak rates of runoff resulting from rainfail. EE. Retention Facility - Any type of detention facility not provided with a positive outlet. FF. Stormwater Management and Drainage Manual - The set of drainage policies, analysis methods, design charts, 4. stormwater runoff methods, and design standards used by the City as the official design guidelines for drainage improvements consistent with this Ordinance. Any modifications will be made by the City Engineer consistent with the stated policies and intent of the Ordinance. GG. Stormwater Runoff - water that results from precipitation which is not absorbed by the soil, evaporated into the atmosphere or entrapped by ground surface depressions and vegetation, which flows over the ground surface. HH. Structure - Any object constructed above or below ground. Pipes, manholes and certain other utility structures which exist underground may be excluded from this definition. II. Swale - A shallow waterway. JJ. Time of Concentration - The estimated time in minutes required for runoff to flow from the most remote section of the drainage area to the point at which the flow is to be determined. KK. Tributary Area - All of the area that contributes stormwater runoff to a given point. LL. Uniform Channel - A channel with a constant cross section and roughness. MM. Wet Bottom Basin - A detention basin intended to have a permanent pool. NN. Watercourse - Any surface stream, creek, brook, branch, depression, reservoir, lake, pond or drainageway in or into which stormwater runoff flows. ARTICLE 2. STORMWATER MANAGEMENT AND DRAINAGE SYSTEM. 2.1 General - This article establishes the stormwater runoff management system of the City of Little Rock which shall be composed of a major system and a minor system, management controls and management practices. These regulations shall apply in the minor system. 2.2 The Major System - The major system is the area in any drainageway within the limits of flow of a 100 -year storm. 2.3 The Minor System - The minor systems will be composed of all watercourses and drainage structures, both public and private, that are not part of the major system, because of lower design storm frequencies. 5. Engineer shall approve the plan. Project approval shall be issued in the name of the applicant who shall then be known and thereafter be referred to as the permittee. An approved permit shall set forth the terms and conditions of the approve stormwater management and drainage plan. 5.4 Engineer of Record - Should the original Engineer of Record be prevented from completing the project, the Permittee shall employ another qualified engineer and notify the City Engineer immediately. ARTICLE 6. ENFORCEMENT 6.1 General - It shall be the duty of the to bring to or lack of the attention of the City Attorney compliance herewith. City Engineer any violation 6.2 Violations and Penalties - Any Permittee (person, firm or corporation) who fails to comply with or violates any of these regulations shall be guilty of a misdemeanor and upon conviction thereof shall be fined not less than $100 per day and not more than $500 per day. 6.3 Inspection - The City Engineer shall be responsible for determining w -ether the stormwater management and drainage plan is in conformance with the requirements specified by the City's Stormwater Management and Drainage Manual. Also, the City Engineer shall be responsible for e -eermining whether the development plan is proceeding in accordance with the approved drainage plan. Periodic inspection of the development site shall be made by the City Engineer's office. Through such periodic inspections, the City Engineer's office shall ensure that the stormwater management and drainage plan is properly implemented and that the improvements are maintained. 6.4 Remedial work - If it is determined through inspection that the development is not proceeding in accordance with the approved stormwater management and drainage plan, and drainage and /or building permit, the City Engineer shall immediately issue written notice to the permittee and the surety of the nature and location of the alleged noncompliance, accompanied by documentary evidence demonstrating noncompliance and specifying what remedial work is necessary to bring the project into compliance. The permittee so notified shall immediately, unless weather conditions or other factors beyond the control of the permittee prevent immediate remedial action, commence the recommended remedial action and shall complete the remedial work within 72 hours or within a reasonable time as determined in advance by the City Engineer. Upon 14. satisfactory completion of remedial work, the City Engineer shall issue a notice of compliance and the development may proceed. 