No preview available
 /
     
3926 RESOLUTION NO. 3,926 A RESOLUTION AWARDING A CONTRACT FOR FURNITURE, FIXTURES, APPLIANCES AND EQUIPMENT FOR USE IN THE REBSAMEN PARK CLUB HOUSE; AWARDING A CONTRACT FOR CONSTRUCTION OF CURBS , GUTTERS AND SIDEWALKS FOR THE PARKING LOT AT THE REBSAMEN PARK CLUB HOUSE; ALLOCATING THE SUM OF $32, 750.00 FROM FUNDS APPROPRIATED BY ORDINANCE NO. 11,992; AND FOR OTHER PURPOSES. WHEREAS, invitation for bids for furniture, fixtures, appliances and equipment to be used in the Rebsamen Park Club House and for the construction of curbs, gutters and sidewalks for the parking lot near Rebsamen Park Club House have been duly advertised and bids received pursuant thereto in accordance with plans and specifications on file in the office of the Purchasing Agent; and WHEREAS, bids for both said contracts have been received and opened pursuant to said invitations ; and WHEREAS, the Board of Directors desire to award contracts on the bids for furniture, fixtures, appliances and equipment to the lowest responsible and responsive bidders therefor; and WHEREAS, the lowest responsible and responsive bid for the construction and installation of curbs, gutters and sidewalks in the parking lot near Rebsamen Park Club House was submitted by G.B. Malmquist d/b/a Malmquist Concrete Construction in the amount of Three Thousand Three Hundred Twenty Five and NO/100 Dollars ($3, 325.00) and the Board of Directors desire to award a contract for said construction to such low bidder. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE CITY OF LITTLE ROCK, ARKANSAS. SECTION 1. Purchase contracts for the purchase of furn- iture, fixtures, appliances and equipment to be used in the Rebsamen Park Club House are hereby awarded to the persons, firms or corpora- tions shown below for the items and at the prices shown below: -2- SUCCESSFUL ITEM BIDDER TOTAL PRICE (A) 16 - 36" round top Arkansas Stationery tables and Furniture Company $1,267.31 (B) 75 stack type chairs Arkansas Stationery and Furniture Company 1,529.55 (C) 2 counter type stools Arkansas Stationery and Furniture Company 50. 68 (D) 2 cocktail type tables Dixie Equipment Company 143.85 (E) 1 drink box Dean Equipment Co. , Inc. 623.15 (F) 1 cutting block Dean Equipment Co. , Inc. 36.05 (G) 1 - 23' refrigerator- freezer Dixie Equipment Company 537.04 (H) 1 work table-sink Dixie Equipment Company 599.46 (I) 1 griddle Dixie Equipment Company 184.42 (J) 1 deep fry Dixie Equipment Company 123.19 (K) 1 hood Dixie Equipment Company 203.01 (L) 1 ice machine Frank Lyon Company 712. 76 (21) 11 Seats Frank Lyon Company 2, 353.10 SECTION 2. The bid of G.B. Malmquist d/b/a Malmquist Concrete Construction in the amount of Three Thousand Three Hundred Twenty Five and NO/100 Dollars ($3, 325.00) for the construction and installation of curbs, gutters and sidewalks in the parking lot near the Rebsamen Park Club House is hereby accepted and the Mayor and City Clerk are hereby authorized and directed to execute for and on behalf of the City a contract with said bidder for the performance of the work provided for in plans, specifications and bid proposal on file in the office of the Purchasing Agent which contract shall be in form and substance as follows : C O N T R A C T WITNESS this agreement made this day of 196_by and between the City of Little Rock, Arkansas, hereafter called owner and hereafter called CONTRACTOR, wherein the OWNER and CONTRACTOR, for the considerations hereafter set forth , agree as follows : ARTICLE I . SCOPE OF WORK The CONTRACTOR shall furnish all of the materials and perform all of the work shown on the drawings and designated in the specifications entitled : prepared by : and shall do everything required by this Contract, the General Conditions, Special Conditions, drawings, specifications and other contract documents, if any . ARTICLE 2. TIME OF COMPLETION The prosecution of the work by CONTRACTOR shall be commenced within days from issuance of a work order and the work shall be completed within consecutive days thereafter . Liquidated damages shall be assessed against the CONTRACTOR and deducted from final payment at the rate of $ per day for each day following the aforesaid date of completion until the work shall have been completed. ( If no sum is shown * - 2 - in this paragraph, there shall be no liquidated damages applicable to work) . The amount of liquidated damages is acknowledged by both parties as reasonable and is not in the nature of a penalty . ARTICLE 3. CONTRACT SUM OWNER shall pay to the CONTRACTOR for performance of the Contract, subject to proper additions and deductions according to the terms thereof, the following sum : Where the quantities originally contemplated are so changed that enforcement of the Contract sum upon either party shall tend to create an inequity or hardship, there shall be an equitable adjustment of the Contract sum to prevent any such hardship. OWNER reserves the right to make changes in the quantities required hereunder and any such changes shall cause equitable adjustments of the Contract sum . ARTICLE 4. INTERIM AND PROGRESS PAYMENTS OWNER shall make progress payments to the CONTRACTOR, or his assigns, as follows; it . -3- SECTION 3. The sum of Thirty Two Thousand Seven Hundred Fifty and NO/100 Dollars ($32,750.00) heretofore appropriated by Ordinance No. 11,992 is hereby allocated to the following projects and purposes as identified with the amount per project set opposite: (1) Purchase of furniture, fixtures, appliances and equipment for Rebsamen Park Club House allot the sum of $10,000.00 (2) For parking lot, walkway and landscape improvements at Rebsamen Park $17,750.00 (3) For the construction of a truck shed for the Sanitation Department $ 5,000.00 SECTION 4. Upon receipt of the items of furniture, fix- tures, appliances and equipment identified in Section 1 hereof satisfying in full the specifications on file in the office of the Purchasing Agent and upon completion of the construction of the curbs, gutters and sidewalks for the parking lot near Rebsamen Park, in keeping with plans and specifications as provided for in said contract the City Manager and Director of Finance are hereby author- ized and directed to issue the necessary warrant or warrants in payment of the purchase price for said items of personal property and contract price for the construction of said curbs, gutters and sidewalks. SECTION 5. This Resolution shall be in full force and effect from and after its adoption. ADOPTED: February 5, 1958 ATTEST: APPROVED: / If I a 1-Jee ze ,,,/ / / ' City Clerk Mayor