/
     
5472 RESOLUTION NO 5,472 A RESOLUTION RECOGNIZING CERTAIN PUBLIC PROJECTS AS HAVING PRIORITIES FOR CONSTRUCTION AND THUS ENCROACHMENT IN THE FLOOD PLAIN OF THE ARKANSAS RIVER-LITTLE ROCK REACH; AND FOR OTHER PURPOSES WHEREAS , encroachments in the Arkansas River Flood Plain- Little Rock Reach both authorized and unauthorized at this time have reduced substantially the flood-way capacity of the Arkan- sas River, the result of which mandates that future encroachments be restricted to publicly owned projects serving the general wel- fare of the community; and WHEREAS , it is recognized that the planned Slack-Water Harbor at the Little Rock Port and additional industrial area at said port, the proposed bridge for the East Belt Freeway across the Arkansas River, construction of the new parallel runway at the Little Rock Airport and the plans of North Little Rock for the development of a port and industrial development area in the vicinity of State Highway 130 east of Rose City are all critically needed public projects and thus should be recognized as having the highest priority for construction and thus encroachment into the said Arkansas River Floodway. NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS . SECTION 1. The following identified public projects are recognized by the City of Little Rock as being critically needed for the welfare of the Little Rock Metropolitan area and therefore insofar as the City of Little Rock is concerned are given highest priority for construction and thus encroachment in the Flood Plain of the Arkansas River-Little Rock Reach: 1. Construction of Slack-Water Harbor, an additional industrial area in the Little Rock Port. 2 . Construction of the bridge for the East Belt Free- way across the Arkansas River. 3. Construction of the New Northeast-Southwest parallel Runway at the Little Rock Airport -2- 4. The construction and development of a port and industrial area by North Little Rock in the vicinity of State Highway 130 East of Rose City. SECTION 2 . The U. S. Corps of Engineers is hereby requested to give priority to the issuance of permits for the above named public projects with the understanding that every effort will be made in the planning of such projects to design them so as to keep at a minimum impediments to the flooding capacity of the Arkansas River Flood Plain . SECTION 3. All Agencies, Boards and Commissions of the City of Little Rock responsible in regulation and control of Land Use and Land Use Planning are hereby directed to take notice of the policy of the City of Little Rock as provided by this resolution. SECTION 4. This Resolution shall be in full force and effect from and after its adoption. ADOPTED: January 6, 1976 ATTEST: APPROVED: ity Cler May