6.5 Revocation of Permits or Approvals; Stop Orders - ---3�'The City Engineer after giving five days written notice, may revoke the permit issued pursuant to the regulations for any project which is found upon inspection to be in violation of the provisions of these regulations, and for which the permittee has not agreed to undertake remedial work as provided in Section 6.4. Drainage and /or building permits may also be revoked if remedial work is not completed within the time allowed. Upon revocation of a permit or approval, the City Engineer shall issue a stop work order. Such stop work order shall be directed to the permittee and he shall immediately notify persons owning the land, developer, and those persons or firms actually performing the physical work of clearing, grading, and developing the land. The stop work order shall direct the parties involved to cease and desist all or any portion of the work on the development for a portion thereof which is not in compliance, except such remedial work necessary to bring the project into compliance. ARTICLE 7. GENERAL PROVISIONS 7.1 Interpretation, Conflict and Severability Interpretations A. Interpretation - In their interpretation and application, the provisions of these regulations shall be held to be the minimum requirements for the promotion of the public health, safety and general welfare. B. Conflict with Public and Private Provisions - These regulations are not intended to interfere with, abrogate, or annul any other ordinance, rule or regulation, statute or other provision of law. Where any provision of these, regulations imposes restrictions different from those imposed by any other provision of these regulations or any other ordinance, rule or regulation, or other provision of law, whichever provisions are more restrictive or impose higher standards, shall control. Private Provisions - These regulations are not intended to abrogate any easement, covenant or any other private agreement or restriction, provided that where the provisions of these regulations are more restrictive or impose higher standards or regulations that such easement, covenant or other private agreement or restriction, the requirements of these regulations shall govern. Where the provisions of the 15. January 27, 1987 PLANNING HEARING Item No. 2 - 65th West District Plan NAME: City of Little Rock LOCATION: A 6 mile area west of University Avenue north of Forbing Road and I -430 on the west REQUEST: STAFF REPORT: Adoption of this district land use plan The 65th West District Plan has been prepared by the staff illustrating many of the uses and zoning currently in existence. The plan recognizes the University Avenue corridor as a major commercial area. It also recognizes some neighborhood commercial areas and industrial uses along Stagecoach Road. The land use emphasizes that Stagecoach Road is mainly a rural residential corridor and has not gone through a transformation from residential to commercial. The plan stresses that the commercial use should be concentrated at existing sites and major planned intersections and not in a strip configuration along Stagecoach Road. This land use plan would recommend that changes be made in the Master Street Plan that would eliminate or downgrade several streets in this area. These roadways are considered, by the staff, as unrealistic because of the cost of bridge construction and road construction in the floodplain. STAFF RECOMMENDATION: The staff recommends that the Planning Commission adopt the 65th Street West District Plan understanding that the staff will present amendments to the Master Street Plan at a later date. January 27, 1987 PLANNING HEARING Item No. 2 - Continued PLANNING COMMISSION ACTION: (1- 27 -87) The plan was presented to the Planning Commission. No citizen spoke from the audience. Staff recommended extending the neighborhood commercial shown at the intersection of Stagecoach Road and Lanehart Road to include one additional parcel to the north along Stagecoach Road. Don McChesney addressed Master Street Plan changes to be made at a later date. The plan was approved as presented by a vote of 7 ayes, 0 noes, 1 abstention, and 3 absent. January 27, 1987 PLANNING HEARING Item No. 3 - Amendment to Highway 10 Plan _ NAME: Whitten McInnis LOCATION: Highway 10 and Woodland Heights Road REQUEST: A request for the Planning Commission to reconsider the Woodland Heights area, the Highway 10 Plan (See enclosed letter) STAFF REPORT: The Highway 10 Plan was the first element of the Extraterritorial Land Use Plan. The staff and Planning Commission recommended that the Woodland Heights area be shown as a MXD with a specific set of development guidelines. The final action by the Board of Directors showed the area as single family. BOARD OF DIRECTORS ACTION: (5- 20 -86) An ordinance adopting the Highway 10 Land Use Plan of the Extraterritorial Land Use Plan; (The proposed ordinance was ready for the first time and amended on May 6, 1986.) Before the second reading of the ordinance, a discussion ensued with both support and opposition being present. The land use plan included 37 acres on the south side of Highway 10 between Fairway and Woodland Heights Road to be one development mixing office, multifamily, residential, and commercial uses. Attorney Christoper Barrier, representing the Pleasant Ridge Development Company which owns part of the acreage said asking that the 37 acres be developed as a unit was unrealistic. Attorney David P. Henry, a resident of Woodland Heights, Ms. Earnestine Rush, 11525 Summit Road, Mr. Jake Clements, 11621 Summit Road, and Deanna Piggee Kinsey, spoke in support of the plan asking that it be approved as submitted. Director Milton stated the misuse would lead to demise of the residential area and would January 27, 1987 PLANNING HEARING Item No. 3 - Continued cause unbelievable traffic problems. To conclude the discussion, Director Milton moved, seconded by Director Shackleford, that the plan be amended to omit the 37 acres described as MXD (in the Summit and Woodland Heights area) plus those areas designated as office where the skating rink and kennel are located on the south side of Fairview Road /Woodland Heights Road, with the omitted sections to be shown as single family residential. Roll call was taken which adopted the motion as follows: 4 ayes, 3 noes, and 0 absent. BOARD OF DIRECTORS ACTION: (6 -1 -86) The Board of Directors discussed the Urban Village Concept (see attached pages) briefly and then asked the Planning Commission for their review. The Board of Directors at a later agenda meeting decided not to place the Urban Village Amendment to the Highway 10 Plan on the agenda. STAFF RECOMMENDATION: The staff recommends denial of the Urban Village and the Mixed Use Concept. A City traffic study has shown that both concepts would produce more traffic than the system could handle. The existing Highway 10 Plan also shows this area as single family. As long as the Board of Directors' policy is to keep the area single family, then residential uses are viable. Staff would support either keeping the area single family or support the amending of the plan to show the Highway 10 frontage as a transitional zone. PLANNING COMMISSION ACTION: (1-27 -87) Staff explained why the matter was before the Planning Commission again and outlined the staff recommendation. Mr. Whitten McInnis, applicant, said that he represented 90 percent of the homeowners in the Summit Road area and proceeded to outline the history of the Urban Village and Mixed Use proposals. He said that he supported either the Mixed Use or the Urban Village Concept. Henk Koornstra noted that even with the capacity improvements proposed as mitigating actions in the traffic study, a traffic capacity problem would still be present. There was discussion as to January 27, 1987 PLANNING HEARING Item No. 3 - Continued whether the traffic study should be allowed to restrict development in the Highway 10 area. Chris Barrier, representing the Pleasant Ridge Development Company, said that the area should stay single- family until a specific plan was proposed with details. David Werling, representing the Walton Heights - Candlewood Homeowners Association, expressed concern about traffic and the amount of commercial land use. He noted that guidelines for the Mixed Use Concept did not cover the percent of commercial, residential or office land uses. He said that Walton Heights - Candlewood residents wanted guidelines on proportions of land uses. Richard Massie indicated 98 percent commercial would not be proposed by developers or approved by the Commission. He said that guidelines had been tried, but no one could agree because it forced the economics of the project. After further discussion, Jerilyn Nicholson seconded by Dorothy Arnett that the Plannin stand by its original recommendation of the Concept, with the original guidelines. The 7 ayes, 0 noes, 1 abstention (Riddick), and reasons for the Commission's recommendation made a motion, 3 Commission Mixed Use vote was: 3 absent. The were: 1. The Mixed Use Concept will require a mixture of commercial, multifamily and office uses as part of a single PUD application covering both the Summit Street area and the area fronting on Highway 10. 2. The Urban Village Concept is not the best plan for the area because it fails to deal with the development potential of property fronting on Highway 10. 3. Traffic matters can be considered at the time of the PUD submittal. Traffic impacts cannot be properly evaluated until an actual PUD application is submitted. The traffic study by the City was based on the Urban Village Concept, not a mixed use PUD for the larger area. 4. Traffic considerations should not be allowed to stymie growth in the Highway 10 area. 5. The area was studied extensively as part of the Extraterritorial Study, and the Commission stands by its recommendation made at the conclusion of the Study. MIXED USE SPECIAL PUD REDEVELOPMENT AREA GUIDELINES FAIRVIEW ROAD /WOODLAND HEIGHTS Retail Commercial (FAR .2) Office (FAR .4) MF Residential (18 Du /Ac) Q I 4910AW4110 QVW.W;l Single PUD Submission - 37+ acres Highway 10 Frontage Access Limited to 1 Per 300 ft. Frontage Maximum Major Road Improvements a) Pleasant Ridge Extension & Rodney Parham b) Woodland Heights Road to Highway 10 (consists of lowering terrain) Building Set -back Minimum of 125 ft. from Centerline of Highway 10 and 80 ft. Building Setback from Centerline of Fairview /Woodland Heights Roads, Landscape Buffer of 25 ft. as indicated on the Plan In Lieu Contributions Toward Traffic Signals No Access Across Existing Commercial Tracts Unless in the Overall PUD Must Be "Mixed" Use Total PUD Submission - Single Application Illustrate Building "Envelopes" Show Ingress and Egress and Internal Circulator Illustrate Cross Sections and Preliminary Grading Plan Show Parking Area Detail Uses of All The Buildings Submit Schematic Drainage Plan Illustrate Landscape and Buffer Areas Mr. Gary Greeson Planning Department City Hall McINNIS PROPERTY GROUP �9�Y� December 24, 1986 Little Rock, Arkansas 72201 RE: Woodland Heights Subdivision Dear Mr. Greeson: On behalf of the residents of the Woodland Heights Subdivision in Little Rock, Arkansas, I am requesting that the Planning Commission once again consider the Woodland Heights area as it relates to the Highway 10 Extra-Territorial Plan previously adopted by the city's Board of Directors. We will submit two alternatives for the Com mission to consider. The Mixed Use Development Concept, previously approved by the Planning Commission, and the Urban Village Plan. Everyone agrees that the Woodland Heights area is now unsuited for single family residental use. However, the problem has been in how to best utilize the particular property as a whole. The Mixed Use Development was previously approved by the Planning Commission, but disallowed by the Board of Directors. It is our contention that the Board of Directors failed to approve this plan because of their lack of understanding regarding the numerous restrictions imposed upon the development, i.e., floor area ratios, etc. However, it has been expressed by various members of the Board that is was never the Boards intention to not eventually adopt a workable plan for the area. Thus, we have been advised to proceed once again through the Planning Commission with our request. I speak for the property owners when I say that we are extremely frustrated by the City's failure to resolve the Woodland Heights land use issue. The property owners have complied with every request made to them by the Staff, the Planning Commission and the Board of Directors, but, have yet to see the issue resolved. ONE FINANCIAL CENTRE, SUITE 229 • LITTLE ROCK. ARKANSAS 7221 1 (501 l 225-9300 McINNIS PROPERTY GROUP It is for these reasons that the two alternative plans are being submitted to the Planning Commission. The property owners, again, stand ready to meet and fulfill any request made of them. EWM:cgb Sincerely, L E. Wigton McIinnis ONE FINANCIAL CENTRE. SUITE 229 • LITTLE ROCK, ARKANSAS 72211 (501 ) 225.9300 EXISTING CG2-... CENTRAL FEATURE Hic,h Visibility FOCUS of Development 'THE MEADOWS' Mid Rise Office _-auz4 ;ng aireei Vesignea Much L e Old Fash 2 &3 Story B ildings wi Commercial Bel w or Housir Area Should a Surpri a and Delight to rs with a PROPOSED LAND USES WOODLAND HEIGHTS URBAN VILLAGE PLANNED DEVELOPMENT HIGHWAY 10 CORRIDOR GiNERA%. NOTES: The Concept Presented Here is That o e Ur VI e, an Ir�iegrated Com0uruty Which Offers a Variety of Housing, Working Lei Time ortunities� in an Area With Well- Defined Boundaries. The Goal is to Create a Sens f Plate oossropolitan Environment Without the Drawbacks Generally Associated With High D Ity U ife. In Order to Achieve This, It Will be Necessary to Define an Architectural abula For the Project, One Which Will Unify the Disparate Land Uses and Areas Within th%,F'roject. URBAN VILLAGE CONCEPT 3a NORTH HIGHWAY 10 PLAN URBAN VILLAGE AREA GUIDELINES AREA 1 -37 acres bounded by Woodland Heights, Fairview, and Highway 10 AREA 2 -10 acres bounded by Woodland Heights/Pleasant Ridge Road 1.Land Use: 2.Density: AREA 1 -Single-Family/Multi-Family-Mixed Use (Comercial/Residenti al)-Office -The Single-Family/Multi-Family Areanorth of the "Promenade" and south ofHighway 10 can be Single-Family Attachedand Detached or Multi-Family. Maximumdensity can not exceed 10 units/acre. -The Central Shopping Area would be ina two or three story configurationinvolving a mixture of housing units. -The "Meadows " Office Area would be anOffice Park with the taller structureslocated nearer the commercial core tolessen the impact on the single-familyresidential community to the sout h. 3.Circulation: -In order to provide proper access to this"internal" development area, streets will need to be widened and extended. 4.Curb Cuts: Woodland He ights and Fairview Road should become collectors and Woodland Heights should be extended to a signalized intersection with Rodney Parham.* -No curb cuts are allowed on Highway 10.All traffic is oriented to the "internal"development. *The staff suggests that once the Urban Village concept isadopted, the Master Street Plan should be amended toreflect the changes in the collector streets. Theamendment of the Master Str eet Plan for the extension ofWoodland Heights Road to Rodney Parham was proposed by thestaff some years prior, but was not approved. 5. Buffers: - A 40 ft. landscaped buffer is proposed on the north side of the project along Highway 10. 6. Submission - PUD Submission Requirements - 10 acre minimum for Rezoning - Any rezoning would need to indicate & Development: its complementary relationship to the remainder of the Village property - A 125 ft. building setback from the Highway 10 centerline. - Grading Plan, extensive hillside cuts to be discouraged. - Maintenance of existing tree cover to be encouraged. AREA 2 1. Land Uses: - office 2. Density: - The eastward site zoned 0 -3 would follow those requirements of the 0 -3 District. No rezoning to PUD would be required. - The density of the west 5 acres would be regulated by a PUD process. Buildings of less than 3 stories in height would be encouraged. 3. Buffer: - A 40 ft. landscaped buffer would be required for the PUD project located on the west 5 acres. The buffer would be located on the west and south property lines. 4. Submission for - A PUD application would be required Rezoning and on the west 5 acres to insure Development: compatibility with the adjacent single - family areas. City of Little Department of Public Works Rock 701 West Markham Little Rock, Arkansas 72201 371-4800 HIGHWAY TRAFFIC IMPACT ANALYSIS July 30, 1986 EXHIBITS 1.STUDY AREA 2.STUDY OBJECTIVES 3.GENERAL ASSUMPTIONS 4.DEVELOPMENT ESTIMATES 5.TRAFFIC GENERATED BY NEW DEVELOPMENTS 6.DAILY TRAFFIC PROJECTIONS 7.PEAK HOUR TRAFFIC AT CANTRELL -RODNEY PARHAM 8.CONCLUSIONS 9.MITIGATING ACTIONS Engineering Division EXHIBIT 2 STUDY OBJECTIVES 1. ANALYZE TRAFFIC IMPACTS OF COMMITTED DEVELOPMENT IN STUDY AREA. 2. ANALYZE ADDITIONAL TRAFFIC IMPACTS ASSOCIATED WITH URBAN VILLAGE PROJECT. 3. EVALUATE FINDINGS WITH RESPECT TO FUTURE TRAFFIC PROBLEMS AND POSSIBLE MITIGATING ACTIONS. EXHIBIT 3 TRAFFIC ASSUMPTIONS 1."THROUGH" TRAFFIC ON CANTRELL WILL INCREASE LINEARLY FROM EXISTING LEVELS TO REACH PROJECTED DAILY VOLUMES PROJECTED BY AHTD FOR YEAR 2005. 2.NON-RESIDENTIAL AREAS WILL GENERALLY BE 50% DEVELOPED BY 1991 AND 100% DEVELOPED BY 2005. 3.NON-RESIDENTIAL AREAS WILL GENERA TE TRAFFIC WHICH WILL BE ADDITIONAL TO THE "THROUGH" TRAFFIC PROJECTED BY AHTD. EXHIBIT 4 DEVELOPMENT ESTIMATES SINGLE MULTI OFFICE OFFICE AREA FAMILY FAMILY (ACRES) (ACRES) UNITS UNITS A 69 B 980 6 5 C 890 4 TOTALS: 0 1,870 79 5 D AS RESIDENTIAL 170 5 D AS "URBAN VILLAGE" 160 20 12 EXHIBIT 5 TRAFFIC GENERATED BY NEW DEVELOPMENT AREAS A,B,C AREA D/RESIDENTIAL AREA D/URBAN VILLAGE Legend xxx (xxx) daily vehicles (vehicles in PM peak hour) YEAR 1991 14,900 (1,925) 375 (75) 4,950 (675) 2005 30,000 (3,850) 2,415 ( 330) 10,100 ( 1,375) EXHIBIT 6 DAILY TRAFFIC PROJECTIONS YEAR 1986 1991 2005 CANTRELL TO EAST 13,700 23,600 35,100 (26,500) (39,200) CANTRELL TO WEST 9,600 12,500 20,500 (13,300) (22,600) RODNEY PARHAM TO SOUTH 8,000 11,400 16,000 (12,400) (17,500) Legend xxx (xxx) Area D as R-Z (Area D as "Urban Village") EXHIBIT 8 CONCLUSIONS 1. CANTRELL EAST OF STUDY AREA WILL REACH PLANNED CAPACITY OF 25,000 VPD WITHIN A FEW YEARS, WITH OR WITHOUT THE "URBAN" VILLAGE PROJECT. 2. BY 2005, TRAFFIC DEMAND EAST OF STUDY AREA IS PROJECTED TO REACH 33,800 VPD WITHOUT THE URBAN VILLAGE PROJECT. WITH THE URBAN VILLAGE PROJECT, THE DEMAND WOULD REACH 39,188 VPD. 3. TRAFFIC TO THE WEST AND SOUTH OF THE STUDY AREA IS PROJECTED TO STAY WITHIN PLANNED CAPACITIES THROUGH 2005, WITH OR WITHOUT THE URBAN VILLAGE PROJECT. 4. LOCAL TRAFFIC OPERATIONS ALONG HWY. 10 WILL BE SOMEWHAT WORSE THAN INDICATED BY THE DAILY TRAVEL PROJECTIONS, DUE TO ITS PROXIMITY TO I -430, PEAK HOUR TRIPS, AND THE GENERAL LACK OF ARTERIALS CROSSING HWY. 10 WITHIN THE VICINITY OF THE STUDY. EXHIBIT 9 POSSIBLE MITIGATING ACTIONS 1. WIDEN, CHANNELIZE AND SIGNALIZE HWY. 10 AT RODNEY- PARHAM. 2. EXPEDITE PLANNING, DESIGN AND CONSTRUCTION OF WEST BELTWAY AND TAYLOR LOOP - HINSON ROAD CONNECTION. 3. CONSTRUCT DIRECT ACCESS ROADWAY FROM URBAN VILLAGE TO RODNEY PARHAM. January 27, 1987 PLANNING HEARING Item No. 4 - Master Street Plan Amendment - South Loop NAME: City of Little Rock LOCATION: A corridor of a principal arterial from I- 430/I -30 interchange to 145th Street REQUEST: To amend the Master Street Plan to refine the alignment of the south loop arterial STAFF REPORT: The Public Works Department retained the consulting firm of Mannes, Castin, and McGetrick to complete a planning and preliminary engineering report for the South Loop Bypass. The study was commissioned to (1) select roadway design, (2) propose alternative alignments, (3) select the best alignment, (4) provide preliminary cost estimates for right -of -way acquisition and road construction, (5) provide preliminary engineering plans and profiles, and (6) develop a strategy for planning implementation and phasing of the project. The report has been completed and is being reviewed by the staff. The consultant has identified the preferred alignment as a result of public hearings and numerous meetings. STAFF RECOMMENDATION: To amend the Master Street Plan to include the South Loop Bypass study dated December 1986. The study will be used as a guide by the City for the development of the South Loop Arterial in years to come. PLANNING COMMISSION ACTION: (1- 27 -87) Don McChesney outlined the South Loop study, noting that the report contained design standards and represented a refinement of the previous approvals of the South Loop alignment. Susan Leatherwood, a resident of the area, spoke neither for nor against. She expressed concern about cars near her bedroom window, possible errors in the study, January 27, 1987 PLANNING HEARING Item No. 4 - Continued and the existence of stop lights. She asked that houses be located 500 feet away from the arterial and that the alignment be kept out of the floodplain. Don McChesney indicated that the alignment was not etched in the stone and that a detailed route alignment would be provided at a later date. He also indicated that he would work with her to resolve the concerns expressed. The Commission discussed the role of developers in paying for the road, control of development in the right -of -way through the platting and water connection processes, payment of compensation if a person accidentally built a building in the right -of -way, and the specificity of the Master Street Plan. After discussion, David Jones moved that the request be approved. The motion was seconded by Jerilyn Nicholson and passed by a vote of 6 ayes, 0 noes, 1 abstention (Massie), and 4 absent. January 27, 1987 There being no further business before the Planning Commission, the meeting was adjourned at 5:20 p.m. Chairman Secretary Date